7 permits filed

7 permits since 2000: 6 completed, 1 in progress.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywide

Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.

Kitchen remodel permits

AllDeck 2Stairs 4Kitchen remodel 3Bathroom remodel 5

3 kitchen remodel permits: 3 completed. Typically 22 days from filing to permit and 267 days from permit to final inspection.

FiledOutcomeAddressWork described on the permitDeclared cost
Mar 17, 2026Completed
final sign-off Sep 2026
401 Holly Park Crrevision to permit #2026-0123-4407. correct rear yard calculation method, revise rear stair, change 2nd floor rear facing door to window. relocate kitchen, dining, and powder room. add 3/f dormer, roof raise 30" max. no change in plumbing fixture count.
Details
Permit
202603177746
Status
complete
Filed
Mar 17, 2026
Permit issued
May 5, 2026
Final sign-off
Sep 4, 2026
Address
401 Holly Park Cr

revision to permit #2026-0123-4407. correct rear yard calculation method, revise rear stair, change 2nd floor rear facing door to window. relocate kitchen, dining, and powder room. add 3/f dormer, roof raise 30" max. no change in plumbing fixture count.

Open the permit page

Nov 17, 2025Completed
final sign-off Sep 2026
401 Holly Park Crinterior remodel in kind. no exterior changes. 1st floor: renovate (1) bedroom and (1) bathroom; 2nd floor: remodel kitchen; 3rd floor: renovate (2) bedrooms and (1) bathroom. new insulation in ceilings and walls . replace sheetrock. in kind, no wall/wood stud demolition or construction
Details
Permit
202511179796
Status
complete
Filed
Nov 17, 2025
Permit issued
Nov 17, 2025
Final sign-off
Sep 4, 2026
Declared cost
$30,000
Address
401 Holly Park Cr

interior remodel in kind. no exterior changes. 1st floor: renovate (1) bedroom and (1) bathroom; 2nd floor: remodel kitchen; 3rd floor: renovate (2) bedrooms and (1) bathroom. new insulation in ceilings and walls . replace sheetrock. in kind, no wall/wood stud demolition or construction

Open the permit page

$30,000
Feb 25, 2025Completed
final sign-off Dec 2025
32 Nebraska St1) 645 new condition space on 1st floor. add 2 bathrooms, 2 bedrooms and media room. 2)relocate 2 bath on 2nd floor, remodel kitchen, reduce deck at rear and add stairs connecting 1st and 2nd floor.
Details
Permit
202502251047
Status
complete
Filed
Feb 25, 2025
Permit issued
Mar 19, 2025
Final sign-off
Dec 11, 2025
Declared cost
$150,000
Address
32 Nebraska St

1) 645 new condition space on 1st floor. add 2 bathrooms, 2 bedrooms and media room. 2)relocate 2 bath on 2nd floor, remodel kitchen, reduce deck at rear and add stairs connecting 1st and 2nd floor.