Back to kitchen remodel contractors
Transbay Design Build
- Based in
- Berkeley
- On San Francisco permits
- Mar 2012 to May 2014
- Last 24 months
- 0 permits filed
5 permits since 2000: 4 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
1 kitchen remodel permit: 1 completed. Typically 229 days from filing to permit and 315 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 15, 2013 | Completed final sign-off May 2015 | 818 Alabama St | third story addition consisting of 3 bedrooms, 2 bath, and a new interior stair. renovated kitchen & bath at 2nd story. new electrical hvac and plumbing. comply of maher ord 155-13 not req.Details
third story addition consisting of 3 bedrooms, 2 bath, and a new interior stair. renovated kitchen & bath at 2nd story. new electrical hvac and plumbing. comply of maher ord 155-13 not req. | $275,000 |