Back to bathroom remodel contractors
Towers Construction
- Based in
- Woodside
- On San Francisco permits
- Jul 2001 to Jun 2025
- Last 24 months
- 1 permit filed
59 permits since 2000: 46 completed, 6 never finaled, 7 expired or cancelled.
Of the 6 never-finaled permits, 6 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
12 bathroom remodel permits: 7 completed, 2 never finaled, 3 expired or cancelled. Typically 0 days from filing to permit and 454 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 20, 2023 | Completed final sign-off Mar 2025 | 99 Bosworth St | revision to 202102094296, 202304125594: interior wall reconfiguration level 3. removal of bedroom walls and oors, removal of low wall at master bathroom, reconfiguration of closets, new wall and door at master suite, structural work. removal of skylight at roof above master bdroom.Details
revision to 202102094296, 202304125594: interior wall reconfiguration level 3. removal of bedroom walls and oors, removal of low wall at master bathroom, reconfiguration of closets, new wall and door at master suite, structural work. removal of skylight at roof above master bdroom. | $8,000 |
| Jul 14, 2023 | Expired or cancelled expired Jan 2026 | 1248 Stanyan St | revision to pa# 202306099684, structural design and alteration to support proposed kitchen and bathroom remodel.Details
revision to pa# 202306099684, structural design and alteration to support proposed kitchen and bathroom remodel. | |
| Jun 9, 2023 | Expired or cancelled expired Jan 2026 | 1248 Stanyan St | remodel existing kitchen, laundry room area, and convert full bathroom at 2nd floor into a powder room.Details
remodel existing kitchen, laundry room area, and convert full bathroom at 2nd floor into a powder room. | $45,000 |
| Jul 19, 2022 | Completed final sign-off Oct 2022 | 3349 Jackson St | replace tile & plmbing fixtures at hall & master bathroom & install updated lighting at lower unit 3349. new hall lighting & replace kitchen counters only for unit 3351. no modification to layout / space.Details
replace tile & plmbing fixtures at hall & master bathroom & install updated lighting at lower unit 3349. new hall lighting & replace kitchen counters only for unit 3351. no modification to layout / space. | $100,000 |
| Mar 11, 2022 | Completed final sign-off Dec 2023 | 1248 Stanyan St | 3/f: remodel (e) 3/f bathroom. add new full bathroom on 3/f replace (e) window, add 2 new sky lights. no structural work proposed.Details
3/f: remodel (e) 3/f bathroom. add new full bathroom on 3/f replace (e) window, add 2 new sky lights. no structural work proposed. | $30,000 |
| Feb 9, 2021 | Completed final sign-off Mar 2025 | 99 Bosworth St | add unit per density. bring ceiling height (level 1) and 2 stairways to compliance. remodel kitchen (level 1) and all bathrooms. reconfigure interior walls. roof deck (level 3). replace all windows, add new windows, and a skylight. add 3 new dormers. remove existing chimney. mep and structural workDetails
add unit per density. bring ceiling height (level 1) and 2 stairways to compliance. remodel kitchen (level 1) and all bathrooms. reconfigure interior walls. roof deck (level 3). replace all windows, add new windows, and a skylight. add 3 new dormers. remove existing chimney. mep and structural work | $272,000 |
| Dec 10, 2020 | Completed final sign-off Mar 2021 | 787 Pacheco St | remodel 1 bathroom - replace floor tiles, shower, tub surround, tub, toilet, new lighting, exhaust fan, new vanity.Details
remodel 1 bathroom - replace floor tiles, shower, tub surround, tub, toilet, new lighting, exhaust fan, new vanity. | $41,000 |
| Sep 1, 2015 | Never finaled issued Sep 2015, no final | 137 Noe St | interior remodel on residential floors: new kitchen, redo 1 bath, 1 new bath, add plugs, paint. no structural work. replace stair to comply with code requirements.Details
interior remodel on residential floors: new kitchen, redo 1 bath, 1 new bath, add plugs, paint. no structural work. replace stair to comply with code requirements. | $35,000 |
| Sep 1, 2015 | Completed final sign-off Mar 2017 | 139 Noe St | ground floor: ti - formerly coffee shop to be converted to architechture office. scope include reno of (e) bath; install (n) kitchenette; repair finishes, front entry stoop replace with (n) ramp under 20% rule for projects under valuation threshold. no structural work.Details
ground floor: ti - formerly coffee shop to be converted to architechture office. scope include reno of (e) bath; install (n) kitchenette; repair finishes, front entry stoop replace with (n) ramp under 20% rule for projects under valuation threshold. no structural work. | $14,500 |
| Feb 27, 2012 | Never finaled issued Feb 2012, no final | 2251 Jackson St | cosmetic renovation of kitchen & bathroom @ 2nd floor unit. new cabinets, stove, sink, refrigerator, new counter top, new toilet, tub, shower, tile sink. cosmetic renovation of kitchen & bathroom at 3rd floor unit. same as above. no structural work.Details
cosmetic renovation of kitchen & bathroom @ 2nd floor unit. new cabinets, stove, sink, refrigerator, new counter top, new toilet, tub, shower, tile sink. cosmetic renovation of kitchen & bathroom at 3rd floor unit. same as above. no structural work. | $39,500 |
| Jan 19, 2010 | Completed final sign-off Jun 2010 | 1248 Stanyan St | remove (e) plaster walls and ceilings at (e) bath and bedroom. add insulation, rework electrical, plumbing. add new plumbing fixtures, drywall and paints. remove plaster ceiling at 2 other rooms for installation of hydronic system (under separate permit). all interior work.Details
remove (e) plaster walls and ceilings at (e) bath and bedroom. add insulation, rework electrical, plumbing. add new plumbing fixtures, drywall and paints. remove plaster ceiling at 2 other rooms for installation of hydronic system (under separate permit). all interior work. | $50,000 |
| Mar 22, 2007 | Expired or cancelled expired Feb 2008 | 54 Lakewood Av | revision to pa# 200504270953-downsizing scope of the project. no exterior addition @ the left side of house. no expansion of the front porch. 1st fl: remodel (e) bath, add 2nd bath, reconfigure stairway to family rm. ground fl:add 2 bedrms, family rm, full bath, laundry, utility closets,add storage.Details
revision to pa# 200504270953-downsizing scope of the project. no exterior addition @ the left side of house. no expansion of the front porch. 1st fl: remodel (e) bath, add 2nd bath, reconfigure stairway to family rm. ground fl:add 2 bedrms, family rm, full bath, laundry, utility closets,add storage. |