Back to kitchen remodel contractors
Towers Construction
- Based in
- Woodside
- On San Francisco permits
- Jul 2001 to Jun 2025
- Last 24 months
- 1 permit filed
59 permits since 2000: 46 completed, 6 never finaled, 7 expired or cancelled.
Of the 6 never-finaled permits, 6 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
10 kitchen remodel permits: 6 completed, 2 never finaled, 2 expired or cancelled. Typically 0 days from filing to permit and 434 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 14, 2023 | Expired or cancelled expired Jan 2026 | 1248 Stanyan St | revision to pa# 202306099684, structural design and alteration to support proposed kitchen and bathroom remodel.Details
revision to pa# 202306099684, structural design and alteration to support proposed kitchen and bathroom remodel. | |
| Jun 9, 2023 | Expired or cancelled expired Jan 2026 | 1248 Stanyan St | remodel existing kitchen, laundry room area, and convert full bathroom at 2nd floor into a powder room.Details
remodel existing kitchen, laundry room area, and convert full bathroom at 2nd floor into a powder room. | $45,000 |
| Jul 19, 2022 | Completed final sign-off Oct 2022 | 3349 Jackson St | replace tile & plmbing fixtures at hall & master bathroom & install updated lighting at lower unit 3349. new hall lighting & replace kitchen counters only for unit 3351. no modification to layout / space.Details
replace tile & plmbing fixtures at hall & master bathroom & install updated lighting at lower unit 3349. new hall lighting & replace kitchen counters only for unit 3351. no modification to layout / space. | $100,000 |
| Jan 21, 2022 | Completed final sign-off Nov 2022 | 787 Pacheco St | in kind kitchen renovation old cabinetry will be removed and replaced. new countertop will be installed. existing pantry and dishwasher will be retained. plumbing and electrical will be updated.Details
in kind kitchen renovation old cabinetry will be removed and replaced. new countertop will be installed. existing pantry and dishwasher will be retained. plumbing and electrical will be updated. | $51,000 |
| Feb 9, 2021 | Completed final sign-off Mar 2025 | 99 Bosworth St | add unit per density. bring ceiling height (level 1) and 2 stairways to compliance. remodel kitchen (level 1) and all bathrooms. reconfigure interior walls. roof deck (level 3). replace all windows, add new windows, and a skylight. add 3 new dormers. remove existing chimney. mep and structural workDetails
add unit per density. bring ceiling height (level 1) and 2 stairways to compliance. remodel kitchen (level 1) and all bathrooms. reconfigure interior walls. roof deck (level 3). replace all windows, add new windows, and a skylight. add 3 new dormers. remove existing chimney. mep and structural work | $272,000 |
| Sep 1, 2015 | Never finaled issued Sep 2015, no final | 137 Noe St | interior remodel on residential floors: new kitchen, redo 1 bath, 1 new bath, add plugs, paint. no structural work. replace stair to comply with code requirements.Details
interior remodel on residential floors: new kitchen, redo 1 bath, 1 new bath, add plugs, paint. no structural work. replace stair to comply with code requirements. | $35,000 |
| Sep 1, 2015 | Completed final sign-off Mar 2017 | 139 Noe St | ground floor: ti - formerly coffee shop to be converted to architechture office. scope include reno of (e) bath; install (n) kitchenette; repair finishes, front entry stoop replace with (n) ramp under 20% rule for projects under valuation threshold. no structural work.Details
ground floor: ti - formerly coffee shop to be converted to architechture office. scope include reno of (e) bath; install (n) kitchenette; repair finishes, front entry stoop replace with (n) ramp under 20% rule for projects under valuation threshold. no structural work. | $14,500 |
| Nov 6, 2012 | Completed final sign-off Aug 2015 | 1725 Haight St | approved cup# 2012.0145c, conversion of movie theatre to event space / retail. expansion of adjacent restaurant. upgraded commercial kitchen, new store front. sprinkler & mechanical to be submitted under separate permitDetails
approved cup# 2012.0145c, conversion of movie theatre to event space / retail. expansion of adjacent restaurant. upgraded commercial kitchen, new store front. sprinkler & mechanical to be submitted under separate permit | $300,000 |
| Feb 27, 2012 | Never finaled issued Feb 2012, no final | 2251 Jackson St | cosmetic renovation of kitchen & bathroom @ 2nd floor unit. new cabinets, stove, sink, refrigerator, new counter top, new toilet, tub, shower, tile sink. cosmetic renovation of kitchen & bathroom at 3rd floor unit. same as above. no structural work.Details
cosmetic renovation of kitchen & bathroom @ 2nd floor unit. new cabinets, stove, sink, refrigerator, new counter top, new toilet, tub, shower, tile sink. cosmetic renovation of kitchen & bathroom at 3rd floor unit. same as above. no structural work. | $39,500 |
| Aug 18, 2003 | Completed final sign-off Nov 2003 | 36 Sotelo Av | replace extng kitchen cabinet minor electrical & plumbing,replace extng rotted bay window in kitchenDetails
replace extng kitchen cabinet minor electrical & plumbing,replace extng rotted bay window in kitchen | $25,000 |