Back to kitchen remodel contractors
Transbay Builders Inc.
- Based in
- Burlingame
- On San Francisco permits
- Aug 2005 to May 2022
- Last 24 months
- 0 permits filed
106 permits since 2000: 80 completed, 19 never finaled, 7 expired or cancelled.
Of the 19 never-finaled permits, 19 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
56 kitchen remodel permits: 42 completed, 10 never finaled, 4 expired or cancelled. Typically 1 days from filing to permit and 146 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 10, 2022 | Completed final sign-off Oct 2022 | 2166 20th Av | 1st floor: add 2 bedrooms, family and 2 full bath. 2nd floor: remodel kitchen, bathrooms and bedrooms. add 1 den infill lightwell. remove 2 small front windows at g/f. stucco to match. replace all front windows with in-kind (aluminum clad wood)Details
1st floor: add 2 bedrooms, family and 2 full bath. 2nd floor: remodel kitchen, bathrooms and bedrooms. add 1 den infill lightwell. remove 2 small front windows at g/f. stucco to match. replace all front windows with in-kind (aluminum clad wood) | $120,000 |
| Jan 13, 2020 | Completed final sign-off May 2021 | 1667 26th Av | 1st fl - add 2 bedrooms, 2 full bath & family; 2nd fl - remodel kitchen, bedrooms & bath. add office relocate interior staircase. infill lightwell. replace windows in-kind with aluminum-clad windows. 3 lites for left window.Details
1st fl - add 2 bedrooms, 2 full bath & family; 2nd fl - remodel kitchen, bedrooms & bath. add office relocate interior staircase. infill lightwell. replace windows in-kind with aluminum-clad windows. 3 lites for left window. | $60,000 |
| May 14, 2019 | Completed final sign-off May 2020 | 132 Woolsey St | comply w/ complaint 201876914. 1st flr -add 1 unit w/ kitchen, media, 2 bedrms, 1 full bath.Details
comply w/ complaint 201876914. 1st flr -add 1 unit w/ kitchen, media, 2 bedrms, 1 full bath. | $70,000 |
| Mar 5, 2019 | Completed final sign-off Sep 2019 | 2519 Pacheco St | 1st flr - add 2 bedrooms, 1 full bath, reconfigure interior stairs. 2nd flr - remodel kitchen and bathroom, add 1 full bath. repair deck at rear. less than 50%Details
1st flr - add 2 bedrooms, 1 full bath, reconfigure interior stairs. 2nd flr - remodel kitchen and bathroom, add 1 full bath. repair deck at rear. less than 50% | $80,000 |
| Nov 6, 2018 | Completed final sign-off Oct 2020 | 2666 21st St | 1st fl: add 1 bedroom, 1.5 baths, family, media, laundry and wetbar. 2nd fl: rmeodel kitchen & bath. add 1 full bath. reconfigure interior stairs. new windows & doors @ rear/side not visible from streetDetails
1st fl: add 1 bedroom, 1.5 baths, family, media, laundry and wetbar. 2nd fl: rmeodel kitchen & bath. add 1 full bath. reconfigure interior stairs. new windows & doors @ rear/side not visible from street | $100,000 |
| Jul 26, 2018 | Completed final sign-off May 2019 | 734 Banks St | remodel kitchen & 2 bathrooms.replace sheetrock. no wall removals or modfications. no structural. whole house sheetrock 5/8in type x with 5d nails at 4 in.Details
remodel kitchen & 2 bathrooms.replace sheetrock. no wall removals or modfications. no structural. whole house sheetrock 5/8in type x with 5d nails at 4 in. | $40,000 |
| Jul 28, 2017 | Completed final sign-off Jan 2018 | 280 San Marcos Av | remodel 3 bathrooms & kitchen inkind; no wall removal.Details
remodel 3 bathrooms & kitchen inkind; no wall removal. | $40,000 |
| Jan 19, 2017 | Completed final sign-off Sep 2017 | 107 Girard St | remodel kitchen & 2 baths on 2/f, add half bath on 2/f, add plywood panel on walls and holdowns, replace 4 windows and a patio door, not visable from street. no work on g/f, mep. upgrades as needed.Details
remodel kitchen & 2 baths on 2/f, add half bath on 2/f, add plywood panel on walls and holdowns, replace 4 windows and a patio door, not visable from street. no work on g/f, mep. upgrades as needed. | $79,500 |
| Dec 7, 2016 | Completed final sign-off Dec 2022 | 7415 Geary Bl | 1st flr: addition of dwelling unit per ordinance no. 162-16. add 2 bdrms, 1 bath, 1 kitchen, 1 living & 1 dining room.Details
1st flr: addition of dwelling unit per ordinance no. 162-16. add 2 bdrms, 1 bath, 1 kitchen, 1 living & 1 dining room. | $85,000 |
| Jul 28, 2016 | Completed final sign-off Oct 2016 | 1471 45th Av | add family room, bedroom, bathroom, half bath, wet bar & interior stair (572 sq.ft.) on 1/f, add 19'9' rear deck, relocate (e) kitchen & bathroom, add bathroom & (2) 2'x2' skylights on 2/f.Details
add family room, bedroom, bathroom, half bath, wet bar & interior stair (572 sq.ft.) on 1/f, add 19'9' rear deck, relocate (e) kitchen & bathroom, add bathroom & (2) 2'x2' skylights on 2/f. | $47,000 |
| Jul 12, 2016 | Never finaled issued Jul 2016, no final | 1471 45th Av | remodel kitchen and bathroom, change light, cabinet, tiles, no wall removed or added.Details
remodel kitchen and bathroom, change light, cabinet, tiles, no wall removed or added. | $20,000 |
| Jul 11, 2016 | Completed final sign-off Jun 2017 | 79 Sharon St | comply with complaint 201525221 and 201618881 1st fl add 2 bedrooms and 2 bath, new interior stairs to connect 2nd fl. 2nd fl: remodel bath and kitchen. rear building: remodel bathroom, repair front stairs, new wood windows at front, more than 25% e walls remainDetails
comply with complaint 201525221 and 201618881 1st fl add 2 bedrooms and 2 bath, new interior stairs to connect 2nd fl. 2nd fl: remodel bath and kitchen. rear building: remodel bathroom, repair front stairs, new wood windows at front, more than 25% e walls remain | $120,000 |
| Mar 7, 2016 | Completed final sign-off Sep 2016 | 3220 18th St | remodel two bathrooms & kitchen, replace drywall.Details
remodel two bathrooms & kitchen, replace drywall. | $45,000 |
| Feb 12, 2016 | Completed final sign-off May 2016 | 319 De Long St | renovation of single family dwelling. add family room, bedroom, bath. 472 sq ft on 1st fl. relocate e kitchen, remodel e bath, add new bath 2nd fl. repair dry rot exterior wall. remoe interior wall at living roomDetails
renovation of single family dwelling. add family room, bedroom, bath. 472 sq ft on 1st fl. relocate e kitchen, remodel e bath, add new bath 2nd fl. repair dry rot exterior wall. remoe interior wall at living room | $58,000 |
| Jan 20, 2016 | Never finaled issued Jan 2016, no final | 319 De Long St | remodel kitchen & bathroom same location no wall removedDetails
remodel kitchen & bathroom same location no wall removed | $25,000 |
| Mar 31, 2015 | Completed final sign-off Sep 2015 | 222 Andover St | abate to nov 201239741 and 201386804. revision to app#201412163791. replace extg footing on north and west side of bldg. lower conc. slab for 8'-0" ceiling ht on 1st floor. change location of bathroom, kitchen, and interior stair on 2nd floor.Details
abate to nov 201239741 and 201386804. revision to app#201412163791. replace extg footing on north and west side of bldg. lower conc. slab for 8'-0" ceiling ht on 1st floor. change location of bathroom, kitchen, and interior stair on 2nd floor. | $30,000 |
| Sep 18, 2014 | Completed final sign-off Jun 2015 | 1278 23rd Av | renovation of (e) s.f.d. add interior open stair on 2/f to connect (n) bathroom & family room with wet bar (456 sq ft) on 1/f. relocate (e) kitchen & half bath on 2/f. remodel (e) bathroom & add master bathroom on 3/f. replace all (e) wooden window with wood clad or alumi clad windows @ front.Details
renovation of (e) s.f.d. add interior open stair on 2/f to connect (n) bathroom & family room with wet bar (456 sq ft) on 1/f. relocate (e) kitchen & half bath on 2/f. remodel (e) bathroom & add master bathroom on 3/f. replace all (e) wooden window with wood clad or alumi clad windows @ front. | $80,000 |
| Jun 17, 2014 | Expired or cancelled expired Apr 2024 | 1081 Goettingen St | add family room, study, bathroom & foyer ( more or less 382 sq.ft.) on 1st flr of single family dwelling; remodel (e) kitchen and relocate (e) living room, bedroom & bathroom on 2nd flr, add rear stairDetails
add family room, study, bathroom & foyer ( more or less 382 sq.ft.) on 1st flr of single family dwelling; remodel (e) kitchen and relocate (e) living room, bedroom & bathroom on 2nd flr, add rear stair | $50,000 |
| May 9, 2014 | Completed final sign-off Jul 2014 | 1143 Goettingen St | revision 201403170898. add 1 master bath, remodel e bath and kitchen on 2nd flDetails
revision 201403170898. add 1 master bath, remodel e bath and kitchen on 2nd fl | $30,000 |
| Feb 11, 2014 | Completed final sign-off Jun 2014 | 2267 29th Av | infill lightwells 50 sq ft on so. & lightwell 7.5 sq ft @ the north. add family rm, bathrm, & 2 bedrooms approx 689 sq ft @ 1st flr. remodel (e) kitchen, relocate (e)g bath & upgrade int. stair & add one bath & one bedrm @ 2nd flr. install 3 skylights.add one woodclad windows @ front elevatioDetails
infill lightwells 50 sq ft on so. & lightwell 7.5 sq ft @ the north. add family rm, bathrm, & 2 bedrooms approx 689 sq ft @ 1st flr. remodel (e) kitchen, relocate (e)g bath & upgrade int. stair & add one bath & one bedrm @ 2nd flr. install 3 skylights.add one woodclad windows @ front elevatio | $80,000 |
| Feb 11, 2014 | Completed final sign-off May 2014 | 1560 Underwood Av | add family room, bedroom,bathroom and wet bar (plus or minus 448 sq ft on 1st floor). remodel extg kitchen, and bathroom on 2nd floor. add interior open stair connect 2nd floor to 1st floor. remodel extg bathroom and add one master bedroom. comply with 2013 sf green bldg. code table 4Details
add family room, bedroom,bathroom and wet bar (plus or minus 448 sq ft on 1st floor). remodel extg kitchen, and bathroom on 2nd floor. add interior open stair connect 2nd floor to 1st floor. remodel extg bathroom and add one master bedroom. comply with 2013 sf green bldg. code table 4 | $58,000 |
| Jan 31, 2014 | Completed final sign-off Jul 2014 | 268 Madison St | revision to pa#2007-1107-7585. spiral stairs have been deleted from plans. relocate kitchen to living room (open kitchen). existing kitchen to family room.Details
revision to pa#2007-1107-7585. spiral stairs have been deleted from plans. relocate kitchen to living room (open kitchen). existing kitchen to family room. | |
| Jan 31, 2014 | Completed final sign-off Jul 2014 | 262 Madison St | revision to pa#2007-1107-7585. spiral stairs have been deleted from plans. relocate kitchen to living room (open kitchen). existing kitchen to family room.Details
revision to pa#2007-1107-7585. spiral stairs have been deleted from plans. relocate kitchen to living room (open kitchen). existing kitchen to family room. | |
| Jan 27, 2014 | Never finaled issued Jan 2014, no final | 347 Campbell Av | add family room and excerscise room(+ or - 502 sq ft) on 1st floor of sfd. remodel extg kitchen and bathroom and convert half bath to full bathroom on 2nd floor.Details
add family room and excerscise room(+ or - 502 sq ft) on 1st floor of sfd. remodel extg kitchen and bathroom and convert half bath to full bathroom on 2nd floor. | $50,000 |
| Sep 11, 2013 | Completed final sign-off Sep 2015 | 1958 46th Av | remodel e kitchen and bath on 2nd fl. 1 bath on 2nd fl. 3 skylights, new beams for removal of interior wallsDetails
remodel e kitchen and bath on 2nd fl. 1 bath on 2nd fl. 3 skylights, new beams for removal of interior walls | $38,000 |
| Aug 15, 2013 | Never finaled issued Aug 2013, no final | 345 San Jose Av | remodel kitchen and bathrooms. new kitchen cabinets, tile, light, fan, new toilets, tub, tile, fan. new drywall. no structural workDetails
remodel kitchen and bathrooms. new kitchen cabinets, tile, light, fan, new toilets, tub, tile, fan. new drywall. no structural work | $40,000 |
| Jul 15, 2013 | Completed final sign-off Jan 2014 | 2661 21st St | remodel kitchen and two bathrooms. new drywall and installation. remodel kitchen, cabinets, countertops, plumbing, electrical. no structural work. tile, tub in bathrooms. kitchen 50% high efficacy lights/ bathrooms occupancy sensor.Details
remodel kitchen and two bathrooms. new drywall and installation. remodel kitchen, cabinets, countertops, plumbing, electrical. no structural work. tile, tub in bathrooms. kitchen 50% high efficacy lights/ bathrooms occupancy sensor. | $35,000 |
| Apr 15, 2013 | Completed final sign-off Aug 2013 | 1510 Revere Av | add family room, bedroom, bathroom & storage ( around 633 sq ft) on 1st floor, infill (around 60 sq ft) (e) lightwell on 2nd floor, remodel (e) kitchen & relocate (e) bathroom & add one half bath on 2nd floor, remodel (e) bathroom on 3rd floor.Details
add family room, bedroom, bathroom & storage ( around 633 sq ft) on 1st floor, infill (around 60 sq ft) (e) lightwell on 2nd floor, remodel (e) kitchen & relocate (e) bathroom & add one half bath on 2nd floor, remodel (e) bathroom on 3rd floor. | $58,000 |
| Apr 2, 2013 | Completed final sign-off Jun 2013 | 1114 Gilman Av | renovation of single famile dwelling - add family room & bathroom & bedroom (around 439 sf) on 1st floor, infill lightwell ( around 36 sf) on 2nd floor, remodel (e) kitchen & bathroom and add bathroom on 2nd floor.Details
renovation of single famile dwelling - add family room & bathroom & bedroom (around 439 sf) on 1st floor, infill lightwell ( around 36 sf) on 2nd floor, remodel (e) kitchen & bathroom and add bathroom on 2nd floor. | $60,000 |
| Dec 6, 2012 | Completed final sign-off May 2013 | 230 Brussels St | add family room and bathroom (plus or minus 279 sq ft) on 1/f. remodel extg kitchen and bathroom and install one beams & add half bath on 2/f. add bathroom and 2 skylights on 3/f. replace 3 windows at front and 5 windows at rear. provide insulation for entire bldg.Details
add family room and bathroom (plus or minus 279 sq ft) on 1/f. remodel extg kitchen and bathroom and install one beams & add half bath on 2/f. add bathroom and 2 skylights on 3/f. replace 3 windows at front and 5 windows at rear. provide insulation for entire bldg. | $45,000 |
| Oct 12, 2012 | Completed final sign-off Apr 2013 | 722 Ellsworth St | ground floor: add (2) bedrooms, (1) full bath room, family room, laundry & infill open space under (e) second floor habitable area. second floor: remodel kitchen, bathroom & add (1) full bathroomDetails
ground floor: add (2) bedrooms, (1) full bath room, family room, laundry & infill open space under (e) second floor habitable area. second floor: remodel kitchen, bathroom & add (1) full bathroom | $54,700 |
| Jul 12, 2012 | Never finaled issued Jul 2012, no final | 121 Cresta Vista Dr | install 4 beams for remodeling (e) kitchen of single family dwelling. kitchen & bathroom remodel was issued under pa# 2012-0605-1865Details
install 4 beams for remodeling (e) kitchen of single family dwelling. kitchen & bathroom remodel was issued under pa# 2012-0605-1865 | $9,000 |
| Jun 5, 2012 | Never finaled issued Jun 2012, no final | 121 Cresta Vista Dr | remodel 1 kitchen: replace cabinets, counter top, appliance, sink. remodel one bathroom: tub, tile, sink, lighting.Details
remodel 1 kitchen: replace cabinets, counter top, appliance, sink. remodel one bathroom: tub, tile, sink, lighting. | $25,000 |
| May 24, 2012 | Never finaled issued May 2012, no final | 1355 46th Av | remodel kitchen: replace cabinets, counter top, sink, light. remodel bathroom: replace cabinets, counter top, sink, light. replace windows, not visable from street, no structural work, no change on wall and opening.Details
remodel kitchen: replace cabinets, counter top, sink, light. remodel bathroom: replace cabinets, counter top, sink, light. replace windows, not visable from street, no structural work, no change on wall and opening. | $25,000 |
| May 21, 2012 | Completed final sign-off Aug 2012 | 2081 Thomas Av | remodel kitchen: replace cabinets, counter top, sink lighting. bathroom: replace tub, tiles, vanity, toilets. no structural work.Details
remodel kitchen: replace cabinets, counter top, sink lighting. bathroom: replace tub, tiles, vanity, toilets. no structural work. | $18,000 |
| May 21, 2012 | Completed final sign-off Aug 2012 | 26 Farallones St | remodel kitchen: replace cabinets, counter top, sink lighting. bathroom: replace tub, tiles, vanity, toilets. replace window. no structural work.Details
remodel kitchen: replace cabinets, counter top, sink lighting. bathroom: replace tub, tiles, vanity, toilets. replace window. no structural work. | $20,000 |
| Jan 5, 2012 | Never finaled issued Jan 2012, no final | 345 San Jose Av | remodel 2 kitchens and 2 bathrooms. one in each unit. new kitchen cabinets, sinks, fuacets, electrical and plumbing. no structural work.kitchens and baths light to comply with code cbc. new bath exhaust fans, vent to outside(150 k). kitchen hood, vent outside 3' away from property line.Details
remodel 2 kitchens and 2 bathrooms. one in each unit. new kitchen cabinets, sinks, fuacets, electrical and plumbing. no structural work.kitchens and baths light to comply with code cbc. new bath exhaust fans, vent to outside(150 k). kitchen hood, vent outside 3' away from property line. | $40,000 |
| Mar 25, 2011 | Completed final sign-off May 2011 | 2915 California St | #4 - remodel kitchen, replace cabinets, counter top, sink, light, electrical, plumbing.Details
#4 - remodel kitchen, replace cabinets, counter top, sink, light, electrical, plumbing. | $10,000 |
| Aug 16, 2010 | Completed final sign-off Nov 2010 | 525 41st Av | renovation of upper unit (on 2nd floor) of residence bldg, remodel (e) kitchen & bathroom, remodel (e) half bath to full bathroom. replace (e) 2-windows at the rear w/ (n) 2-4'x4' windows.Details
renovation of upper unit (on 2nd floor) of residence bldg, remodel (e) kitchen & bathroom, remodel (e) half bath to full bathroom. replace (e) 2-windows at the rear w/ (n) 2-4'x4' windows. | $38,000 |
| May 5, 2010 | Expired or cancelled expired Sep 2013 | 2067 41st Av | remodel kitchen & bathroom, retile, replace tub, vanities, kitchen cabinets, no change lights.Details
remodel kitchen & bathroom, retile, replace tub, vanities, kitchen cabinets, no change lights. | $9,239 |
| Apr 30, 2010 | Completed final sign-off Jul 2010 | 183 Caine Av | interior remodeling of a single family dwelling, add a family room, a bath, & a bedroom on 1st floor. refinish & replace plumbing fixture in bathroom on 2nd floor. refinish & replace kitchen cabinets in kitchen on 2nd floor.Details
interior remodeling of a single family dwelling, add a family room, a bath, & a bedroom on 1st floor. refinish & replace plumbing fixture in bathroom on 2nd floor. refinish & replace kitchen cabinets in kitchen on 2nd floor. | $45,000 |
| Oct 14, 2009 | Completed final sign-off Feb 2010 | 75 Rockaway Av | remodel 2 bathrooms & 1 kitchen, replace kitchen cabinet, countertop, tile, sink, appliance. replace baths - new vanties, toilets, tub, shower. no structural change.Details
remodel 2 bathrooms & 1 kitchen, replace kitchen cabinet, countertop, tile, sink, appliance. replace baths - new vanties, toilets, tub, shower. no structural change. | $16,000 |
| Sep 22, 2009 | Completed final sign-off Jan 2010 | 749 26th Av | replace kitchen cabinets and counter top tile and new gfi. replace tubs, vanities, counter tops, toilets and tilesDetails
replace kitchen cabinets and counter top tile and new gfi. replace tubs, vanities, counter tops, toilets and tiles | $19,000 |
| Jun 26, 2009 | Completed final sign-off Oct 2010 | 551 33rd Av | remodel kitchen & 2 bathrooms, repl cabinets, counter, tile and gfi, replace bath tub, vanities, counter tiles, gfi, fans, lights, no structural work, fluorescent lightDetails
remodel kitchen & 2 bathrooms, repl cabinets, counter, tile and gfi, replace bath tub, vanities, counter tiles, gfi, fans, lights, no structural work, fluorescent light | $15,000 |
| Jun 1, 2009 | Completed final sign-off Aug 2009 | 81 Pretor Wy | replace kitchen cabinets, counter top, sink, gfi, replace bathtub, tile, gfi, toilets, 7 windows front & back one sliding door back.Details
replace kitchen cabinets, counter top, sink, gfi, replace bathtub, tile, gfi, toilets, 7 windows front & back one sliding door back. | $13,000 |
| Feb 26, 2008 | Completed final sign-off Nov 2009 | 2570 32nd Av | two-story horizontal rear addition. (n) family room and 1 master bedroom at 1st fl. (n) master bedroom at 2nd floor. relocate (e) kitchen at 2nd floor.Details
two-story horizontal rear addition. (n) family room and 1 master bedroom at 1st fl. (n) master bedroom at 2nd floor. relocate (e) kitchen at 2nd floor. | $120,000 |
| Aug 30, 2007 | Completed final sign-off Nov 2007 | 2915 California St | replace kitchen cabinets, counter top, sink, tile. replace toilet tub tile, remodel kchn and bathDetails
replace kitchen cabinets, counter top, sink, tile. replace toilet tub tile, remodel kchn and bath | $25,000 |
| Aug 30, 2007 | Never finaled issued Aug 2007, no final | 1054 Divisadero St | replace kitchen cabinets and counter top, sinkDetails
replace kitchen cabinets and counter top, sink | $8,000 |
| Aug 23, 2007 | Expired or cancelled expired Nov 2008 | 955 Greenwich St | replace kitchen cabinet & sink. counter top & floor tile. 50% of wattage of kitchen lighting to be fluorescant. no structural.Details
replace kitchen cabinet & sink. counter top & floor tile. 50% of wattage of kitchen lighting to be fluorescant. no structural. | $10,000 |
| Jun 14, 2007 | Completed final sign-off Sep 2007 | 267 Dorland St | remodel (e) bathroom: tile, tub, toilet, fixtures. remodel (e) kitchen: tile, cabinets, counter top & fixtures. no window or door work on this permitDetails
remodel (e) bathroom: tile, tub, toilet, fixtures. remodel (e) kitchen: tile, cabinets, counter top & fixtures. no window or door work on this permit | $15,000 |
| Mar 20, 2007 | Completed final sign-off Jun 2007 | 635 Central Av | renovation of upper unit (3rd fl) of a 2 units residence, remodel e kitchen and bath, add 1 bath,bedroom,utility, replace e interior plaster w n 5/8" type x gypsum bd, add 2 2x2 skylites, upgrade 3 alum window to n vinyl windows in kind at side and rear (3 wood windos at liv/din rm)Details
renovation of upper unit (3rd fl) of a 2 units residence, remodel e kitchen and bath, add 1 bath,bedroom,utility, replace e interior plaster w n 5/8" type x gypsum bd, add 2 2x2 skylites, upgrade 3 alum window to n vinyl windows in kind at side and rear (3 wood windos at liv/din rm) | $70,000 |
| Feb 22, 2007 | Expired or cancelled expired Aug 2010 | 635 Central Av | remodel kitchen and bathroom. replace kitchen cabinet, countertop, sink, floor, electric, fixtures, tiles. repair rear stairs. replace tiles, tub, fixture, paint. comply with housing nov#200454793 & 200670552Details
remodel kitchen and bathroom. replace kitchen cabinet, countertop, sink, floor, electric, fixtures, tiles. repair rear stairs. replace tiles, tub, fixture, paint. comply with housing nov#200454793 & 200670552 | $20,000 |
| Aug 9, 2006 | Completed final sign-off Oct 2006 | 271 Dorland St | remodel bathroom & kitchen, replace kitchen cabinets nd counter tops, replace tubs, vnity, toilet, tile.Details
remodel bathroom & kitchen, replace kitchen cabinets nd counter tops, replace tubs, vnity, toilet, tile. | $12,000 |
| Jul 5, 2006 | Never finaled issued Jul 2006, no final | 1080 South Van Ness Av | remodel 1 kitchen. non structural. new sink, countertop, cabinets, lighting.Details
remodel 1 kitchen. non structural. new sink, countertop, cabinets, lighting. | $6,000 |
| Mar 8, 2006 | Completed final sign-off Jun 2006 | 519 07th Av | change kitchen cabinets, counter top. change bath vanity, top, tub, med, cabinets, bath & kitchen remodel no structural work.Details
change kitchen cabinets, counter top. change bath vanity, top, tub, med, cabinets, bath & kitchen remodel no structural work. | $13,500 |
| Aug 23, 2005 | Completed final sign-off Oct 2005 | 195 Melrose Av | upper floor: relcated - kitchen fixture (sink & oven) within each kitchenDetails
upper floor: relcated - kitchen fixture (sink & oven) within each kitchen | $15,000 |