Todd Pattison & Associates
- Based in
- San Francisco
- On San Francisco permits
- Feb 2010 to Jan 2017
- Last 24 months
- 0 permits filed
16 permits since 2000: 13 completed, 1 never finaled, 2 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 20, 2017 | Completed final sign-off Apr 2017 | 3166 Baker St | install new 30" x 30" skylight. n/a maherDetails
install new 30" x 30" skylight. n/a maher | $5,000 |
| Dec 21, 2016 | Completed final sign-off Apr 2017 | 3166 Baker St | addition of new bathroom at 3rd level. relocate and install new door at master bedroomDetails
addition of new bathroom at 3rd level. relocate and install new door at master bedroom | $35,000 |
| Aug 15, 2016 | Completed final sign-off Sep 2016 | 2544 Washington St | remove 1/2" drywall from ceiling & rep with 5/8 type x drywall. 1 hr rated fireboxes to be installed around each replacement can light. rel. electric panel, rep. elect. wiring throughout, rep. e halogen can lights with new 4" led can lights(8 total). increase shower head height by 6". inst. n toiletDetails
remove 1/2" drywall from ceiling & rep with 5/8 type x drywall. 1 hr rated fireboxes to be installed around each replacement can light. rel. electric panel, rep. elect. wiring throughout, rep. e halogen can lights with new 4" led can lights(8 total). increase shower head height by 6". inst. n toilet | $24,000 |
| Jul 17, 2014 | Completed final sign-off Oct 2015 | 507 09th Av | reroofingDetails
reroofing | $15,000 |
| Jul 18, 2013 | Completed final sign-off Oct 2015 | 507 09th Av | 2-story addition to rear of (e) building, remodel (e) kitchen & bathroom.Details
2-story addition to rear of (e) building, remodel (e) kitchen & bathroom. | $75,000 |
| Oct 23, 2012 | Never finaled issued Oct 2012, no final | 648 04th St | repair & replace existing siding with matching siding, same siding; no changes, alterations etc)Details
repair & replace existing siding with matching siding, same siding; no changes, alterations etc) | $5,000 |
| Oct 12, 2012 | Expired or cancelled cancelled Jun 2013 | 507 09th Av | 2-story addition to rear of existing building. remodel existing kitchen and bathrooms.Details
2-story addition to rear of existing building. remodel existing kitchen and bathrooms. | $50,000 |
| Jul 18, 2012 | Expired or cancelled cancelled Nov 2024 | 507 09th Av | rear two story addition. enlarge kitchen, new breakfast nook at second floor, master bedroom & deck at third floor..Details
rear two story addition. enlarge kitchen, new breakfast nook at second floor, master bedroom & deck at third floor.. | $175,000 |
| May 3, 2012 | Completed final sign-off Sep 2012 | 201 Warren Dr | revision to pa# 2011-0801-1438-kitchenh remodel-re-face cabinets, new sink, countertops. 2 bathrooms remodels. new tile, cabinets, sink, countertops, 6 new can lights (led), 4 outlets to be replaced, no change in wallls.Details
revision to pa# 2011-0801-1438-kitchenh remodel-re-face cabinets, new sink, countertops. 2 bathrooms remodels. new tile, cabinets, sink, countertops, 6 new can lights (led), 4 outlets to be replaced, no change in wallls. | $10,000 |
| Sep 21, 2011 | Completed final sign-off Sep 2012 | 201 Warren Dr | revision to application #201108011438. revision to foundation plan to keep (e) footing.Details
revision to application #201108011438. revision to foundation plan to keep (e) footing. | |
| Aug 1, 2011 | Completed final sign-off Sep 2012 | 201 Warren Dr | install new bedroom, 1 full bathroom & laundry room at 1st level. infill at 1st level.Details
install new bedroom, 1 full bathroom & laundry room at 1st level. infill at 1st level. | $28,000 |
| Aug 1, 2011 | Completed final sign-off Oct 2015 | 507 09th Av | reconstruct driveway and install planters.Details
reconstruct driveway and install planters. | $9,000 |
| Jul 5, 2011 | Completed final sign-off Oct 2015 | 507 09th Av | dry wall garage walls and ceiling, new sewer line, new washer hook-up,new panelDetails
dry wall garage walls and ceiling, new sewer line, new washer hook-up,new panel | $2,500 |
| Jan 27, 2011 | Completed final sign-off Oct 2015 | 507 09th Av | replace existing wood beam with new steel beam, lower slab to 8'0 clr. widen garage door to 8'6.Details
replace existing wood beam with new steel beam, lower slab to 8'0 clr. widen garage door to 8'6. | $32,000 |
| Mar 8, 2010 | Completed final sign-off Jan 2012 | 237 Warren Dr | rear deck addition only at 1st & 2nd floors.Details
rear deck addition only at 1st & 2nd floors. | $18,000 |
| Feb 2, 2010 | Completed final sign-off Nov 2011 | 237 Warren Dr | in-kind replace existing 18 windows with dual pane low e, four of the windows at front. replace one glass sliding door in-kind at rear.Details
in-kind replace existing 18 windows with dual pane low e, four of the windows at front. replace one glass sliding door in-kind at rear. | $15,000 |