Back to kitchen remodel contractors
Tommy K Woo
- Based in
- Fremont
- On San Francisco permits
- Jul 2001 to Dec 2023
- Last 24 months
- 0 permits filed
60 permits since 2000: 34 completed, 15 never finaled, 11 expired or cancelled.
Of the 15 never-finaled permits, 1 is 3 to 5 years old, 8 are 5 to 10 years old, 6 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
11 kitchen remodel permits: 7 completed, 3 never finaled, 1 expired or cancelled. Typically 5 days from filing to permit and 166 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 15, 2023 | Completed final sign-off Sep 2023 | 880 Bush St | unit 103: to replace kitchen sink, stove, toilet, electrical plugDetails
unit 103: to replace kitchen sink, stove, toilet, electrical plug | $8,500 |
| May 8, 2019 | Completed final sign-off Oct 2019 | 525 Excelsior Av | convert (e) storage to 1 new family room, entertainment room & powder room on 1st fl; relcoate (e) kitchen & staircase; infill lightwell and add master bathroom and add master bedroom on 2nd floorDetails
convert (e) storage to 1 new family room, entertainment room & powder room on 1st fl; relcoate (e) kitchen & staircase; infill lightwell and add master bathroom and add master bedroom on 2nd floor | $35,000 |
| Feb 7, 2019 | Never finaled issued Feb 2019, no final | 525 Excelsior Av | replace dishwasher in kitchen and counter tops.Details
replace dishwasher in kitchen and counter tops. | $2,500 |
| Aug 31, 2017 | Completed final sign-off Feb 2018 | 2311 Clement St | restaurant:remove 8' galvanized hood, add new 11' stainless steel kitchen hood. new gas line for equipment. replace electrical plugs. tiling & painting. ansul/ul300 under separate permit.Details
restaurant:remove 8' galvanized hood, add new 11' stainless steel kitchen hood. new gas line for equipment. replace electrical plugs. tiling & painting. ansul/ul300 under separate permit. | $30,000 |
| Aug 29, 2016 | Completed final sign-off Oct 2020 | 274 Victoria St | comply with nov 201625382 permit for furnace/water heater. legalize(e)unit (unit b) on grd floor with 1 bedroom, 1 full bath, kitchen & living room per plan. add deck at rear of building for unit a access to rear yard (open common space) per plan. unit legalization ord 43-14.Details
comply with nov 201625382 permit for furnace/water heater. legalize(e)unit (unit b) on grd floor with 1 bedroom, 1 full bath, kitchen & living room per plan. add deck at rear of building for unit a access to rear yard (open common space) per plan. unit legalization ord 43-14. | $21,000 |
| Mar 30, 2015 | Never finaled issued Apr 2015, no final | 646 Irving St | ti for new restaurant. new restroom, kitchen, hood, plumbing line and electricalDetails
ti for new restaurant. new restroom, kitchen, hood, plumbing line and electrical | $50,000 |
| Jan 26, 2015 | Completed final sign-off Oct 2015 | 1950 Page St | install cooking equipment and a 10' hood in the kitchen, ansul system on separate permitDetails
install cooking equipment and a 10' hood in the kitchen, ansul system on separate permit | $12,000 |
| Jun 30, 2014 | Expired or cancelled expired Jul 2017 | 700 Lake St | change gas stove, hood, counter top in kitchen. change toilet sink, tile in bathroom. no walls moved. all fixture layouts and type to remain unchanged.Details
change gas stove, hood, counter top in kitchen. change toilet sink, tile in bathroom. no walls moved. all fixture layouts and type to remain unchanged. | $31,700 |
| Jul 18, 2013 | Never finaled issued Jul 2013, no final | 531 Haight St | install new cooking equipment under an extg 8' kitchen hood in existing limited restaurant. install a new sushi bar and some wall and partition. no change in use with this permit.Details
install new cooking equipment under an extg 8' kitchen hood in existing limited restaurant. install a new sushi bar and some wall and partition. no change in use with this permit. | $25,000 |
| Jul 10, 2012 | Completed final sign-off Mar 2013 | 2138 Irving St | add 6 ft hood in kitchenDetails
add 6 ft hood in kitchen | $10,000 |
| Oct 17, 2011 | Completed final sign-off Feb 2012 | 71 05th St | install a 5'x3' hood in the kitchen & 2 electrical cooker.Details
install a 5'x3' hood in the kitchen & 2 electrical cooker. | $8,000 |