Back to bathroom remodel contractors
Trejo Construction
- Based in
- San Francisco
- On San Francisco permits
- Dec 2022 to May 2026
- Last 24 months
- 8 permits filed
20 permits since 2000: 14 completed, 3 in progress, 3 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
5 bathroom remodel permits: 4 completed, 1 in progress. Typically 7 days from filing to permit and 89 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 11, 2025 | In progress issued Jun 2026 | 72 Valmar Tr | 1st floor interior remodel. existing wsaher dryer relocated from e bedroom 1 to e bath 1. a total of 2 existing windows and 1 existing door to be removed in e bedroom 1, e bedroom 1 to include new french doors. e bath to be remodeled per floor plan drawing sheet a-4.1Details
1st floor interior remodel. existing wsaher dryer relocated from e bedroom 1 to e bath 1. a total of 2 existing windows and 1 existing door to be removed in e bedroom 1, e bedroom 1 to include new french doors. e bath to be remodeled per floor plan drawing sheet a-4.1 | $20,000 |
| Dec 26, 2023 | Completed final sign-off Feb 2024 | 285 Paris St | one partial bathroom remodel: electrical outlets added, plumbing - change out tub for shower area. change (e) sink.Details
one partial bathroom remodel: electrical outlets added, plumbing - change out tub for shower area. change (e) sink. | $2,000 |
| Jan 24, 2023 | Completed final sign-off May 2023 | 200 Brannan St | (1) bathroom remodeling - no changes, same as before. shower, vanity, mirror, toilet. #112Details
(1) bathroom remodeling - no changes, same as before. shower, vanity, mirror, toilet. #112 | $9,800 |
| Dec 28, 2022 | Completed final sign-off May 2023 | 2414 Union St | 2414 union: demolition of partition at (e) dining room. expasion of (e) water closet. remodel of (e) bathroom. 2416 union: expansion of (e) bathroom.Details
2414 union: demolition of partition at (e) dining room. expasion of (e) water closet. remodel of (e) bathroom. 2416 union: expansion of (e) bathroom. | $50,000 |
| Dec 2, 2022 | Completed final sign-off Feb 2023 | 1939 Judah St | renovation of (e) kitchen @ 3rd fl - (n) kitchen, (n) bathroom within (e) kitchen space; (n) window replacement in-kind (rear of bldg); (n) fixture replacement in-kind @ bathroom #1; (n) elec, plumbing as requiredDetails
renovation of (e) kitchen @ 3rd fl - (n) kitchen, (n) bathroom within (e) kitchen space; (n) window replacement in-kind (rear of bldg); (n) fixture replacement in-kind @ bathroom #1; (n) elec, plumbing as required | $15,000 |