Transbay Design Build
- Based in
- Berkeley
- On San Francisco permits
- Mar 2012 to May 2014
- Last 24 months
- 0 permits filed
5 permits since 2000: 4 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 7, 2014 | Completed final sign-off Oct 2014 | 73 Sequoia Wy | upstair bathroom remodel: new tile, new fixtures, new electric, some plmg. revision to app#201203206421Details
upstair bathroom remodel: new tile, new fixtures, new electric, some plmg. revision to app#201203206421 | $12,000 |
| Mar 3, 2014 | Expired or cancelled withdrawn Apr 2014 | 73 Sequoia Wy | revision to app#201203206421. delete the raised aspect of flooring and replace with aggragate base and 4 inch concrete over all floor except the garage space. install small window in laundry rear facing @ lower level.Details
revision to app#201203206421. delete the raised aspect of flooring and replace with aggragate base and 4 inch concrete over all floor except the garage space. install small window in laundry rear facing @ lower level. | |
| Dec 6, 2013 | Completed final sign-off Mar 2014 | 2 18th Av | repair extg rear deck in kind within extg extents approx. 50 % as possible. elements remaining. not visible from street.Details
repair extg rear deck in kind within extg extents approx. 50 % as possible. elements remaining. not visible from street. | $8,000 |
| Nov 15, 2013 | Completed final sign-off May 2015 | 818 Alabama St | third story addition consisting of 3 bedrooms, 2 bath, and a new interior stair. renovated kitchen & bath at 2nd story. new electrical hvac and plumbing. comply of maher ord 155-13 not req.Details
third story addition consisting of 3 bedrooms, 2 bath, and a new interior stair. renovated kitchen & bath at 2nd story. new electrical hvac and plumbing. comply of maher ord 155-13 not req. | $275,000 |
| Mar 20, 2012 | Completed final sign-off Sep 2014 | 73 Sequoia Wy | reml lower level&stairs down.divides space to6 rms: bedrm,study,laundry rm,hallway,bathrm,garage. +incidental closets&storage.remodel w/gypsum board&wood studs for walls.gypsum nailed to(e)flr joists for ceilings.replace support w/steel beam.leveled w/taped joists&sleepers attach to new plywood flr.Details
reml lower level&stairs down.divides space to6 rms: bedrm,study,laundry rm,hallway,bathrm,garage. +incidental closets&storage.remodel w/gypsum board&wood studs for walls.gypsum nailed to(e)flr joists for ceilings.replace support w/steel beam.leveled w/taped joists&sleepers attach to new plywood flr. | $80,000 |