Back to bathroom remodel contractors
Tommy K Woo
- Based in
- Fremont
- On San Francisco permits
- Jul 2001 to Dec 2023
- Last 24 months
- 0 permits filed
60 permits since 2000: 34 completed, 15 never finaled, 11 expired or cancelled.
Of the 15 never-finaled permits, 1 is 3 to 5 years old, 8 are 5 to 10 years old, 6 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
8 bathroom remodel permits: 6 completed, 1 never finaled, 1 expired or cancelled. Typically 18 days from filing to permit and 372 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 12, 2023 | Completed final sign-off Sep 2024 | 518 Mangels Av | 1/f new bathroom w/ new concrete slab, relocated (e) furnace & (e) water heater.Details
1/f new bathroom w/ new concrete slab, relocated (e) furnace & (e) water heater. | $43,500 |
| Sep 13, 2023 | Completed final sign-off Mar 2025 | 1570 41st Av | construct 2 bedroom, 1 full bath & wet bar on g/f. remodel (e) bathroom, construct 1 new bathroom at 2/f.Details
construct 2 bedroom, 1 full bath & wet bar on g/f. remodel (e) bathroom, construct 1 new bathroom at 2/f. | $148,000 |
| Feb 10, 2021 | Never finaled issued Feb 2021, no final | 502 08th Av | remodel ktichen & 2 bathrooms. no walls modified.Details
remodel ktichen & 2 bathrooms. no walls modified. | $17,000 |
| May 8, 2019 | Completed final sign-off Oct 2019 | 525 Excelsior Av | convert (e) storage to 1 new family room, entertainment room & powder room on 1st fl; relcoate (e) kitchen & staircase; infill lightwell and add master bathroom and add master bedroom on 2nd floorDetails
convert (e) storage to 1 new family room, entertainment room & powder room on 1st fl; relcoate (e) kitchen & staircase; infill lightwell and add master bathroom and add master bedroom on 2nd floor | $35,000 |
| Oct 12, 2018 | Completed final sign-off Feb 2019 | 2090 17th Av | new exterior stair from level 2 to rear yard. change 2 windows to doors. change 1 door to window. add shower to lower level bath. minor wall modifications to lower levelDetails
new exterior stair from level 2 to rear yard. change 2 windows to doors. change 1 door to window. add shower to lower level bath. minor wall modifications to lower level | $8,000 |
| Aug 29, 2016 | Completed final sign-off Oct 2020 | 274 Victoria St | comply with nov 201625382 permit for furnace/water heater. legalize(e)unit (unit b) on grd floor with 1 bedroom, 1 full bath, kitchen & living room per plan. add deck at rear of building for unit a access to rear yard (open common space) per plan. unit legalization ord 43-14.Details
comply with nov 201625382 permit for furnace/water heater. legalize(e)unit (unit b) on grd floor with 1 bedroom, 1 full bath, kitchen & living room per plan. add deck at rear of building for unit a access to rear yard (open common space) per plan. unit legalization ord 43-14. | $21,000 |
| Jul 28, 2015 | Completed final sign-off Jul 2017 | 700 Lake St | interior & minor exterior alterations including new dormers on roof, new family room & laundry on 1/f, new bathroom on 3/f & replace windows & door at 2/f deck. new chimney.Details
interior & minor exterior alterations including new dormers on roof, new family room & laundry on 1/f, new bathroom on 3/f & replace windows & door at 2/f deck. new chimney. | $112,000 |
| Jun 30, 2014 | Expired or cancelled expired Jul 2017 | 700 Lake St | change gas stove, hood, counter top in kitchen. change toilet sink, tile in bathroom. no walls moved. all fixture layouts and type to remain unchanged.Details
change gas stove, hood, counter top in kitchen. change toilet sink, tile in bathroom. no walls moved. all fixture layouts and type to remain unchanged. | $31,700 |