Back to bathroom remodel contractors
Tomasz R Podsiadly Construction
- Based in
- Redwood City
- On San Francisco permits
- Nov 2007 to Mar 2024
- Last 24 months
- 0 permits filed
40 permits since 2000: 32 completed, 8 never finaled.
Of the 8 never-finaled permits, 5 are 5 to 10 years old, 3 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
16 bathroom remodel permits: 13 completed, 3 never finaled. Typically 0 days from filing to permit and 123 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 4, 2020 | Completed final sign-off Aug 2023 | 793 Cole St | remodeling of (e) bathroom on 2/f; adding new master bathroom on 2/f walkin-in closet. no strurctural work.Details
remodeling of (e) bathroom on 2/f; adding new master bathroom on 2/f walkin-in closet. no strurctural work. | $75,000 |
| Dec 2, 2019 | Never finaled issued Dec 2019, no final | 2094 California St | remodeling of (e) kitchen, new appliances, light fixtures, cabinets laundry. remodeling of (e) bathroom, new plumbing fixtures, tiles and light fixturesDetails
remodeling of (e) kitchen, new appliances, light fixtures, cabinets laundry. remodeling of (e) bathroom, new plumbing fixtures, tiles and light fixtures | $65,000 |
| Oct 18, 2017 | Never finaled issued Dec 2017, no final | 1591 Jackson St | #17 - kitchen & two bathrooms remodeling.Details
#17 - kitchen & two bathrooms remodeling. | $180,000 |
| May 3, 2017 | Completed final sign-off Nov 2017 | 2098 California St | remodel and update kitchen and bath. bedroom will be reconfigured to accomodate new bath. dining room closet will be reconfigured to accomodate stacked washer/dryer. update lighting and elec. replace windows kitchen bath dining rm maher not reqDetails
remodel and update kitchen and bath. bedroom will be reconfigured to accomodate new bath. dining room closet will be reconfigured to accomodate stacked washer/dryer. update lighting and elec. replace windows kitchen bath dining rm maher not req | $60,000 |
| Mar 24, 2017 | Never finaled issued Mar 2017, no final | 2267 Market St | bathroom remodel: replacing plumbing fixtures, new toilet, new sink, new light fixtures and paint. new linoleum floor.Details
bathroom remodel: replacing plumbing fixtures, new toilet, new sink, new light fixtures and paint. new linoleum floor. | $4,500 |
| Jan 13, 2017 | Completed final sign-off Oct 2017 | 551 Castro St | remodel: kitchen and (e) bathroom. add master bathroonm and closet space for front bedroomDetails
remodel: kitchen and (e) bathroom. add master bathroonm and closet space for front bedroom | $92,000 |
| May 11, 2015 | Completed final sign-off Apr 2016 | 1958 Vallejo St | unit #3 - remodel kitchen & 2 bathroom & laundry room remove parttion walls.Details
unit #3 - remodel kitchen & 2 bathroom & laundry room remove parttion walls. | $20,000 |
| Mar 30, 2015 | Completed final sign-off Jun 2015 | 1275 Bay St | unit #4: remodeling of 2 extg bathrooms, drywall repairs. like for like. no moving of fixtures or walls etc.Details
unit #4: remodeling of 2 extg bathrooms, drywall repairs. like for like. no moving of fixtures or walls etc. | $40,000 |
| Aug 4, 2014 | Completed final sign-off Jan 2015 | 2506 Polk St | unit #3: kitchen remodel, new cabinets and appliances. bathroom remodel per plan. new plumbing fixtures. add new stacked up washer and dryer.Details
unit #3: kitchen remodel, new cabinets and appliances. bathroom remodel per plan. new plumbing fixtures. add new stacked up washer and dryer. | $37,000 |
| Jun 24, 2014 | Completed final sign-off Sep 2014 | 1270 Union St | remodeling of (e) bathroom. new bathtub and sink.Details
remodeling of (e) bathroom. new bathtub and sink. | $15,000 |
| Apr 18, 2014 | Completed final sign-off Aug 2014 | 1275 Bay St | #3: relocating shower enlcosure at (n) bathroom adding shower enclosure at guest bedroom, adding powder room at hallway.Details
#3: relocating shower enlcosure at (n) bathroom adding shower enclosure at guest bedroom, adding powder room at hallway. | $50,000 |
| May 31, 2013 | Completed final sign-off Mar 2014 | 1170 Sacramento St | 8th floor-unit #8d-remodeling/new kitchen, bathroom, ceiling light fixtures, new hardwood floor. new door, windows in elevator vestibule.Details
8th floor-unit #8d-remodeling/new kitchen, bathroom, ceiling light fixtures, new hardwood floor. new door, windows in elevator vestibule. | $328,000 |
| Jan 11, 2013 | Completed final sign-off Mar 2013 | 1170 Sacramento St | unit #19c-demolition of (e) bathroom fixtures & wall removal. no structural work. common areaDetails
unit #19c-demolition of (e) bathroom fixtures & wall removal. no structural work. common area | $8,000 |
| Oct 17, 2011 | Completed final sign-off Feb 2012 | 1 Baker St | work in unit 6a: bathroom remodel, replacing bathtub, shower valve, new tiles, vanity, ceiling lights, sink faucet, toilet. non structural.Details
work in unit 6a: bathroom remodel, replacing bathtub, shower valve, new tiles, vanity, ceiling lights, sink faucet, toilet. non structural. | $12,600 |
| Nov 4, 2010 | Completed final sign-off Jan 2011 | 584 Clipper St | remodeling upstairs bathroom, adding shower enclosure two (2) ceiling recessed light; existing toilet and vanity.Details
remodeling upstairs bathroom, adding shower enclosure two (2) ceiling recessed light; existing toilet and vanity. | $14,000 |
| Oct 4, 2010 | Completed final sign-off Nov 2010 | 1 Baker St | bathroom remodel, new shower enclosure, pedestal sink, new heated floor, new light, replace in kind, provide h.e. lights per cec150(k)Details
bathroom remodel, new shower enclosure, pedestal sink, new heated floor, new light, replace in kind, provide h.e. lights per cec150(k) | $12,000 |