Back to kitchen remodel contractors
Ubr Construction & Roofing Inc
- Based in
- San Francisco
- On San Francisco permits
- Feb 2017 to Apr 2025
- Last 24 months
- 1 permit filed
94 permits since 2000: 91 completed, 1 in progress, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
10 kitchen remodel permits: 10 completed. Typically 0 days from filing to permit and 99 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 6, 2024 | Completed final sign-off May 2024 | 89 Martha Av | remodel of kitchen and 2 full bathrooms and 2 half bathrooms. like for likeDetails
remodel of kitchen and 2 full bathrooms and 2 half bathrooms. like for like | $25,000 |
| Feb 2, 2023 | Completed final sign-off Apr 2024 | 223 Laussat St | interior renovation of (e) kitchen and bathroom on main floor, bathroom addition on basement level.Details
interior renovation of (e) kitchen and bathroom on main floor, bathroom addition on basement level. | $200,000 |
| Aug 4, 2022 | Completed final sign-off Oct 2023 | 75 Park Hill Av | remodel existing one bathroom, kitchen and laundry . add 1 new bathroom. all interior scope on second floor.Details
remodel existing one bathroom, kitchen and laundry . add 1 new bathroom. all interior scope on second floor. | $100,000 |
| Jun 15, 2022 | Completed final sign-off Sep 2022 | 682 09th Av | kitchen remodeling, like for like. removal extg kitchen. installation on a new kitchen cabnets and appliances. upgrade electrical system by code and plumbing systemDetails
kitchen remodeling, like for like. removal extg kitchen. installation on a new kitchen cabnets and appliances. upgrade electrical system by code and plumbing system | $29,000 |
| Feb 11, 2022 | Completed final sign-off May 2022 | 61 Gates St | bathroom fixtures replacing (remodeling) kitchen remodeling (replacement cabinet fixtures)Details
bathroom fixtures replacing (remodeling) kitchen remodeling (replacement cabinet fixtures) | $35,000 |
| Oct 25, 2021 | Completed final sign-off Nov 2021 | 216 Joost Av | kitchen counter top, sink, and fixtures replacement. retile two bathrooms. replace two toilets & two sinks to comply with nov 202183477 & correct nov 202182984.Details
kitchen counter top, sink, and fixtures replacement. retile two bathrooms. replace two toilets & two sinks to comply with nov 202183477 & correct nov 202182984. | $2,000 |
| May 12, 2021 | Completed final sign-off Aug 2021 | 35 Zampa Ln | replace k itchen cabinets, 1 kitchen. replace appliances. replace gfci outlets. 2 light fixtures. non structuralDetails
replace k itchen cabinets, 1 kitchen. replace appliances. replace gfci outlets. 2 light fixtures. non structural | $12,000 |
| Nov 17, 2020 | Completed final sign-off Mar 2021 | 2612 Folsom St | comply with complaint 202062931. replace dryrot t1-11 siding , vinyl siding, water deck 4x10. remove damaged sheetrock at unit 4. kitchen and back porchDetails
comply with complaint 202062931. replace dryrot t1-11 siding , vinyl siding, water deck 4x10. remove damaged sheetrock at unit 4. kitchen and back porch | $10,000 |
| Jan 31, 2019 | Completed final sign-off May 2019 | 1260 Clay St | full bathroom remodeling. change all bathroom, fixtures & tile/replacement tub for shower all at same place. full kitchen remodeling. keep same location of all app. replacing in kind, no structural work.Details
full bathroom remodeling. change all bathroom, fixtures & tile/replacement tub for shower all at same place. full kitchen remodeling. keep same location of all app. replacing in kind, no structural work. | $28,000 |
| Aug 8, 2018 | Completed final sign-off Oct 2018 | 2601 17th Av | remodel bathroom and kitchen, replace kitchen cabinets and appliances, replace bathroom floor, tile, and fixtures.Details
remodel bathroom and kitchen, replace kitchen cabinets and appliances, replace bathroom floor, tile, and fixtures. | $20,000 |