Back to kitchen remodel contractors
Todd Morris Fire Protection Inc.
- Based in
- San Rafael
- On San Francisco permits
- Feb 2013 to Sep 2026
- Last 24 months
- 39 permits filed
307 permits since 2000: 219 completed, 24 in progress, 57 never finaled, 7 expired or cancelled.
Of the 57 never-finaled permits, 10 are 3 to 5 years old, 29 are 5 to 10 years old, 18 are over 10 years old. 2 were filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
1 kitchen remodel permit: 1 completed. Typically 0 days from filing to permit and 205 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 26, 2025 | Completed final sign-off Mar 2026 | 2512 Pacific Av | fire sprinlker only, existing system ti. relocate head in pantry due to light fixture. heads in kitchen, ceiling elevation change, head at stairwell, sprinkler head in wallDetails
fire sprinlker only, existing system ti. relocate head in pantry due to light fixture. heads in kitchen, ceiling elevation change, head at stairwell, sprinkler head in wall | $3,480 |