True Star Builders
- Based in
- San Francisco
- On San Francisco permits
- Nov 2024 to Mar 2026
- Last 24 months
- 7 permits filed
7 permits since 2000: 6 completed, 1 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
4 stairs permits: 4 completed. Typically 16 days from filing to permit and 168 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 17, 2026 | Completed final sign-off Sep 2026 | 401 Holly Park Cr | revision to permit #2026-0123-4407. correct rear yard calculation method, revise rear stair, change 2nd floor rear facing door to window. relocate kitchen, dining, and powder room. add 3/f dormer, roof raise 30" max. no change in plumbing fixture count.Details
revision to permit #2026-0123-4407. correct rear yard calculation method, revise rear stair, change 2nd floor rear facing door to window. relocate kitchen, dining, and powder room. add 3/f dormer, roof raise 30" max. no change in plumbing fixture count. | |
| Jan 23, 2026 | Completed final sign-off Sep 2026 | 401 Holly Park Cr | revison to approved pa#2025-1117-9796. minor rear infills on ground & 2nd flrs. relocate rear stairs, add 3rd flr deck, 1.5 baths, home office, and replace all windows per plans & elevations.Details
revison to approved pa#2025-1117-9796. minor rear infills on ground & 2nd flrs. relocate rear stairs, add 3rd flr deck, 1.5 baths, home office, and replace all windows per plans & elevations. | $200,000 |
| Aug 15, 2025 | Completed final sign-off Dec 2025 | 32 Nebraska St | revision 202502251047- enclose (e) skylight and add (4) new skylights. reconfigure (2) bathrooms and stairs at 2nd floor. reconfigure stair and bathroom and move garage door forward. rev to structural plan to accomodate architectural changesDetails
revision 202502251047- enclose (e) skylight and add (4) new skylights. reconfigure (2) bathrooms and stairs at 2nd floor. reconfigure stair and bathroom and move garage door forward. rev to structural plan to accomodate architectural changes | $5,000 |
| Feb 25, 2025 | Completed final sign-off Dec 2025 | 32 Nebraska St | 1) 645 new condition space on 1st floor. add 2 bathrooms, 2 bedrooms and media room. 2)relocate 2 bath on 2nd floor, remodel kitchen, reduce deck at rear and add stairs connecting 1st and 2nd floor.Details
1) 645 new condition space on 1st floor. add 2 bathrooms, 2 bedrooms and media room. 2)relocate 2 bath on 2nd floor, remodel kitchen, reduce deck at rear and add stairs connecting 1st and 2nd floor. | $150,000 |