Back to kitchen remodel contractors
Transatlantic Construction Company
- Based in
- San Francisco
- On San Francisco permits
- Jul 2004 to Dec 2024
- Last 24 months
- 1 permit filed
59 permits since 2000: 48 completed, 9 never finaled, 2 expired or cancelled.
Of the 9 never-finaled permits, 3 are 3 to 5 years old, 4 are 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
6 kitchen remodel permits: 5 completed, 1 never finaled. Typically 0 days from filing to permit and 76 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 15, 2020 | Completed final sign-off Feb 2020 | 362 28th Av | revision to 201707051026 to comply with correction notice. install premanufactured outdoor kitchens and fie pits at 4th fl roof deck and rear yardDetails
revision to 201707051026 to comply with correction notice. install premanufactured outdoor kitchens and fie pits at 4th fl roof deck and rear yard | $15,000 |
| Jan 4, 2018 | Completed final sign-off Mar 2018 | 350 San Jose Av | replace damaged cabinets & fixtures in kitchen & bathroom of dwelling units. no wall modification - no structural work. work to be done in units 1 & 2 (lower level) only.Details
replace damaged cabinets & fixtures in kitchen & bathroom of dwelling units. no wall modification - no structural work. work to be done in units 1 & 2 (lower level) only. | $2,000 |
| Jan 23, 2017 | Never finaled issued Mar 2017, no final | 680 Illinois St | proposed commercial kitchen hoodDetails
proposed commercial kitchen hood | $15,000 |
| Dec 4, 2015 | Completed final sign-off Dec 2016 | 144 Central Av | remodel of one kitchen and two baths. no change in wall and opeing layout. kitchen lighting min. 50% wattage as high efficacy; bathroom lighting either all high efficacy or controlled by manual on sensor and a high efficacy main light.Details
remodel of one kitchen and two baths. no change in wall and opeing layout. kitchen lighting min. 50% wattage as high efficacy; bathroom lighting either all high efficacy or controlled by manual on sensor and a high efficacy main light. | $40,000 |
| May 14, 2014 | Completed final sign-off Jun 2015 | 829 Rhode Island St | remodel of ktichen & bath on 2nd floor near dining room & family room. kitchen lighting - min 50% total wattage = high efficacy. bathroom lighting - high efficacy unless ontrolled by manual on sensors.Details
remodel of ktichen & bath on 2nd floor near dining room & family room. kitchen lighting - min 50% total wattage = high efficacy. bathroom lighting - high efficacy unless ontrolled by manual on sensors. | $40,000 |
| Nov 1, 2010 | Completed final sign-off Dec 2010 | 541 29th St | remove & discard wet drywall and insulation from walls & ceiling in kitchen, living room, stairway & lower level, install 5/8" type 'x' sheetrock & insulation in walls & ceiling sand and finish hardwood floors in kitchen, living room & stairway.Details
remove & discard wet drywall and insulation from walls & ceiling in kitchen, living room, stairway & lower level, install 5/8" type 'x' sheetrock & insulation in walls & ceiling sand and finish hardwood floors in kitchen, living room & stairway. | $35,000 |