Block 1273, lot 017A
199 Carl St
The city’s assessor roll has no record for this parcel.
Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
8 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jan 6, 2016 | Completed final sign-off Mar 2016 | 199 Carl St | The Banner Development Company | comply with nov 201584501. to be routed up to preservation tech spec for review per bbn.Details
comply with nov 201584501. to be routed up to preservation tech spec for review per bbn. | $2,000 |
| Nov 24, 2015 | Completed final sign-off Mar 2016 | 199 Carl St | The Banner Development Company | to verify that the legal use & occupancy of this bldg is a four story single family residence. this determination is based on a review of city records including sanborn map. assessors records & dbi bldg permit history. no work on this permit.Details
to verify that the legal use & occupancy of this bldg is a four story single family residence. this determination is based on a review of city records including sanborn map. assessors records & dbi bldg permit history. no work on this permit. | |
| Nov 20, 2015 | Expired or cancelled cancelled Dec 2015 | 199 Carl St | The Banner Development Company | verification of unit count.Details
verification of unit count. | |
| Jun 10, 2015 | Never finaled issued Jun 2015, no final | 199 Carl St | sidewalk repairDetails
sidewalk repair | ||
| Apr 27, 2015 | Completed final sign-off Nov 2015 | 199 Carl St | Serrano Fire Protection Systems | install fire suppression system in new car stacker, in a detached garage. work includes a new 2" dedicated fire service.Details
install fire suppression system in new car stacker, in a detached garage. work includes a new 2" dedicated fire service. | $4,000 |
| Jan 26, 2015 | Expired or cancelled cancelled Jan 2016 | 199 Carl St | The Banner Development Company | dryrot repair at deck and stairs at rear of bldg, less than 50%Details
dryrot repair at deck and stairs at rear of bldg, less than 50% | $15,000 |
| Aug 6, 2014 | Completed final sign-off Nov 2015 | 199 Carl St | The Banner Development Company | install new car stacker; new concrete mat slab foundation; strengthen garage roof framing; no change in building envelope & appearance.Details
install new car stacker; new concrete mat slab foundation; strengthen garage roof framing; no change in building envelope & appearance. | $30,000 |
| Jul 7, 2014 | Completed final sign-off Nov 2015 | 199 Carl St | The Banner Development Company | remodel 6 bathrooms and one kitchen reframe closets new closet doors. elect and plumbing under seperate permits.Details
remodel 6 bathrooms and one kitchen reframe closets new closet doors. elect and plumbing under seperate permits. | $65,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- The Banner Development Company (6), Serrano Fire Protection Systems
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.