Back to kitchen remodel contractors
Tipperary Construction
- Based in
- Clayton
- On San Francisco permits
- Apr 2012 to Jan 2013
- Last 24 months
- 0 permits filed
2 permits since 2000: 2 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
1 kitchen remodel permit: 1 completed. Typically 0 days from filing to permit and 97 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 31, 2013 | Completed final sign-off May 2013 | 449 28th Av | (1) bathroom & (1) kitchen remodel. new electrical, new plumbing, new hood vent, new window, new cabinets, tile floor, new lights @ kitchen. new tub, new cultured marble walls, new valve, new toilet, new lights, & fan, new floor tile, new window @ bathroom. lighting to comply with cec 150 (k).Details
(1) bathroom & (1) kitchen remodel. new electrical, new plumbing, new hood vent, new window, new cabinets, tile floor, new lights @ kitchen. new tub, new cultured marble walls, new valve, new toilet, new lights, & fan, new floor tile, new window @ bathroom. lighting to comply with cec 150 (k). | $28,000 |