Back to kitchen remodel contractors
Towey Construction Inc.
- Based in
- Mill Valley
- On San Francisco permits
- Aug 2009 to Jun 2026
- Last 24 months
- 1 permit filed
79 permits since 2000: 41 completed, 3 in progress, 23 never finaled, 12 expired or cancelled.
Of the 23 never-finaled permits, 3 are 5 to 10 years old, 20 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
12 kitchen remodel permits: 8 completed, 1 in progress, 2 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 292 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 10, 2023 | In progress issued Oct 2023 | 3275 Harrison St | upper level kitchen & bathroom remodel and replace 4 windows, & 12 doors in exsiting openings. repalce insulation if needed, install new engineered floor sheetrock & paint, top flr, replace 4 skylights, install electric fireplace in existing wood burning fireplace, install new wiring as needed.Details
upper level kitchen & bathroom remodel and replace 4 windows, & 12 doors in exsiting openings. repalce insulation if needed, install new engineered floor sheetrock & paint, top flr, replace 4 skylights, install electric fireplace in existing wood burning fireplace, install new wiring as needed. | $165,000 |
| Dec 22, 2017 | Completed final sign-off Jan 2019 | 167 08th Av | 1st fl additin (128 sq ft) remodel of 1st, 2nd, 3rd fl to include mudroom, living rm, kitchen, dining rm, family rm, 4 bedrooms, 1 office, 3 full baths, 1 1/2 baths, closet space, laundry closet, garageDetails
1st fl additin (128 sq ft) remodel of 1st, 2nd, 3rd fl to include mudroom, living rm, kitchen, dining rm, family rm, 4 bedrooms, 1 office, 3 full baths, 1 1/2 baths, closet space, laundry closet, garage | $180,000 |
| Sep 29, 2016 | Completed final sign-off Feb 2018 | 2315 Bryant St | remodel lower tic unit only. remodel/reconfigure kitchen, 2 baths and bedroom. install new rear yard access door and landingDetails
remodel lower tic unit only. remodel/reconfigure kitchen, 2 baths and bedroom. install new rear yard access door and landing | $125,000 |
| May 28, 2015 | Completed final sign-off Jun 2016 | 158 Bocana St | add a 33 sf extension to the kitchen remodel. finish floors install washing machine under stairs, install a new window & door at the back of the house, build step on top of (e) deck. add insulation in crawl space. install new lights.Details
add a 33 sf extension to the kitchen remodel. finish floors install washing machine under stairs, install a new window & door at the back of the house, build step on top of (e) deck. add insulation in crawl space. install new lights. | $64,000 |
| Nov 12, 2014 | Never finaled issued Nov 2014, no final | 2257 Washington St | kitchen remodel. install cabinets, run wiring & plumbing for ice maker, install granite counter & remove light in ceiling.Details
kitchen remodel. install cabinets, run wiring & plumbing for ice maker, install granite counter & remove light in ceiling. | $14,000 |
| Oct 7, 2013 | Completed final sign-off Jul 2014 | 2722 Fulton St | kitchen & 2 bathrs remodel install dry wll in 7 room ceilings, install lights in master bedroom & 2 in dining,Details
kitchen & 2 bathrs remodel install dry wll in 7 room ceilings, install lights in master bedroom & 2 in dining, | $32,000 |
| May 29, 2013 | Completed final sign-off May 2014 | 326 Lawton St | renovtion at 2nd level only at existing kitchen to include replacement of cabinetry, floor finishes, appliances, lighting, windows (reduced sizes), door at existing openings. windows and doors to be like kind and rear yard facingDetails
renovtion at 2nd level only at existing kitchen to include replacement of cabinetry, floor finishes, appliances, lighting, windows (reduced sizes), door at existing openings. windows and doors to be like kind and rear yard facing | $50,000 |
| Dec 5, 2012 | Completed final sign-off Feb 2013 | 1250 Kirkham St | remodel kitchen & paint interior of apartment. counter top, cabinets, sink & appliances in kitchen.Details
remodel kitchen & paint interior of apartment. counter top, cabinets, sink & appliances in kitchen. | $17,000 |
| Aug 17, 2012 | Never finaled issued Aug 2012, no final | 1539 Haight St | remodel one kitchen, reface 5 dodors. install lino. in kitchen and revent water heaters.Details
remodel one kitchen, reface 5 dodors. install lino. in kitchen and revent water heaters. | $24,000 |
| Dec 20, 2011 | Completed final sign-off Oct 2012 | 2775 Union St | kitchen remodel at 1st floor: cabinets, applicances, lights, plumbing, no wal relocation. install hardwood floor at all levels. replace existing light trims, switches & outlets in entire house, install base board on all walls. a min of 50% of the total rated wattage in kitchen shall be high efficacyDetails
kitchen remodel at 1st floor: cabinets, applicances, lights, plumbing, no wal relocation. install hardwood floor at all levels. replace existing light trims, switches & outlets in entire house, install base board on all walls. a min of 50% of the total rated wattage in kitchen shall be high efficacy | $72,000 |
| Dec 16, 2010 | Completed final sign-off Mar 2011 | 1535 Haight St | install 2 new windows install new sub panel, 1 kitchen, 1 bath remodel and gfi's, new toilet, vanity new lino and paint, windows not visible from street, min u factor .40Details
install 2 new windows install new sub panel, 1 kitchen, 1 bath remodel and gfi's, new toilet, vanity new lino and paint, windows not visible from street, min u factor .40 | $18,000 |
| Dec 10, 2010 | Expired or cancelled expired Apr 2017 | 16 West Clay St | tie backsplash in kitchen, install new granite fireplace surround on 3 fire (total), bathroom remodel.Details
tie backsplash in kitchen, install new granite fireplace surround on 3 fire (total), bathroom remodel. | $20,000 |