Back to bathroom remodel contractors
Transatlantic Construction Company
- Based in
- San Francisco
- On San Francisco permits
- Jul 2004 to Dec 2024
- Last 24 months
- 1 permit filed
59 permits since 2000: 48 completed, 9 never finaled, 2 expired or cancelled.
Of the 9 never-finaled permits, 3 are 3 to 5 years old, 4 are 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
5 bathroom remodel permits: 3 completed, 2 never finaled. Typically 0 days from filing to permit and 384 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 10, 2018 | Never finaled issued Jun 2018, no final | 680 Illinois St | revision to 201612296253. scope includes add 1 storage 1 freezer addition ot e commercial space. addition of 5 class 1 bicycle parking space to e garage. change bathroom and seating layout. change door/window locatoin at street front maher not reqDetails
revision to 201612296253. scope includes add 1 storage 1 freezer addition ot e commercial space. addition of 5 class 1 bicycle parking space to e garage. change bathroom and seating layout. change door/window locatoin at street front maher not req | $25,000 |
| Jan 4, 2018 | Completed final sign-off Mar 2018 | 350 San Jose Av | replace damaged cabinets & fixtures in kitchen & bathroom of dwelling units. no wall modification - no structural work. work to be done in units 1 & 2 (lower level) only.Details
replace damaged cabinets & fixtures in kitchen & bathroom of dwelling units. no wall modification - no structural work. work to be done in units 1 & 2 (lower level) only. | $2,000 |
| Dec 29, 2016 | Never finaled issued Jan 2017, no final | 680 Illinois St | revision to approved bpa 201601046290 changing bathroom and seating layouts; maher n/aDetails
revision to approved bpa 201601046290 changing bathroom and seating layouts; maher n/a | |
| Dec 4, 2015 | Completed final sign-off Dec 2016 | 144 Central Av | remodel of one kitchen and two baths. no change in wall and opeing layout. kitchen lighting min. 50% wattage as high efficacy; bathroom lighting either all high efficacy or controlled by manual on sensor and a high efficacy main light.Details
remodel of one kitchen and two baths. no change in wall and opeing layout. kitchen lighting min. 50% wattage as high efficacy; bathroom lighting either all high efficacy or controlled by manual on sensor and a high efficacy main light. | $40,000 |
| May 14, 2014 | Completed final sign-off Jun 2015 | 829 Rhode Island St | remodel of ktichen & bath on 2nd floor near dining room & family room. kitchen lighting - min 50% total wattage = high efficacy. bathroom lighting - high efficacy unless ontrolled by manual on sensors.Details
remodel of ktichen & bath on 2nd floor near dining room & family room. kitchen lighting - min 50% total wattage = high efficacy. bathroom lighting - high efficacy unless ontrolled by manual on sensors. | $40,000 |