The Banner Development Company
- Based in
- San Francisco
- On San Francisco permits
- Jun 2007 to Oct 2022
- Last 24 months
- 0 permits filed
36 permits since 2000: 30 completed, 2 never finaled, 4 expired or cancelled.
Of the 2 never-finaled permits, 1 is 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
7 stairs permits: 6 completed, 1 expired or cancelled. Typically 0 days from filing to permit and 266 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 5, 2020 | Completed final sign-off Nov 2020 | 742 15th Av | 3rd fl: remodel (e) bathroom & create (n) bathroom & add 3 skylights. 2nd fl:remodel (e) kitchen & (e) bathroom. grond fl: add bathroom, fmaily room & bedroom, w/new windows & patio doors. rear patio remodel. new foundation, partial. add staircase. rear excavation is less than 8 feet in depth.Details
3rd fl: remodel (e) bathroom & create (n) bathroom & add 3 skylights. 2nd fl:remodel (e) kitchen & (e) bathroom. grond fl: add bathroom, fmaily room & bedroom, w/new windows & patio doors. rear patio remodel. new foundation, partial. add staircase. rear excavation is less than 8 feet in depth. | $200,000 |
| Nov 10, 2015 | Completed final sign-off Nov 2015 | 17 Baker St | remove and replace dry rot wood steps/siding at front stairs in kind - less than 50 percentDetails
remove and replace dry rot wood steps/siding at front stairs in kind - less than 50 percent | $6,500 |
| May 6, 2015 | Completed final sign-off Jan 2016 | 1022 Stanyan St | remodel (1) kitchen and (6) bathrooms, repair dry rot at rear deck and stairs, frame new closets, repair dry rot at rear patio door, replace dry rot window and doors as required at rear deck and stair less than 50%Details
remodel (1) kitchen and (6) bathrooms, repair dry rot at rear deck and stairs, frame new closets, repair dry rot at rear patio door, replace dry rot window and doors as required at rear deck and stair less than 50% | $189,000 |
| Jan 26, 2015 | Completed final sign-off Dec 2015 | 17 Baker St | dryrot repair less than 50% stair at rear of bldg.Details
dryrot repair less than 50% stair at rear of bldg. | $12,000 |
| Jan 26, 2015 | Expired or cancelled cancelled Jan 2016 | 199 Carl St | dryrot repair at deck and stairs at rear of bldg, less than 50%Details
dryrot repair at deck and stairs at rear of bldg, less than 50% | $15,000 |
| May 6, 2014 | Completed final sign-off Feb 2015 | 1291 33rd Av | remodel 3 & 1/2 bathrooms, 1 kitchen, repair dry rot at stairs deck, new electrical & plumbing under seperate permit. permit to comply with complaint/nov# 201332031, 201471931Details
remodel 3 & 1/2 bathrooms, 1 kitchen, repair dry rot at stairs deck, new electrical & plumbing under seperate permit. permit to comply with complaint/nov# 201332031, 201471931 | $65,000 |
| Sep 3, 2013 | Completed final sign-off Apr 2014 | 667 28th St | remodel 1 kitchen, 2 bathrooms, remove sheetrock/lath/plaster as required, install hardwood on stairs, refinish floors, paint, concrete entry way.Details
remodel 1 kitchen, 2 bathrooms, remove sheetrock/lath/plaster as required, install hardwood on stairs, refinish floors, paint, concrete entry way. | $47,000 |