Towey Construction Inc.
- Based in
- Mill Valley
- On San Francisco permits
- Aug 2009 to Jun 2026
- Last 24 months
- 1 permit filed
79 permits since 2000: 41 completed, 3 in progress, 23 never finaled, 12 expired or cancelled.
Of the 23 never-finaled permits, 3 are 5 to 10 years old, 20 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Deck permits
8 deck permits: 5 completed, 3 never finaled. Typically 28 days from filing to permit and 182 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 9, 2018 | Completed final sign-off Jan 2019 | 167 08th Av | new exterior stairs to existing deck.Details
new exterior stairs to existing deck. | $12,000 |
| Mar 8, 2018 | Completed final sign-off Oct 2018 | 3959 Washington St | revision to previously approved 201701268026, scope includes reconfiguration of rear exterior stairs and deck, addition of fireplace on 1st fl, reconfiguration of interior walls, reconfiguration of skylights on roofDetails
revision to previously approved 201701268026, scope includes reconfiguration of rear exterior stairs and deck, addition of fireplace on 1st fl, reconfiguration of interior walls, reconfiguration of skylights on roof | |
| May 28, 2015 | Completed final sign-off Jun 2016 | 158 Bocana St | add a 33 sf extension to the kitchen remodel. finish floors install washing machine under stairs, install a new window & door at the back of the house, build step on top of (e) deck. add insulation in crawl space. install new lights.Details
add a 33 sf extension to the kitchen remodel. finish floors install washing machine under stairs, install a new window & door at the back of the house, build step on top of (e) deck. add insulation in crawl space. install new lights. | $64,000 |
| Mar 31, 2015 | Completed final sign-off Jun 2016 | 1313 06th Av | renovation of (e) attic space in an (e) 2-unit building (n)dormers,remodel of (e) 2nd flr bedroom (n) deck); addition of (n) bath, family rm&bedrm in renovated attic,addition of (n)interior stair; maher n/a. no bldg expansion other than dormers.Details
renovation of (e) attic space in an (e) 2-unit building (n)dormers,remodel of (e) 2nd flr bedroom (n) deck); addition of (n) bath, family rm&bedrm in renovated attic,addition of (n)interior stair; maher n/a. no bldg expansion other than dormers. | $77,000 |
| Jul 23, 2014 | Never finaled issued Aug 2014, no final | 839 Leavenworth St | build new roof deck. new deck joists 4x4 and psl. roof members and ipe deck tilesDetails
build new roof deck. new deck joists 4x4 and psl. roof members and ipe deck tiles | $14,000 |
| Nov 12, 2013 | Never finaled issued Nov 2013, no final | 3508 26th St | repair dryrot to back deck @120 sq ft.Details
repair dryrot to back deck @120 sq ft. | $6,000 |
| Oct 21, 2013 | Never finaled issued Dec 2013, no final | 72 Gough St | replace extg deteriorated sidewalk with new concrete over metal decking where sidewalk on rose street only. permit app#201310189729 72 gough street has been filed to take care of the complaint #201384581 and 201384900.Details
replace extg deteriorated sidewalk with new concrete over metal decking where sidewalk on rose street only. permit app#201310189729 72 gough street has been filed to take care of the complaint #201384581 and 201384900. | $20,000 |
| Apr 30, 2012 | Completed final sign-off May 2012 | 430 Hill St | replace flashing & shingles on top deck (windows & rooms)Details
replace flashing & shingles on top deck (windows & rooms) | $1,500 |