Back to bathroom remodel contractors
Tipperary Construction
- Based in
- Clayton
- On San Francisco permits
- Apr 2012 to Jan 2013
- Last 24 months
- 0 permits filed
2 permits since 2000: 2 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
2 bathroom remodel permits: 2 completed. Typically 0 days from filing to permit and 92 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 31, 2013 | Completed final sign-off May 2013 | 449 28th Av | (1) bathroom & (1) kitchen remodel. new electrical, new plumbing, new hood vent, new window, new cabinets, tile floor, new lights @ kitchen. new tub, new cultured marble walls, new valve, new toilet, new lights, & fan, new floor tile, new window @ bathroom. lighting to comply with cec 150 (k).Details
(1) bathroom & (1) kitchen remodel. new electrical, new plumbing, new hood vent, new window, new cabinets, tile floor, new lights @ kitchen. new tub, new cultured marble walls, new valve, new toilet, new lights, & fan, new floor tile, new window @ bathroom. lighting to comply with cec 150 (k). | $28,000 |
| Apr 30, 2012 | Completed final sign-off Jul 2012 | 447 28th Av | bathroom remodel, remove tile and replace with cultured marble. add new gfci and new light fixtures and plumbing fixtures. comply with cec 150(k).Details
bathroom remodel, remove tile and replace with cultured marble. add new gfci and new light fixtures and plumbing fixtures. comply with cec 150(k). | $15,000 |