Back to bathroom remodel contractors
Udream Construction
- Based in
- San Francisco
- On San Francisco permits
- Apr 2013 to Nov 2025
- Last 24 months
- 1 permit filed
20 permits since 2000: 18 completed, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
14 bathroom remodel permits: 12 completed, 1 never finaled, 1 expired or cancelled. Typically 1 days from filing to permit and 145 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 10, 2025 | Completed final sign-off Dec 2025 | 60 Stonecrest Dr | like for like kitchen remodel. partial remodel of bathroom on upper floor and half bathroom on main floor. not to include lower level rooms. to correct nov #202543151Details
like for like kitchen remodel. partial remodel of bathroom on upper floor and half bathroom on main floor. not to include lower level rooms. to correct nov #202543151 | $40,000 |
| Jan 3, 2022 | Completed final sign-off Mar 2022 | 8400 Oceanview Tr | unit #302: bathroom update (like for like).Details
unit #302: bathroom update (like for like). | $8,500 |
| Apr 30, 2021 | Completed final sign-off Nov 2021 | 66 Cleary Ct | 1402: in kind kitchen remodel. in kind bathroom remodel. (both master & guest)Details
1402: in kind kitchen remodel. in kind bathroom remodel. (both master & guest) | $30,000 |
| Mar 11, 2021 | Completed final sign-off Aug 2023 | 2096 Fell St | kitchen remodel, upgrade plumb, upgrade ele, upgrade vent roof. connect stove to e gas line, install cabinets countertops, 2 bath remodel, 2 new tub upgrade plumbinb, upgrade elec, upgrade exhaust fan, wet walls inspection 2nd bath new dcurb shower bench upgrade plumb, upgrade elec, mechDetails
kitchen remodel, upgrade plumb, upgrade ele, upgrade vent roof. connect stove to e gas line, install cabinets countertops, 2 bath remodel, 2 new tub upgrade plumbinb, upgrade elec, upgrade exhaust fan, wet walls inspection 2nd bath new dcurb shower bench upgrade plumb, upgrade elec, mech | $45,000 |
| Apr 12, 2019 | Completed final sign-off Feb 2020 | 339 College Av | ground fl only legalize bedroom and family roon, replace (e) bathroom fixture with new. remove (e) wood door at rear and replace with new sliding glass door. add plywood shearwall at rear wall only. legalize (e) bedroom & family room.Details
ground fl only legalize bedroom and family roon, replace (e) bathroom fixture with new. remove (e) wood door at rear and replace with new sliding glass door. add plywood shearwall at rear wall only. legalize (e) bedroom & family room. | $10,000 |
| Feb 16, 2018 | Completed final sign-off Jul 2018 | 80 Dawnview Wy | remodel/update two bathrooms (in kind) on 2nd floorDetails
remodel/update two bathrooms (in kind) on 2nd floor | $16,000 |
| Aug 15, 2017 | Never finaled issued Aug 2017, no final | 1959 19th Av | add 2 bdrms, 2 baths, offices, playroom at gr fl. replace e furnace and water heaterDetails
add 2 bdrms, 2 baths, offices, playroom at gr fl. replace e furnace and water heater | $45,000 |
| Jul 28, 2017 | Completed final sign-off Mar 2018 | 339 College Av | kitchen and bathroom update in kind, replace 19 windows on the second floor, replace 5 street facing windows in kind wood casement windows with matching divided lite panels in kindDetails
kitchen and bathroom update in kind, replace 19 windows on the second floor, replace 5 street facing windows in kind wood casement windows with matching divided lite panels in kind | $30,000 |
| Apr 18, 2016 | Completed final sign-off Jul 2016 | 2127 46th Av | kitchen update - replace cabinet, counter top & tile floor. bathroom update - replace shower, vanity and toilet. replace in kind.Details
kitchen update - replace cabinet, counter top & tile floor. bathroom update - replace shower, vanity and toilet. replace in kind. | $15,000 |
| Mar 15, 2016 | Completed final sign-off Oct 2016 | 1254 Naples St | add 2 bedrooms and 1 full bath in existing ground flDetails
add 2 bedrooms and 1 full bath in existing ground fl | $60,000 |
| Apr 21, 2015 | Completed final sign-off May 2016 | 1315 Silliman St | unit legalization per ordinance 43-14 (existing 1/f family room, bedroom and bathroom, storage room under appln #200806124246)Details
unit legalization per ordinance 43-14 (existing 1/f family room, bedroom and bathroom, storage room under appln #200806124246) | $8,000 |
| Jun 17, 2014 | Expired or cancelled expired Apr 2021 | 1200 Gough St | bathroom remodel - convert bath tub to shower stall. no walls moved, removed or added. all fixture layouts to remain unchangedDetails
bathroom remodel - convert bath tub to shower stall. no walls moved, removed or added. all fixture layouts to remain unchanged | $6,000 |
| Aug 12, 2013 | Completed final sign-off Jan 2014 | 2055 31st Av | 1st floor alter (e) floor layout work included new bedroom, bathroom & laundry, new outlets & light fixtures.Details
1st floor alter (e) floor layout work included new bedroom, bathroom & laundry, new outlets & light fixtures. | $28,000 |
| Apr 1, 2013 | Completed final sign-off Aug 2013 | 2071 31st Av | add one bedroom, two bathrooms, one study room and storage on 1st floor per plan.Details
add one bedroom, two bathrooms, one study room and storage on 1st floor per plan. | $48,000 |