Back to kitchen remodel contractors
Triond Remodeling Inc
- Based in
- San Francisco
- On San Francisco permits
- Apr 2021 to Aug 2026
- Last 24 months
- 48 permits filed
95 permits since 2000: 66 completed, 22 in progress, 5 never finaled, 2 expired or cancelled.
Of the 5 never-finaled permits, 4 are 3 to 5 years old, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
41 kitchen remodel permits: 26 completed, 11 in progress, 3 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 140 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 14, 2026 | In progress issued Aug 2026 | 556 Waller St | 3rd floor remodel: relocate kitchen, reconfigure bedrooms and remodel 2 bathrooms add skylights.Details
3rd floor remodel: relocate kitchen, reconfigure bedrooms and remodel 2 bathrooms add skylights. | $80,000 |
| Jun 16, 2026 | In progress filed Jun 2026, not yet issued | 667 36th Av | 2/fl- remodel kitchen and bathroom. add 2x (n) bathrooms and laundry room with (n) closets. all work is interiorDetails
2/fl- remodel kitchen and bathroom. add 2x (n) bathrooms and laundry room with (n) closets. all work is interior | $75,000 |
| May 1, 2026 | In progress issued May 2026 | 350 Wawona St | in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 1 bathroom(s) in 1st fl with 1 shower pan(s). installing gas line.Details
in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 1 bathroom(s) in 1st fl with 1 shower pan(s). installing gas line. | $58,000 |
| Feb 25, 2026 | In progress issued Feb 2026 | 667 36th Av | in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 1 bathroom(s) in 1st fl with 1 shower pan(s).Details
in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 1 bathroom(s) in 1st fl with 1 shower pan(s). | $50,000 |
| Dec 23, 2025 | In progress issued Dec 2025 | 716 Waller St | kitchen and bathroom remodel in kind to include new cabinetry, fiinshes appliances, drywall, outlet(s) lightening and new plumbing fixtures, toilet, and bathtub. minor plumbing and electricalDetails
kitchen and bathroom remodel in kind to include new cabinetry, fiinshes appliances, drywall, outlet(s) lightening and new plumbing fixtures, toilet, and bathtub. minor plumbing and electrical | $30,000 |
| Nov 17, 2025 | Completed final sign-off Feb 2026 | 14 Aztec St | in-kind remodeling of 1 kitchen(s) in 1st flDetails
in-kind remodeling of 1 kitchen(s) in 1st fl | $12,000 |
| Sep 17, 2025 | Completed final sign-off Dec 2025 | 1467 43rd Av | replace approx 1200 sqft siding to cement board, total of 3 walls. replace 6 windows and 1 exterior door non street visible, replace exist dryrot kitchen window header 4x12, remove and reinstall drain pipes at far end of lightwell, add new 200v exterior elec outlet, weatherprf and associate finish.Details
replace approx 1200 sqft siding to cement board, total of 3 walls. replace 6 windows and 1 exterior door non street visible, replace exist dryrot kitchen window header 4x12, remove and reinstall drain pipes at far end of lightwell, add new 200v exterior elec outlet, weatherprf and associate finish. | $20,000 |
| Aug 21, 2025 | Completed final sign-off Apr 2026 | 61 Whitney St | in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 3 bathroom(s) in 1st fl, 2nd fl with 0 shower pan(s).Details
in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 3 bathroom(s) in 1st fl, 2nd fl with 0 shower pan(s). | $60,000 |
| Jun 17, 2025 | Completed final sign-off Aug 2025 | 881 43rd Av | electrical, knob& tube and new house rewire, with panel upgrade, work with drywall repair where the new wire will run and also backyard, there will be stairs to repair in kind, also going to work on faucet replacement in kitchen.Details
electrical, knob& tube and new house rewire, with panel upgrade, work with drywall repair where the new wire will run and also backyard, there will be stairs to repair in kind, also going to work on faucet replacement in kitchen. | $20,000 |
| May 19, 2025 | Completed final sign-off Oct 2025 | 650 Chestnut St | full kitchen remodel: cabintes countertop replacement, drywall work, 2 full bathroom renovation new tiles and tub tiles vanities and tub shower conversion intallation of 20 recessed led lights, fire place adjustment framing for new electric unit. all work inkindDetails
full kitchen remodel: cabintes countertop replacement, drywall work, 2 full bathroom renovation new tiles and tub tiles vanities and tub shower conversion intallation of 20 recessed led lights, fire place adjustment framing for new electric unit. all work inkind | $45,000 |
| Apr 11, 2025 | Completed final sign-off Jul 2025 | 150 Oak Park Dr | 2nd/fl: remodel 1 bathroom and add new bathroom. remodel (e) kitchen, 1st/fl: remodel 1 bathroom. remodel (e) kitchenette. remove (e) external stairs and configure (e) interior stairs. relocate front door from 2nd story to first story at west side. replace (e) vinyl windows at front windows atDetails
2nd/fl: remodel 1 bathroom and add new bathroom. remodel (e) kitchen, 1st/fl: remodel 1 bathroom. remodel (e) kitchenette. remove (e) external stairs and configure (e) interior stairs. relocate front door from 2nd story to first story at west side. replace (e) vinyl windows at front windows at | $200,000 |
| Apr 9, 2025 | Completed final sign-off May 2025 | 231 Dorado Tr | kitchen remodel like for like plumbing up to code and electrical up to codeDetails
kitchen remodel like for like plumbing up to code and electrical up to code | $30,000 |
| Feb 11, 2025 | In progress issued Mar 2025 | 7 Elsie St | interior remodel, windows upgrade complete kitchen and bathroom remodeling structural upgrades electrcal upgrades. add bath next to (e) office on level 1Details
interior remodel, windows upgrade complete kitchen and bathroom remodeling structural upgrades electrcal upgrades. add bath next to (e) office on level 1 | $90,000 |
| Jan 20, 2025 | In progress issued Jan 2025 | 7 Elsie St | in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 1 bathroom(s) in 2nd fl with 1 shower pan(s). need a "green tag" for electrical service equipment.Details
in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 1 bathroom(s) in 2nd fl with 1 shower pan(s). need a "green tag" for electrical service equipment. | $30,000 |
| Dec 19, 2024 | In progress issued Dec 2024 | 1834 40th Av | revision to pa #202409261711 for one bath each floor and only one kitchen. new drywall and insulation per inspector request.Details
revision to pa #202409261711 for one bath each floor and only one kitchen. new drywall and insulation per inspector request. | $40,000 |
| Nov 11, 2024 | Completed final sign-off Dec 2024 | 2583 33rd Av | in-kind remodeling of 1 kitchen(s) in 1st flDetails
in-kind remodeling of 1 kitchen(s) in 1st fl | $12,000 |
| Nov 8, 2024 | Completed final sign-off Mar 2025 | 1485 14th Av | remodel (e) kitchen. all interior work. remove portions of partition wall. kitchen is approx. 140 sq ft.Details
remodel (e) kitchen. all interior work. remove portions of partition wall. kitchen is approx. 140 sq ft. | $60,000 |
| Oct 24, 2024 | In progress issued Oct 2024 | 1340 Potrero Av | interior only: drywall repair and dryrot in kitchen.Details
interior only: drywall repair and dryrot in kitchen. | $3,000 |
| Oct 11, 2024 | In progress filed Oct 2024, not yet issued | 1325 Indiana St | kitchen remodel like for likeDetails
kitchen remodel like for like | $10,000 |
| Oct 3, 2024 | Completed final sign-off Jan 2025 | 280 Spear St | (unit 36b) drywall repair living room, 40 sqft, sharing walls between inside unit(s) like for like. replace kitchen faucet w/ new, run 2 elec. lines to new panel, one for microwave one for induction oven, track light installation w/ transformer in office room. replace 24 breaker panel w/ 30 breaker.Details
(unit 36b) drywall repair living room, 40 sqft, sharing walls between inside unit(s) like for like. replace kitchen faucet w/ new, run 2 elec. lines to new panel, one for microwave one for induction oven, track light installation w/ transformer in office room. replace 24 breaker panel w/ 30 breaker. | $20,000 |
| Sep 26, 2024 | In progress issued Sep 2024 | 1834 40th Av | in-kind remodeling of 1 kitchen(s) in 2nd fl and in-kind remodeling of 2 bathroom(s) in 1st fl, 2nd fl with 2 shower pan(s).Details
in-kind remodeling of 1 kitchen(s) in 2nd fl and in-kind remodeling of 2 bathroom(s) in 1st fl, 2nd fl with 2 shower pan(s). | $40,000 |
| Sep 25, 2024 | Completed final sign-off Feb 2025 | 186 Lippard Av | remodel existing kitchen. add 1 kitchen island. all interior work. upgrade main panel from 100 amp to 200 amp and replace subpanelDetails
remodel existing kitchen. add 1 kitchen island. all interior work. upgrade main panel from 100 amp to 200 amp and replace subpanel | $50,000 |
| Sep 13, 2024 | Expired or cancelled expired Jan 2026 | 4089 25th St | remodel existing kitchen, all interior work, add kitchen island. remove living room fire place built-out (non-structural). move water heater to roofDetails
remodel existing kitchen, all interior work, add kitchen island. remove living room fire place built-out (non-structural). move water heater to roof | $50,000 |
| Jul 29, 2024 | Completed final sign-off Nov 2024 | 218 Corbett Av | like for like kitchen remodel. electrical panel upgrade.Details
like for like kitchen remodel. electrical panel upgrade. | $25,000 |
| Jul 12, 2024 | Completed final sign-off Aug 2025 | 428 Corbett Av | 3/f: remodel existing kitchen and bathroom.Details
3/f: remodel existing kitchen and bathroom. | $65,000 |
| Jul 8, 2024 | Completed final sign-off Sep 2026 | 385 Maynard St | kitchen remodel; replace gas furnace with multi split heat pump.Details
kitchen remodel; replace gas furnace with multi split heat pump. | $80,000 |
| May 24, 2024 | Completed final sign-off Jun 2025 | 330 San Leandro Wy | bathroom remodel inkind and convert toilet to floating tankless. bathroom remodel in kind and tub convert to free standing, kitchen remodel in kind. maintain 15" clear each side toilet and 24" in front. bath 1 approx. 82 sq ft. bath 2 approx. 35 sq ft. kitchen approx. 160 sq ft. no moving walls.Details
bathroom remodel inkind and convert toilet to floating tankless. bathroom remodel in kind and tub convert to free standing, kitchen remodel in kind. maintain 15" clear each side toilet and 24" in front. bath 1 approx. 82 sq ft. bath 2 approx. 35 sq ft. kitchen approx. 160 sq ft. no moving walls. | $45,000 |
| May 20, 2024 | Completed final sign-off Oct 2024 | 32 Bradford St | reference permit# 202404129887: replace kitchen penninsula with kitchen island. all interior work. add (2) beams to support roof/ceiling.Details
reference permit# 202404129887: replace kitchen penninsula with kitchen island. all interior work. add (2) beams to support roof/ceiling. | |
| May 10, 2024 | Completed final sign-off May 2024 | 1770 Pacific Av | 3 windows installation (1) window in bedroom not visible from street 2 other in the kitchen some visible.Details
3 windows installation (1) window in bedroom not visible from street 2 other in the kitchen some visible. | $5,000 |
| Apr 15, 2024 | Completed final sign-off Mar 2025 | 2211 21st Av | like for like kitchen remodel electrical & plumbing. main panel & home electrical upgrade. replace sink faucet fixture in bathrooms. replace hot water heater. repair drain for washer.Details
like for like kitchen remodel electrical & plumbing. main panel & home electrical upgrade. replace sink faucet fixture in bathrooms. replace hot water heater. repair drain for washer. | $10,000 |
| Apr 15, 2024 | Completed final sign-off Oct 2024 | 733 Front St | unit 506- kitchen and 2x bathroom remodel in kind no wall removal. includes converting jacuzzi to tub and bathtub into shower. no removal of wallsDetails
unit 506- kitchen and 2x bathroom remodel in kind no wall removal. includes converting jacuzzi to tub and bathtub into shower. no removal of walls | $50,000 |
| Apr 12, 2024 | Completed final sign-off Oct 2024 | 32 Bradford St | in-kind remodeling of 1 kitchen(s) in 1st flDetails
in-kind remodeling of 1 kitchen(s) in 1st fl | $30,000 |
| May 30, 2023 | Completed final sign-off Oct 2023 | 1537 Shrader St | 1 kitchen remodeling in-kind, replace plumbing fixtures update emp up to code replace hood 9 new rl under cabinet lighting, replace all appliancesDetails
1 kitchen remodeling in-kind, replace plumbing fixtures update emp up to code replace hood 9 new rl under cabinet lighting, replace all appliances | $25,000 |
| May 24, 2023 | Completed final sign-off Oct 2023 | 1099 Mississippi St | kitchen remodeling like for like. replace all plumbing fixtures, hood replacement. new rl bring kitchen up to code.Details
kitchen remodeling like for like. replace all plumbing fixtures, hood replacement. new rl bring kitchen up to code. | $24,000 |
| May 17, 2023 | Completed final sign-off Feb 2024 | 3231 Moraga St | remodel (e) kitchen. increase wall openings into kitchen. update home electrical. replace living room, dining room, kitchen, and bedroom windows in-kind. add new skylight at kitchen. all work within existing building envelope.Details
remodel (e) kitchen. increase wall openings into kitchen. update home electrical. replace living room, dining room, kitchen, and bedroom windows in-kind. add new skylight at kitchen. all work within existing building envelope. | $20,000 |
| Apr 19, 2023 | Completed final sign-off Oct 2023 | 1374 Hayes St | interior remodel of kitchen on the 4th floor.Details
interior remodel of kitchen on the 4th floor. | $38,000 |
| Dec 12, 2022 | Never finaled issued Apr 2023, no final | 90 San Benito Wy | on 1st floor: kitchen remodel with wall removal as shown on proposed plans.Details
on 1st floor: kitchen remodel with wall removal as shown on proposed plans. | $60,000 |
| Jan 10, 2022 | Completed final sign-off Nov 2022 | 174 Brewster St | kitchen remodel - like for like.Details
kitchen remodel - like for like. | $25,000 |
| Oct 5, 2021 | Never finaled issued Sep 2023, no final | 1133 Wisconsin St | an (e) two floor single family home, w/ the following scope: (1) convert part of 1fl garage to living space, (2) expanding building to the rear, (3) add additional floor above, (4) add 3 bedrooms & 3 baths, & remodel (5) remodel (e) kitchen, bath and other living spaces.Details
an (e) two floor single family home, w/ the following scope: (1) convert part of 1fl garage to living space, (2) expanding building to the rear, (3) add additional floor above, (4) add 3 bedrooms & 3 baths, & remodel (5) remodel (e) kitchen, bath and other living spaces. | $450,000 |
| May 24, 2021 | Never finaled issued May 2021, no final | 2538 Lake St | 2 bathroom remodel & 1 kitchen. replace all appliances, replace hood, replace plumbing fixtures. 16 windows ufactor 0.30 or better.replace back and side of the house. full electrical upgrade, new panel. update mep up to code. remove all plaster wall and replace with sheetrock & insulation.Details
2 bathroom remodel & 1 kitchen. replace all appliances, replace hood, replace plumbing fixtures. 16 windows ufactor 0.30 or better.replace back and side of the house. full electrical upgrade, new panel. update mep up to code. remove all plaster wall and replace with sheetrock & insulation. | $75,000 |
| Apr 28, 2021 | Completed final sign-off Apr 2024 | 866 Brussels St | add 70 sqft at each fl lvl of(n) conditioned spc at north prop ln- 140 sqft total. interior alterations to (e) main lvl kitchen & portion of lower/ garage lvl becomes finished rec rm, laundry & full bathDetails
add 70 sqft at each fl lvl of(n) conditioned spc at north prop ln- 140 sqft total. interior alterations to (e) main lvl kitchen & portion of lower/ garage lvl becomes finished rec rm, laundry & full bath | $200,000 |