Tyco Integrated Security
- Based in
- Brisbane
- On San Francisco permits
- Mar 2000 to Jan 2013
- Last 24 months
- 0 permits filed
266 permits since 2000: 60 completed, 112 never finaled, 94 expired or cancelled.
Of the 112 never-finaled permits, 112 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
2 kitchen remodel permits: 2 never finaled. Typically 0 days from filing to permit.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 4, 2011 | Never finaled issued Jan 2011, no final | 345 Taylor St | connect ansul system installed by others in the kitchen to extg control panel for monitoring.Details
connect ansul system installed by others in the kitchen to extg control panel for monitoring. | $3,600 |
| Mar 25, 2009 | Never finaled issued Mar 2009, no final | 580 Geary St | install 2 door hoders in the kitchen in basement, tie wire into existing door release loop that connecting to existing fire control panel located in lobby on 1st floorDetails
install 2 door hoders in the kitchen in basement, tie wire into existing door release loop that connecting to existing fire control panel located in lobby on 1st floor | $4,000 |