Todd Morris Fire Protection Inc.
- Based in
- San Rafael
- On San Francisco permits
- Feb 2013 to Sep 2026
- Last 24 months
- 39 permits filed
307 permits since 2000: 219 completed, 24 in progress, 57 never finaled, 7 expired or cancelled.
Of the 57 never-finaled permits, 10 are 3 to 5 years old, 29 are 5 to 10 years old, 18 are over 10 years old. 2 were filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
1 stairs permit: 1 completed. Typically 0 days from filing to permit and 680 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 23, 2023 | Completed final sign-off Jan 2025 | 2230 Leavenworth St | fire only: relocate roof manifold and hose connections to the opposite side of the stair. addition 10'-6" of 4" standpipe. ref to 2019 0923 2739Details
fire only: relocate roof manifold and hose connections to the opposite side of the stair. addition 10'-6" of 4" standpipe. ref to 2019 0923 2739 | $6,000 |