Treaty Construction
- Based in
- San Francisco
- On San Francisco permits
- Feb 2017 to Sep 2026
- Last 24 months
- 2 permits filed
13 permits since 2000: 8 completed, 2 in progress, 3 never finaled.
Of the 3 never-finaled permits, 2 are 3 to 5 years old, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
2 stairs permits: 1 completed, 1 never finaled. Typically 30 days from filing to permit and 1081 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 12, 2020 | Completed final sign-off Dec 2023 | 333 Post St | replace exterior stair contrasting stripe w/ a distinctive marking stripe per cbc 1011.5.4.1 where riser is less than 4" high. install signage notifying pedestrians of uneven bottom riserDetails
replace exterior stair contrasting stripe w/ a distinctive marking stripe per cbc 1011.5.4.1 where riser is less than 4" high. install signage notifying pedestrians of uneven bottom riser | $20,000 |
| Feb 24, 2017 | Never finaled issued Mar 2017, no final | 741 30th Av | revision to pa#201410088397, administrative only, revisions consisting of deleted stair work and (e) slope documenetationDetails
revision to pa#201410088397, administrative only, revisions consisting of deleted stair work and (e) slope documenetation |