Back to kitchen remodel contractors
Todd Pattison & Associates
- Based in
- San Francisco
- On San Francisco permits
- Feb 2010 to Jan 2017
- Last 24 months
- 0 permits filed
16 permits since 2000: 13 completed, 1 never finaled, 2 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
4 kitchen remodel permits: 2 completed, 2 expired or cancelled. Typically 195 days from filing to permit and 367 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 18, 2013 | Completed final sign-off Oct 2015 | 507 09th Av | 2-story addition to rear of (e) building, remodel (e) kitchen & bathroom.Details
2-story addition to rear of (e) building, remodel (e) kitchen & bathroom. | $75,000 |
| Oct 12, 2012 | Expired or cancelled cancelled Jun 2013 | 507 09th Av | 2-story addition to rear of existing building. remodel existing kitchen and bathrooms.Details
2-story addition to rear of existing building. remodel existing kitchen and bathrooms. | $50,000 |
| Jul 18, 2012 | Expired or cancelled cancelled Nov 2024 | 507 09th Av | rear two story addition. enlarge kitchen, new breakfast nook at second floor, master bedroom & deck at third floor..Details
rear two story addition. enlarge kitchen, new breakfast nook at second floor, master bedroom & deck at third floor.. | $175,000 |
| May 3, 2012 | Completed final sign-off Sep 2012 | 201 Warren Dr | revision to pa# 2011-0801-1438-kitchenh remodel-re-face cabinets, new sink, countertops. 2 bathrooms remodels. new tile, cabinets, sink, countertops, 6 new can lights (led), 4 outlets to be replaced, no change in wallls.Details
revision to pa# 2011-0801-1438-kitchenh remodel-re-face cabinets, new sink, countertops. 2 bathrooms remodels. new tile, cabinets, sink, countertops, 6 new can lights (led), 4 outlets to be replaced, no change in wallls. | $10,000 |