Back to kitchen remodel contractors
Tam And Sons Inc
- Based in
- San Francisco
- On San Francisco permits
- May 2019 to Jun 2025
- Last 24 months
- 1 permit filed
13 permits since 2000: 9 completed, 2 in progress, 2 never finaled.
Of the 2 never-finaled permits, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
5 kitchen remodel permits: 5 completed. Typically 0 days from filing to permit and 224 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 10, 2024 | Completed final sign-off Aug 2024 | 243 Avila St | remodel existing kitchen on main floor. no layout changes. no structural changes. no new wall and no existing wall relocation. new lighting shall comply with cec 150.0(k)3.Details
remodel existing kitchen on main floor. no layout changes. no structural changes. no new wall and no existing wall relocation. new lighting shall comply with cec 150.0(k)3. | $32,000 |
| Mar 6, 2024 | Completed final sign-off Nov 2024 | 567 14th Av | unit# 569 - remodel (1) bathroom w/ new toilet, tub, sink. remodel (1) kitchen. all work to be in unit #569. no structural work. no interior change to layout.Details
unit# 569 - remodel (1) bathroom w/ new toilet, tub, sink. remodel (1) kitchen. all work to be in unit #569. no structural work. no interior change to layout. | $45,000 |
| Jun 10, 2022 | Completed final sign-off Aug 2022 | 551 03rd Av | replace 2 bathtubs w/ in kind tub, replace tiles around tub and on floor for 2 tubs. replace floor in kitchen floor, paint entire unit. work done on 551 2nd floor. no structral work & no change in floor plan or wall layoutDetails
replace 2 bathtubs w/ in kind tub, replace tiles around tub and on floor for 2 tubs. replace floor in kitchen floor, paint entire unit. work done on 551 2nd floor. no structral work & no change in floor plan or wall layout | $15,000 |
| Sep 7, 2021 | Completed final sign-off Mar 2023 | 1211 39th Av | comply w/complaint #202179616 rearange rooms, stairs remodel kitchen & bath, add bath on 2nd & 3rd fl. add bedroom a full bathroom & study on 1st fl. relocate/replace door w/ aluminum and wood windows/door at front, replace windows/door w/vinyl at rear update plumbing and electricalDetails
comply w/complaint #202179616 rearange rooms, stairs remodel kitchen & bath, add bath on 2nd & 3rd fl. add bedroom a full bathroom & study on 1st fl. relocate/replace door w/ aluminum and wood windows/door at front, replace windows/door w/vinyl at rear update plumbing and electrical | $180,000 |
| May 17, 2019 | Completed final sign-off Dec 2019 | 6909 California St | remodel kitchen and bathroom, upgrade electrical, replace ceiling lights. kitchen 150 sq ft. bathroom 70sq ft. no change in layout, no structural work. no change to load bearing walls. (lighting, h.e per cec150k)Details
remodel kitchen and bathroom, upgrade electrical, replace ceiling lights. kitchen 150 sq ft. bathroom 70sq ft. no change in layout, no structural work. no change to load bearing walls. (lighting, h.e per cec150k) | $90,000 |