Back to kitchen remodel contractors
Tomasz R Podsiadly Construction
- Based in
- Redwood City
- On San Francisco permits
- Nov 2007 to Mar 2024
- Last 24 months
- 0 permits filed
40 permits since 2000: 32 completed, 8 never finaled.
Of the 8 never-finaled permits, 5 are 5 to 10 years old, 3 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
11 kitchen remodel permits: 9 completed, 2 never finaled. Typically 1 days from filing to permit and 185 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 2, 2019 | Never finaled issued Dec 2019, no final | 2094 California St | remodeling of (e) kitchen, new appliances, light fixtures, cabinets laundry. remodeling of (e) bathroom, new plumbing fixtures, tiles and light fixturesDetails
remodeling of (e) kitchen, new appliances, light fixtures, cabinets laundry. remodeling of (e) bathroom, new plumbing fixtures, tiles and light fixtures | $65,000 |
| Oct 18, 2017 | Never finaled issued Dec 2017, no final | 1591 Jackson St | #17 - kitchen & two bathrooms remodeling.Details
#17 - kitchen & two bathrooms remodeling. | $180,000 |
| May 3, 2017 | Completed final sign-off Nov 2017 | 2098 California St | remodel and update kitchen and bath. bedroom will be reconfigured to accomodate new bath. dining room closet will be reconfigured to accomodate stacked washer/dryer. update lighting and elec. replace windows kitchen bath dining rm maher not reqDetails
remodel and update kitchen and bath. bedroom will be reconfigured to accomodate new bath. dining room closet will be reconfigured to accomodate stacked washer/dryer. update lighting and elec. replace windows kitchen bath dining rm maher not req | $60,000 |
| Jan 13, 2017 | Completed final sign-off Oct 2017 | 551 Castro St | remodel: kitchen and (e) bathroom. add master bathroonm and closet space for front bedroomDetails
remodel: kitchen and (e) bathroom. add master bathroonm and closet space for front bedroom | $92,000 |
| May 11, 2015 | Completed final sign-off Apr 2016 | 1958 Vallejo St | unit #3 - remodel kitchen & 2 bathroom & laundry room remove parttion walls.Details
unit #3 - remodel kitchen & 2 bathroom & laundry room remove parttion walls. | $20,000 |
| Sep 4, 2014 | Completed final sign-off Feb 2015 | 1252 08th Av | kitchen and 1 powder room; new kitchen cabinets, appliances. to comply with cec150.0(k) 3 & 5Details
kitchen and 1 powder room; new kitchen cabinets, appliances. to comply with cec150.0(k) 3 & 5 | $70,000 |
| Aug 4, 2014 | Completed final sign-off Jan 2015 | 2506 Polk St | unit #3: kitchen remodel, new cabinets and appliances. bathroom remodel per plan. new plumbing fixtures. add new stacked up washer and dryer.Details
unit #3: kitchen remodel, new cabinets and appliances. bathroom remodel per plan. new plumbing fixtures. add new stacked up washer and dryer. | $37,000 |
| May 31, 2013 | Completed final sign-off Mar 2014 | 1170 Sacramento St | 8th floor-unit #8d-remodeling/new kitchen, bathroom, ceiling light fixtures, new hardwood floor. new door, windows in elevator vestibule.Details
8th floor-unit #8d-remodeling/new kitchen, bathroom, ceiling light fixtures, new hardwood floor. new door, windows in elevator vestibule. | $328,000 |
| Feb 15, 2013 | Completed final sign-off Aug 2013 | 1 Baker St | replacing kitchen cabinets countertops new appliances, 4 ceiling lights, painting ,plumbing remains the same location, lighting shall comply w/t-24Details
replacing kitchen cabinets countertops new appliances, 4 ceiling lights, painting ,plumbing remains the same location, lighting shall comply w/t-24 | $6,800 |
| Nov 9, 2011 | Completed final sign-off Mar 2012 | 1170 Sacramento St | new 2 shower valves & tiles in 2 bathrms, install 3 sinks & 3 toilets in bathrms & powder rm, sink in the kitchen, hardwood floor, painting, new light fixture in kitchen & hallway. no wall relocation, maintain (e) fire rating on all walls with min. 1 layer 5/8" type x gypsum board where disturbed.Details
new 2 shower valves & tiles in 2 bathrms, install 3 sinks & 3 toilets in bathrms & powder rm, sink in the kitchen, hardwood floor, painting, new light fixture in kitchen & hallway. no wall relocation, maintain (e) fire rating on all walls with min. 1 layer 5/8" type x gypsum board where disturbed. | $67,000 |
| May 5, 2011 | Completed final sign-off Oct 2011 | 243 07th Av | kitchen remodeling-adding can lights, relocating sink & stoveDetails
kitchen remodeling-adding can lights, relocating sink & stove | $17,000 |