Permit GraphShortlistSan Francisco building permits since 2000

Trejo Construction

Contractor license
1095545
State license record
Based in
San Francisco
On San Francisco permits
Dec 2022 to May 2026
Last 24 months
8 permits filed

20 permits since 2000: 14 completed, 3 in progress, 3 expired or cancelled.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywide

Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.

Kitchen remodel permits

AllRoof deck 1Kitchen remodel 4Bathroom remodel 5

4 kitchen remodel permits: 2 completed, 2 expired or cancelled. Typically 7 days from filing to permit and 128 days from permit to final inspection.

FiledOutcomeAddressWork described on the permitDeclared cost
Feb 2, 2026Completed
final sign-off Aug 2026
2480 Fulton Stunit 4: to remove and replace existing kitchen and existing laundry which was present at the time of purchase in order to reinforce the existing 2 structural studs which were cut as per the structural drawings / notes. (to comply with complaint 202545915)
Details
Permit
202602025061
Status
complete
Filed
Feb 2, 2026
Permit issued
Feb 9, 2026
Final sign-off
Aug 6, 2026
Declared cost
$1,500
Address
2480 Fulton St

unit 4: to remove and replace existing kitchen and existing laundry which was present at the time of purchase in order to reinforce the existing 2 structural studs which were cut as per the structural drawings / notes. (to comply with complaint 202545915)

Open the permit page

$1,500
Dec 10, 2024Expired or cancelled
withdrawn Aug 2026
2776 Broadwayrevision to sfdbi pn#:2024-0216-6040 revised steel brace in kitchen (interior work only), see structural drawing and calulations.
Details
Permit
202411124848
Status
withdrawn
Filed
Dec 10, 2024
Address
2776 Broadway

revision to sfdbi pn#:2024-0216-6040 revised steel brace in kitchen (interior work only), see structural drawing and calulations.

Open the permit page

Jan 24, 2023Expired or cancelled
cancelled Jan 2026
1438 Underwood Avkitchen remodeling - new cabinets, electric, and plumbing.
Details
Permit
202301240670
Status
cancelled
Filed
Jan 24, 2023
Declared cost
$27,000
Address
1438 Underwood Av

kitchen remodeling - new cabinets, electric, and plumbing.

Open the permit page

$27,000
Dec 2, 2022Completed
final sign-off Feb 2023
1939 Judah Strenovation of (e) kitchen @ 3rd fl - (n) kitchen, (n) bathroom within (e) kitchen space; (n) window replacement in-kind (rear of bldg); (n) fixture replacement in-kind @ bathroom #1; (n) elec, plumbing as required
Details
Permit
202212027550
Status
complete
Filed
Dec 2, 2022
Permit issued
Dec 9, 2022
Final sign-off
Feb 24, 2023
Declared cost
$15,000
Address
1939 Judah St

renovation of (e) kitchen @ 3rd fl - (n) kitchen, (n) bathroom within (e) kitchen space; (n) window replacement in-kind (rear of bldg); (n) fixture replacement in-kind @ bathroom #1; (n) elec, plumbing as required

Open the permit page

$15,000