Back to bathroom remodel contractors
Transworld Construction
- Based in
- San Francisco
- On San Francisco permits
- Apr 2000 to Aug 2023
- Last 24 months
- 0 permits filed
137 permits since 2000: 93 completed, 14 never finaled, 30 expired or cancelled.
Of the 14 never-finaled permits, 1 is 3 to 5 years old, 4 are 5 to 10 years old, 9 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
5 bathroom remodel permits: 4 completed, 1 never finaled. Typically 12 days from filing to permit and 400 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 8, 2019 | Completed final sign-off Sep 2020 | 2509 Lake St | interior renovation and lightwell infill construction. interior partitions, windows in kind, plumbing,mech, elec. relocate kitchen, living room, dining room, powder rm to ground fl. 3 bdrms, den, 3 baths 2nd fl,Details
interior renovation and lightwell infill construction. interior partitions, windows in kind, plumbing,mech, elec. relocate kitchen, living room, dining room, powder rm to ground fl. 3 bdrms, den, 3 baths 2nd fl, | $250,000 |
| Feb 15, 2019 | Completed final sign-off Sep 2020 | 2509 Lake St | demo of interior non-struc parti, kitchen, baths, fixtures, rear deck hardscape & landscape in preparation for new construction. all (e) load bearing walls shall remain. limited demo of rated walls & ceilings, maintain ratings until new work is approved. no exterior work @ facade & interior stairs.Details
demo of interior non-struc parti, kitchen, baths, fixtures, rear deck hardscape & landscape in preparation for new construction. all (e) load bearing walls shall remain. limited demo of rated walls & ceilings, maintain ratings until new work is approved. no exterior work @ facade & interior stairs. | $5,000 |
| Jan 24, 2018 | Completed final sign-off Jul 2018 | 1447 37th Av | revision to 201708235672 connect (e) 2nd flr bathroom layout. relocate 2 bathrooms at 1st. replace water heater to an outdoor tankless w/hDetails
revision to 201708235672 connect (e) 2nd flr bathroom layout. relocate 2 bathrooms at 1st. replace water heater to an outdoor tankless w/h | $1,000 |
| Aug 23, 2017 | Completed final sign-off Jul 2018 | 1447 37th Av | add full bath on 2nd floor. add a media room, 2 bedrooms, 2 bathrooms and a storage room on 1st flDetails
add full bath on 2nd floor. add a media room, 2 bedrooms, 2 bathrooms and a storage room on 1st fl | $70,000 |
| Jun 29, 2010 | Never finaled issued Dec 2010, no final | 1111 Buchanan St | exterior paint, replace all windows/doors. (n) site access gate, exterior ramp/walkways, landscape. interior ada upgrades to (e) bathrooms, (n) accessible toilet rooms, interior renovation. see pa #2010-0910-0604 for related work on senior housing (1251 turk st.) that share same set of drwgs.Details
exterior paint, replace all windows/doors. (n) site access gate, exterior ramp/walkways, landscape. interior ada upgrades to (e) bathrooms, (n) accessible toilet rooms, interior renovation. see pa #2010-0910-0604 for related work on senior housing (1251 turk st.) that share same set of drwgs. | $1,941,237 |