Back to kitchen remodel contractors
Transworld Construction
- Based in
- San Francisco
- On San Francisco permits
- Apr 2000 to Aug 2023
- Last 24 months
- 0 permits filed
137 permits since 2000: 93 completed, 14 never finaled, 30 expired or cancelled.
Of the 14 never-finaled permits, 1 is 3 to 5 years old, 4 are 5 to 10 years old, 9 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
5 kitchen remodel permits: 4 completed, 1 expired or cancelled. Typically 12 days from filing to permit and 434 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 1, 2022 | Completed final sign-off Mar 2023 | 1174 Folsom St | unit b: revision to pa# 202111162490. revised kitchen/ preparation room equipment layout. relocation of proposed sink, ventless hood, & refrigeration equipment.Details
unit b: revision to pa# 202111162490. revised kitchen/ preparation room equipment layout. relocation of proposed sink, ventless hood, & refrigeration equipment. | |
| Apr 8, 2019 | Completed final sign-off Sep 2020 | 2509 Lake St | interior renovation and lightwell infill construction. interior partitions, windows in kind, plumbing,mech, elec. relocate kitchen, living room, dining room, powder rm to ground fl. 3 bdrms, den, 3 baths 2nd fl,Details
interior renovation and lightwell infill construction. interior partitions, windows in kind, plumbing,mech, elec. relocate kitchen, living room, dining room, powder rm to ground fl. 3 bdrms, den, 3 baths 2nd fl, | $250,000 |
| Feb 15, 2019 | Completed final sign-off Sep 2020 | 2509 Lake St | demo of interior non-struc parti, kitchen, baths, fixtures, rear deck hardscape & landscape in preparation for new construction. all (e) load bearing walls shall remain. limited demo of rated walls & ceilings, maintain ratings until new work is approved. no exterior work @ facade & interior stairs.Details
demo of interior non-struc parti, kitchen, baths, fixtures, rear deck hardscape & landscape in preparation for new construction. all (e) load bearing walls shall remain. limited demo of rated walls & ceilings, maintain ratings until new work is approved. no exterior work @ facade & interior stairs. | $5,000 |
| Oct 18, 2018 | Completed final sign-off Mar 2019 | 75 Ofarrell St | tenant improvement to remodel (e) restaurant to install new sink, kitchen sink, refrigerators, & new counters.Details
tenant improvement to remodel (e) restaurant to install new sink, kitchen sink, refrigerators, & new counters. | $10,000 |
| Dec 3, 2010 | Expired or cancelled cancelled Jun 2014 | 1178 Folsom St | change (e) office area to fast food restaurant use. construct new kitchen with counter & food pre equipment per plan at ground floor. modified (e) store front.Details
change (e) office area to fast food restaurant use. construct new kitchen with counter & food pre equipment per plan at ground floor. modified (e) store front. | $20,000 |