Back to kitchen remodel contractors
Trejo Construction
- Based in
- San Francisco
- On San Francisco permits
- Dec 2022 to May 2026
- Last 24 months
- 8 permits filed
20 permits since 2000: 14 completed, 3 in progress, 3 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
4 kitchen remodel permits: 2 completed, 2 expired or cancelled. Typically 7 days from filing to permit and 128 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 2, 2026 | Completed final sign-off Aug 2026 | 2480 Fulton St | unit 4: to remove and replace existing kitchen and existing laundry which was present at the time of purchase in order to reinforce the existing 2 structural studs which were cut as per the structural drawings / notes. (to comply with complaint 202545915)Details
unit 4: to remove and replace existing kitchen and existing laundry which was present at the time of purchase in order to reinforce the existing 2 structural studs which were cut as per the structural drawings / notes. (to comply with complaint 202545915) | $1,500 |
| Dec 10, 2024 | Expired or cancelled withdrawn Aug 2026 | 2776 Broadway | revision to sfdbi pn#:2024-0216-6040 revised steel brace in kitchen (interior work only), see structural drawing and calulations.Details
revision to sfdbi pn#:2024-0216-6040 revised steel brace in kitchen (interior work only), see structural drawing and calulations. | |
| Jan 24, 2023 | Expired or cancelled cancelled Jan 2026 | 1438 Underwood Av | kitchen remodeling - new cabinets, electric, and plumbing.Details
kitchen remodeling - new cabinets, electric, and plumbing. | $27,000 |
| Dec 2, 2022 | Completed final sign-off Feb 2023 | 1939 Judah St | renovation of (e) kitchen @ 3rd fl - (n) kitchen, (n) bathroom within (e) kitchen space; (n) window replacement in-kind (rear of bldg); (n) fixture replacement in-kind @ bathroom #1; (n) elec, plumbing as requiredDetails
renovation of (e) kitchen @ 3rd fl - (n) kitchen, (n) bathroom within (e) kitchen space; (n) window replacement in-kind (rear of bldg); (n) fixture replacement in-kind @ bathroom #1; (n) elec, plumbing as required | $15,000 |