Block 0417A, lot 009
465 Marina Blvd
- City’s use
- Single Family Residential
- Built
- 1930
- Stories
- 3
- Units
- 1
- Rooms
- 6 bedrooms, 5 bathrooms
- Building
- 5,303 sq ft
- Lot
- 4,832 sq ft
- Zoning
- RH1
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
4 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 27, 2020 | Never finaled issued Jun 2020, no final | 465 Marina Bl | Bluestar Development Co | front facade - replace 3 existing windows the same size. old is single pane & new window will be double pane. (living room 114"x80", dining area 117"x80", master bedroom 118"x78") new electrical receptacle near boiler. replace (e) boiler with new hydronic boiler.Details
front facade - replace 3 existing windows the same size. old is single pane & new window will be double pane. (living room 114"x80", dining area 117"x80", master bedroom 118"x78") new electrical receptacle near boiler. replace (e) boiler with new hydronic boiler. | $20,000 |
| Feb 8, 2019 | Completed final sign-off May 2019 | 465 Marina Bl | Clayton Timbrell & Co | legalize work done in 5 bathrooms without permit, to comply with nov201893711. 2 bathrooms on g/f, 1 bathroom on 2/f, 2 bathrooms on 3/f. no structural work. to comly with nov201893711. maher n/a.Details
legalize work done in 5 bathrooms without permit, to comply with nov201893711. 2 bathrooms on g/f, 1 bathroom on 2/f, 2 bathrooms on 3/f. no structural work. to comly with nov201893711. maher n/a. | $50,000 |
| Oct 6, 2016 | Expired or cancelled cancelled Nov 2022 | 465 Marina Bl | infill @ 2/f patio, horiz. rear addition @ 3rd level, new stair pentouse to new roof deck, new entry stair, interior remodel & related struct. work; bedrms (e)- 9 :( proposed 5 - remove 4);bathrooms: existing 5.5 (proposed 6.5 - add 1 @ 3rd floor)(maher ordinance - extended ord. no.155-13 required)Details
infill @ 2/f patio, horiz. rear addition @ 3rd level, new stair pentouse to new roof deck, new entry stair, interior remodel & related struct. work; bedrms (e)- 9 :( proposed 5 - remove 4);bathrooms: existing 5.5 (proposed 6.5 - add 1 @ 3rd floor)(maher ordinance - extended ord. no.155-13 required) | $900,000 | |
| Jan 9, 2015 | Completed final sign-off Jul 2015 | 465 Marina Bl | Tso Chun Hing Const | replace kitchen cabinets in place.Details
replace kitchen cabinets in place. | $11,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Bluestar Development Co, Clayton Timbrell & Co, Tso Chun Hing Const
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.