Back to bathroom remodel contractors
Triond Remodeling Inc
- Based in
- San Francisco
- On San Francisco permits
- Apr 2021 to Aug 2026
- Last 24 months
- 48 permits filed
95 permits since 2000: 66 completed, 22 in progress, 5 never finaled, 2 expired or cancelled.
Of the 5 never-finaled permits, 4 are 3 to 5 years old, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
47 bathroom remodel permits: 31 completed, 14 in progress, 2 never finaled. Typically 0 days from filing to permit and 113 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 14, 2026 | In progress issued Aug 2026 | 556 Waller St | 3rd floor remodel: relocate kitchen, reconfigure bedrooms and remodel 2 bathrooms add skylights.Details
3rd floor remodel: relocate kitchen, reconfigure bedrooms and remodel 2 bathrooms add skylights. | $80,000 |
| Aug 10, 2026 | In progress issued Aug 2026 | 1675 York St | 3rd floor: remodel bathroom, convert existing office to playroom and add dormer.Details
3rd floor: remodel bathroom, convert existing office to playroom and add dormer. | $50,000 |
| Jul 28, 2026 | In progress issued Jul 2026 | 631 19th Av | in-kind remodeling of 2 bathroom(s) in 2nd fl with 2 shower pan(s).Details
in-kind remodeling of 2 bathroom(s) in 2nd fl with 2 shower pan(s). | $35,000 |
| Jun 16, 2026 | In progress filed Jun 2026, not yet issued | 667 36th Av | 2/fl- remodel kitchen and bathroom. add 2x (n) bathrooms and laundry room with (n) closets. all work is interiorDetails
2/fl- remodel kitchen and bathroom. add 2x (n) bathrooms and laundry room with (n) closets. all work is interior | $75,000 |
| May 12, 2026 | Completed final sign-off Jul 2026 | 240 San Benito Wy | bathroom remodel, tub to shower conversion, wall tiles, flooring, vanity, and all fixtures. repair shower pan framing, concrete base, and cement board. new drywall and waterproofing the membrane, new floor tiles and shower wall tiles, new vanit cabinets and recessed lighting. plumbing and electricalDetails
bathroom remodel, tub to shower conversion, wall tiles, flooring, vanity, and all fixtures. repair shower pan framing, concrete base, and cement board. new drywall and waterproofing the membrane, new floor tiles and shower wall tiles, new vanit cabinets and recessed lighting. plumbing and electrical | $15,000 |
| May 1, 2026 | In progress issued May 2026 | 350 Wawona St | in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 1 bathroom(s) in 1st fl with 1 shower pan(s). installing gas line.Details
in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 1 bathroom(s) in 1st fl with 1 shower pan(s). installing gas line. | $58,000 |
| Mar 2, 2026 | Completed final sign-off Jun 2026 | 145 Del Vale Av | in-kind remodeling of 2 bathroom(s) in 1st fl, 2nd fl with 2 shower pan(s).Details
in-kind remodeling of 2 bathroom(s) in 1st fl, 2nd fl with 2 shower pan(s). | $50,000 |
| Feb 25, 2026 | In progress issued Feb 2026 | 667 36th Av | in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 1 bathroom(s) in 1st fl with 1 shower pan(s).Details
in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 1 bathroom(s) in 1st fl with 1 shower pan(s). | $50,000 |
| Jan 14, 2026 | Completed final sign-off Mar 2026 | 2872 25th St | in-kind remodeling of 1 bathroom(s) in 1st fl with 0 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 1st fl with 0 shower pan(s). | $12,000 |
| Dec 23, 2025 | In progress issued Dec 2025 | 716 Waller St | kitchen and bathroom remodel in kind to include new cabinetry, fiinshes appliances, drywall, outlet(s) lightening and new plumbing fixtures, toilet, and bathtub. minor plumbing and electricalDetails
kitchen and bathroom remodel in kind to include new cabinetry, fiinshes appliances, drywall, outlet(s) lightening and new plumbing fixtures, toilet, and bathtub. minor plumbing and electrical | $30,000 |
| Sep 24, 2025 | In progress issued Sep 2025 | 328 Caselli Av | interior remodel. floor 1: move range & replace (e) patio door with french door. floor 2: move bath wall 17", remodel bath & replace windowDetails
interior remodel. floor 1: move range & replace (e) patio door with french door. floor 2: move bath wall 17", remodel bath & replace window | $57,800 |
| Aug 21, 2025 | Completed final sign-off Apr 2026 | 61 Whitney St | in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 3 bathroom(s) in 1st fl, 2nd fl with 0 shower pan(s).Details
in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 3 bathroom(s) in 1st fl, 2nd fl with 0 shower pan(s). | $60,000 |
| Jul 18, 2025 | Completed final sign-off Oct 2025 | 2368 Union St | remodel two bathrooms, in kind. replace of bathtub/shower, vanity, flooring. install shower valves, shower pans, plumbing and shower lines. full electrical updgrade in bathrooms areas. install new lights above vanity, replace existing recessed lights to new light fixtures. each bathroom approx 45sf.Details
remodel two bathrooms, in kind. replace of bathtub/shower, vanity, flooring. install shower valves, shower pans, plumbing and shower lines. full electrical updgrade in bathrooms areas. install new lights above vanity, replace existing recessed lights to new light fixtures. each bathroom approx 45sf. | $20,000 |
| May 19, 2025 | Completed final sign-off Oct 2025 | 650 Chestnut St | full kitchen remodel: cabintes countertop replacement, drywall work, 2 full bathroom renovation new tiles and tub tiles vanities and tub shower conversion intallation of 20 recessed led lights, fire place adjustment framing for new electric unit. all work inkindDetails
full kitchen remodel: cabintes countertop replacement, drywall work, 2 full bathroom renovation new tiles and tub tiles vanities and tub shower conversion intallation of 20 recessed led lights, fire place adjustment framing for new electric unit. all work inkind | $45,000 |
| Apr 25, 2025 | Completed final sign-off Jun 2025 | 2979 23rd St | bathroom remodel: like for like, with subway tile installation and cast iron tub refinishing.Details
bathroom remodel: like for like, with subway tile installation and cast iron tub refinishing. | $16,000 |
| Apr 22, 2025 | Completed final sign-off Jun 2025 | 14 Aztec St | in-kind remodeling of 1 bathroom(s) in 1st fl with 1 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 1st fl with 1 shower pan(s). | $16,000 |
| Apr 11, 2025 | Completed final sign-off Jul 2025 | 150 Oak Park Dr | 2nd/fl: remodel 1 bathroom and add new bathroom. remodel (e) kitchen, 1st/fl: remodel 1 bathroom. remodel (e) kitchenette. remove (e) external stairs and configure (e) interior stairs. relocate front door from 2nd story to first story at west side. replace (e) vinyl windows at front windows atDetails
2nd/fl: remodel 1 bathroom and add new bathroom. remodel (e) kitchen, 1st/fl: remodel 1 bathroom. remodel (e) kitchenette. remove (e) external stairs and configure (e) interior stairs. relocate front door from 2nd story to first story at west side. replace (e) vinyl windows at front windows at | $200,000 |
| Mar 17, 2025 | Completed final sign-off Sep 2025 | 2028 14th Av | in-kind remodeling of 1 bathroom(s) in 2nd fl with 1 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 2nd fl with 1 shower pan(s). | $13,000 |
| Feb 11, 2025 | In progress issued Mar 2025 | 7 Elsie St | interior remodel, windows upgrade complete kitchen and bathroom remodeling structural upgrades electrcal upgrades. add bath next to (e) office on level 1Details
interior remodel, windows upgrade complete kitchen and bathroom remodeling structural upgrades electrcal upgrades. add bath next to (e) office on level 1 | $90,000 |
| Jan 20, 2025 | In progress issued Jan 2025 | 7 Elsie St | in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 1 bathroom(s) in 2nd fl with 1 shower pan(s). need a "green tag" for electrical service equipment.Details
in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 1 bathroom(s) in 2nd fl with 1 shower pan(s). need a "green tag" for electrical service equipment. | $30,000 |
| Jan 7, 2025 | Completed final sign-off Apr 2025 | 165 Nevada St | like for like bathroom remodel at 2nd floorDetails
like for like bathroom remodel at 2nd floor | $21,000 |
| Dec 19, 2024 | In progress issued Dec 2024 | 1834 40th Av | revision to pa #202409261711 for one bath each floor and only one kitchen. new drywall and insulation per inspector request.Details
revision to pa #202409261711 for one bath each floor and only one kitchen. new drywall and insulation per inspector request. | $40,000 |
| Nov 14, 2024 | Completed final sign-off Jan 2025 | 2827 Pierce St | in-kind remodeling of 1 bathroom(s) in 2nd fl with 1 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 2nd fl with 1 shower pan(s). | $12,000 |
| Nov 7, 2024 | In progress issued Nov 2024 | 726 Dartmouth St | in-kind remodeling of 1 bathroom(s) in 1st fl with 1 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 1st fl with 1 shower pan(s). | $12,000 |
| Oct 21, 2024 | Completed final sign-off Jul 2025 | 1465 Valencia St | convert (e) powder room to ada all gender bathroom on ground floor. barrier removalDetails
convert (e) powder room to ada all gender bathroom on ground floor. barrier removal | $40,000 |
| Oct 14, 2024 | Completed final sign-off Nov 2024 | 109 Glenview Dr | in-kind remodeling of 1 bathroom(s) in 1st fl with 1 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 1st fl with 1 shower pan(s). | $12,000 |
| Sep 26, 2024 | In progress issued Sep 2024 | 1834 40th Av | in-kind remodeling of 1 kitchen(s) in 2nd fl and in-kind remodeling of 2 bathroom(s) in 1st fl, 2nd fl with 2 shower pan(s).Details
in-kind remodeling of 1 kitchen(s) in 2nd fl and in-kind remodeling of 2 bathroom(s) in 1st fl, 2nd fl with 2 shower pan(s). | $40,000 |
| Sep 24, 2024 | Completed final sign-off Nov 2024 | 1792 Page St | convert walk in closet to master bathroom. new closet in master bedroom. no exterior workDetails
convert walk in closet to master bathroom. new closet in master bedroom. no exterior work | $30,000 |
| Aug 12, 2024 | In progress issued Aug 2024 | 716 Douglass St | painting and drywall repair, only patching,simple repair, no changes, in bathroom area.Details
painting and drywall repair, only patching,simple repair, no changes, in bathroom area. | $10,000 |
| Jul 12, 2024 | Completed final sign-off Aug 2025 | 428 Corbett Av | 3/f: remodel existing kitchen and bathroom.Details
3/f: remodel existing kitchen and bathroom. | $65,000 |
| May 24, 2024 | Completed final sign-off Jun 2025 | 330 San Leandro Wy | bathroom remodel inkind and convert toilet to floating tankless. bathroom remodel in kind and tub convert to free standing, kitchen remodel in kind. maintain 15" clear each side toilet and 24" in front. bath 1 approx. 82 sq ft. bath 2 approx. 35 sq ft. kitchen approx. 160 sq ft. no moving walls.Details
bathroom remodel inkind and convert toilet to floating tankless. bathroom remodel in kind and tub convert to free standing, kitchen remodel in kind. maintain 15" clear each side toilet and 24" in front. bath 1 approx. 82 sq ft. bath 2 approx. 35 sq ft. kitchen approx. 160 sq ft. no moving walls. | $45,000 |
| May 24, 2024 | Completed final sign-off Jul 2024 | 345 Madison St | remodel bathroom, install new vanity and toilet and replace lights. all fixtures to remain in the same location. no moving walls. approx. 48 sq ft.Details
remodel bathroom, install new vanity and toilet and replace lights. all fixtures to remain in the same location. no moving walls. approx. 48 sq ft. | $15,000 |
| Apr 29, 2024 | Completed final sign-off Sep 2024 | 1250 Clay St | remodel (e) bathroom. remodel in kind. convert closet space to laundry closet. ventless dryer.Details
remodel (e) bathroom. remodel in kind. convert closet space to laundry closet. ventless dryer. | $15,000 |
| Apr 15, 2024 | Completed final sign-off Mar 2025 | 2211 21st Av | like for like kitchen remodel electrical & plumbing. main panel & home electrical upgrade. replace sink faucet fixture in bathrooms. replace hot water heater. repair drain for washer.Details
like for like kitchen remodel electrical & plumbing. main panel & home electrical upgrade. replace sink faucet fixture in bathrooms. replace hot water heater. repair drain for washer. | $10,000 |
| Apr 15, 2024 | Completed final sign-off Oct 2024 | 733 Front St | unit 506- kitchen and 2x bathroom remodel in kind no wall removal. includes converting jacuzzi to tub and bathtub into shower. no removal of wallsDetails
unit 506- kitchen and 2x bathroom remodel in kind no wall removal. includes converting jacuzzi to tub and bathtub into shower. no removal of walls | $50,000 |
| Apr 2, 2024 | Completed final sign-off Jan 2025 | 86 Joost Av | in-kind remodeling of 1 bathroom(s) in 1st fl with 1 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 1st fl with 1 shower pan(s). | $30,000 |
| Nov 8, 2023 | Completed final sign-off Jul 2024 | 1406 Cole St | 2/f: like for like remodel of master bathroom. layout change remodel in 2nd bathroom: relocate toilet and sink. reorient closet b/t bathroom and bedroom to make (e) closet space open for toilet location. upgrade electrical and plumbing to code. install new lights and receptacles in bedroom.Details
2/f: like for like remodel of master bathroom. layout change remodel in 2nd bathroom: relocate toilet and sink. reorient closet b/t bathroom and bedroom to make (e) closet space open for toilet location. upgrade electrical and plumbing to code. install new lights and receptacles in bedroom. | $40,000 |
| Nov 2, 2023 | Completed final sign-off Dec 2023 | 4507 19th St | like for like in kind remodel of (1) bathroom. upgrade electrical and plumbing to code as required.Details
like for like in kind remodel of (1) bathroom. upgrade electrical and plumbing to code as required. | $10,000 |
| Dec 30, 2022 | Completed final sign-off Nov 2024 | 75 07th Av | excavate garage to park taller vehicle, relocate laundry,bath & utilities @ basement/garage level of home.new fau,new waterheater,(n)multi-panel door to rear yard.new footings & beams.new windows @ rear,new garage door & driveway apron within parcel.no change to public way.Details
excavate garage to park taller vehicle, relocate laundry,bath & utilities @ basement/garage level of home.new fau,new waterheater,(n)multi-panel door to rear yard.new footings & beams.new windows @ rear,new garage door & driveway apron within parcel.no change to public way. | $199,000 |
| Jun 14, 2022 | Completed final sign-off Nov 2022 | 174 Brewster St | 3 1/2 bathroom remodel like for like replace. all plumbing fixtures, replace tub, showers, replace fans, replace light, update e/m/p up to code.Details
3 1/2 bathroom remodel like for like replace. all plumbing fixtures, replace tub, showers, replace fans, replace light, update e/m/p up to code. | $36,000 |
| Jun 7, 2022 | Completed final sign-off Aug 2022 | 1819 30th Av | in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s). | $18,000 |
| Feb 22, 2022 | Completed final sign-off Jun 2022 | 126 Lenox Wy | like for like - three bathroom remodels. non structuralDetails
like for like - three bathroom remodels. non structural | $90,000 |
| Jan 6, 2022 | Completed final sign-off Jun 2022 | 477 Frederick St | like for like bathroom remodeling on 2nd floor. non structuralDetails
like for like bathroom remodeling on 2nd floor. non structural | $30,000 |
| Nov 2, 2021 | Completed final sign-off Jan 2022 | 1920 14th Av | one bathroom remodel like for like replacement of toilet , shower, bath, galv pipes replaced with copper. relocation of siwthc and new outlets x 2Details
one bathroom remodel like for like replacement of toilet , shower, bath, galv pipes replaced with copper. relocation of siwthc and new outlets x 2 | $15,000 |
| Oct 5, 2021 | Never finaled issued Sep 2023, no final | 1133 Wisconsin St | an (e) two floor single family home, w/ the following scope: (1) convert part of 1fl garage to living space, (2) expanding building to the rear, (3) add additional floor above, (4) add 3 bedrooms & 3 baths, & remodel (5) remodel (e) kitchen, bath and other living spaces.Details
an (e) two floor single family home, w/ the following scope: (1) convert part of 1fl garage to living space, (2) expanding building to the rear, (3) add additional floor above, (4) add 3 bedrooms & 3 baths, & remodel (5) remodel (e) kitchen, bath and other living spaces. | $450,000 |
| May 24, 2021 | Never finaled issued May 2021, no final | 2538 Lake St | 2 bathroom remodel & 1 kitchen. replace all appliances, replace hood, replace plumbing fixtures. 16 windows ufactor 0.30 or better.replace back and side of the house. full electrical upgrade, new panel. update mep up to code. remove all plaster wall and replace with sheetrock & insulation.Details
2 bathroom remodel & 1 kitchen. replace all appliances, replace hood, replace plumbing fixtures. 16 windows ufactor 0.30 or better.replace back and side of the house. full electrical upgrade, new panel. update mep up to code. remove all plaster wall and replace with sheetrock & insulation. | $75,000 |
| Apr 28, 2021 | Completed final sign-off Apr 2024 | 866 Brussels St | add 70 sqft at each fl lvl of(n) conditioned spc at north prop ln- 140 sqft total. interior alterations to (e) main lvl kitchen & portion of lower/ garage lvl becomes finished rec rm, laundry & full bathDetails
add 70 sqft at each fl lvl of(n) conditioned spc at north prop ln- 140 sqft total. interior alterations to (e) main lvl kitchen & portion of lower/ garage lvl becomes finished rec rm, laundry & full bath | $200,000 |