Back to kitchen remodel contractors
Tso Chun Hing Const
- Based in
- San Francisco
- On San Francisco permits
- May 2000 to Nov 2025
- Last 24 months
- 2 permits filed
84 permits since 2000: 58 completed, 1 in progress, 12 never finaled, 13 expired or cancelled.
Of the 12 never-finaled permits, 1 is 3 to 5 years old, 1 is 5 to 10 years old, 10 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
9 kitchen remodel permits: 8 completed, 1 never finaled. Typically 0 days from filing to permit and 293 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 25, 2025 | Completed final sign-off Sep 2026 | 3144 Anza St | kitchen remodel, replace cabinets and install 6 light fixtures and 8 outlets. bathroom remodel replace tub with shower pan, patch kitchen ceiling corner with sheetrock.Details
kitchen remodel, replace cabinets and install 6 light fixtures and 8 outlets. bathroom remodel replace tub with shower pan, patch kitchen ceiling corner with sheetrock. | $30,000 |
| Feb 27, 2023 | Completed final sign-off May 2024 | 283 Crescent Av | remodel kitchen and bathroom. replace kitchen cabinet in place. remove bath tub. install new shower pan. install kitchen and bath fan install light throughoutDetails
remodel kitchen and bathroom. replace kitchen cabinet in place. remove bath tub. install new shower pan. install kitchen and bath fan install light throughout | $25,000 |
| Jun 8, 2017 | Completed final sign-off May 2018 | 3336 Laguna St | work in unit 101: remodel kitchen, replace kitchen cabinets in place, kitchen sink and stove to remain in same location.Details
work in unit 101: remodel kitchen, replace kitchen cabinets in place, kitchen sink and stove to remain in same location. | $5,000 |
| Jul 9, 2015 | Completed final sign-off May 2016 | 1971 12th Av | remodel kitchen and bath, new powder room on 1st fl, new family room and bathroom on gr fl. new deck at rearDetails
remodel kitchen and bath, new powder room on 1st fl, new family room and bathroom on gr fl. new deck at rear | $40,000 |
| Jan 9, 2015 | Completed final sign-off Jul 2015 | 465 Marina Bl | replace kitchen cabinets in place.Details
replace kitchen cabinets in place. | $11,000 |
| May 1, 2012 | Completed final sign-off Sep 2012 | 215 21st Av | provide new family room and new full bath at gr fl. remodel e kitchen and e bath on 2nd fl. voluntary seismic upgrade. remove 1 window at facade. reduce curb cut to 10' longDetails
provide new family room and new full bath at gr fl. remodel e kitchen and e bath on 2nd fl. voluntary seismic upgrade. remove 1 window at facade. reduce curb cut to 10' long | $68,000 |
| Oct 22, 2010 | Never finaled issued Oct 2010, no final | 999 Green St | replace kitchen cabinets in place.Details
replace kitchen cabinets in place. | $4,000 |
| Jun 24, 2008 | Completed final sign-off Jul 2009 | 453 Marina Bl | remodel kitchen. replace kitchen cabinets. remove non structural wall. create new study/storage rooms from existing card room/storage. replace floor tiles. all non-structural.Details
remodel kitchen. replace kitchen cabinets. remove non structural wall. create new study/storage rooms from existing card room/storage. replace floor tiles. all non-structural. | $20,000 |
| Mar 8, 2006 | Completed final sign-off Jul 2006 | 1990 17th Av | replace kitchen cabinets place replace ceiling plaster with sheet rock in kitchenDetails
replace kitchen cabinets place replace ceiling plaster with sheet rock in kitchen | $7,000 |