Back to bathroom remodel contractors
Ubr Construction & Roofing Inc
- Based in
- San Francisco
- On San Francisco permits
- Feb 2017 to Apr 2025
- Last 24 months
- 1 permit filed
94 permits since 2000: 91 completed, 1 in progress, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
16 bathroom remodel permits: 16 completed. Typically 0 days from filing to permit and 110 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 9, 2025 | Completed final sign-off Dec 2025 | 198 Park St | interior remodel of 1st floor adding a (n) bathroom , mudroom, to the garage entry and remodel the staircase. no change to the 2nd floor all interior scopeDetails
interior remodel of 1st floor adding a (n) bathroom , mudroom, to the garage entry and remodel the staircase. no change to the 2nd floor all interior scope | $80,000 |
| Feb 6, 2024 | Completed final sign-off May 2024 | 89 Martha Av | remodel of kitchen and 2 full bathrooms and 2 half bathrooms. like for likeDetails
remodel of kitchen and 2 full bathrooms and 2 half bathrooms. like for like | $25,000 |
| Aug 3, 2023 | Completed final sign-off Feb 2024 | 353 Mangels Av | interior renovation of 1st fl: adding a mudroom to entry. renovating the master bedroom & master bath. no changes to 2nd fl. all interior workDetails
interior renovation of 1st fl: adding a mudroom to entry. renovating the master bedroom & master bath. no changes to 2nd fl. all interior work | $40,000 |
| Feb 2, 2023 | Completed final sign-off Apr 2024 | 223 Laussat St | interior renovation of (e) kitchen and bathroom on main floor, bathroom addition on basement level.Details
interior renovation of (e) kitchen and bathroom on main floor, bathroom addition on basement level. | $200,000 |
| Aug 4, 2022 | Completed final sign-off Oct 2023 | 75 Park Hill Av | remodel existing one bathroom, kitchen and laundry . add 1 new bathroom. all interior scope on second floor.Details
remodel existing one bathroom, kitchen and laundry . add 1 new bathroom. all interior scope on second floor. | $100,000 |
| Apr 11, 2022 | Completed final sign-off Jun 2022 | 135 Turquoise Wy | remodeling 3 bathroom, 2 bull bathroom, 1 half bath. replacement of plumbing & electrical fixtures at some areas. new tile.Details
remodeling 3 bathroom, 2 bull bathroom, 1 half bath. replacement of plumbing & electrical fixtures at some areas. new tile. | $33,000 |
| Feb 11, 2022 | Completed final sign-off May 2022 | 61 Gates St | bathroom fixtures replacing (remodeling) kitchen remodeling (replacement cabinet fixtures)Details
bathroom fixtures replacing (remodeling) kitchen remodeling (replacement cabinet fixtures) | $35,000 |
| Jan 20, 2022 | Completed final sign-off Jun 2022 | 3466 17th St | all interior scope. master bedroom to be renovated. new closets and a master bathroom addition.Details
all interior scope. master bedroom to be renovated. new closets and a master bathroom addition. | $45,800 |
| Oct 25, 2021 | Completed final sign-off Nov 2021 | 216 Joost Av | kitchen counter top, sink, and fixtures replacement. retile two bathrooms. replace two toilets & two sinks to comply with nov 202183477 & correct nov 202182984.Details
kitchen counter top, sink, and fixtures replacement. retile two bathrooms. replace two toilets & two sinks to comply with nov 202183477 & correct nov 202182984. | $2,000 |
| Oct 25, 2021 | Completed final sign-off Dec 2021 | 442 Los Palmos Dr | one full bathroom remodeling. replacement of tile, tub, shower pan.Details
one full bathroom remodeling. replacement of tile, tub, shower pan. | $12,000 |
| Feb 1, 2021 | Completed final sign-off Aug 2021 | 133 Baden St | add 1 bathroom in (e) storage space next to garage on 1st fl.Details
add 1 bathroom in (e) storage space next to garage on 1st fl. | $5,000 |
| Nov 4, 2019 | Completed final sign-off Feb 2020 | 1317 Hyde St | apt 5: bathroom: remodeling of (e) shower & sink (replacement) installation new tile & shower pan. installationg new fan & ilght. same szie & same location.Details
apt 5: bathroom: remodeling of (e) shower & sink (replacement) installation new tile & shower pan. installationg new fan & ilght. same szie & same location. | $8,000 |
| Jun 18, 2019 | Completed final sign-off Mar 2020 | 344 Ellis St | unit# 3: remodel bathroom: replace shower; sink; tile at same location. all work in unit # 3. to comply with complaint # 2019588111Details
unit# 3: remodel bathroom: replace shower; sink; tile at same location. all work in unit # 3. to comply with complaint # 2019588111 | $14,200 |
| Jan 31, 2019 | Completed final sign-off May 2019 | 1260 Clay St | full bathroom remodeling. change all bathroom, fixtures & tile/replacement tub for shower all at same place. full kitchen remodeling. keep same location of all app. replacing in kind, no structural work.Details
full bathroom remodeling. change all bathroom, fixtures & tile/replacement tub for shower all at same place. full kitchen remodeling. keep same location of all app. replacing in kind, no structural work. | $28,000 |
| Aug 8, 2018 | Completed final sign-off Oct 2018 | 2601 17th Av | remodel bathroom and kitchen, replace kitchen cabinets and appliances, replace bathroom floor, tile, and fixtures.Details
remodel bathroom and kitchen, replace kitchen cabinets and appliances, replace bathroom floor, tile, and fixtures. | $20,000 |
| Jul 3, 2018 | Completed final sign-off Aug 2018 | 2154 Market St | full bathroom remodeling: r/r all plumbing & electrical fixtures. installation of new plumbing & electrical fixtures.Details
full bathroom remodeling: r/r all plumbing & electrical fixtures. installation of new plumbing & electrical fixtures. | $14,500 |