Back to kitchen remodel contractors
Tony Ng Plumbing Co
- Based in
- San Francisco
- On San Francisco permits
- Feb 2000 to Jul 2022
- Last 24 months
- 0 permits filed
149 permits since 2000: 100 completed, 16 never finaled, 33 expired or cancelled.
Of the 16 never-finaled permits, 4 are 5 to 10 years old, 12 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
2 kitchen remodel permits: 2 completed. Typically 292 days from filing to permit and 984 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 18, 2016 | Completed final sign-off Jul 2019 | 958 Ellsworth St | rad. bldg 4, replace exterior & interior door & hardward, window, roofing, downspont, water heater, furnances, remodel kitchen & bathrm, flooring, light fixture, refinishing hardwood floor, enlargeing concrete stoop, new sprinkler system.Details
rad. bldg 4, replace exterior & interior door & hardward, window, roofing, downspont, water heater, furnances, remodel kitchen & bathrm, flooring, light fixture, refinishing hardwood floor, enlargeing concrete stoop, new sprinkler system. | $1,982,000 |
| Sep 2, 2015 | Completed final sign-off Apr 2019 | 1750 Mcallister St | rad project. 830 sq ft ground floor expansion at rear, exterior paint, (n) kitchen, bath, and finishes in residential units, repaving of parking lot. sprinkler, alarm, elevator deferred.Details
rad project. 830 sq ft ground floor expansion at rear, exterior paint, (n) kitchen, bath, and finishes in residential units, repaving of parking lot. sprinkler, alarm, elevator deferred. | $12,000,000 |