Back to bathroom remodel contractors
Tam And Sons Inc
- Based in
- San Francisco
- On San Francisco permits
- May 2019 to Jun 2025
- Last 24 months
- 1 permit filed
13 permits since 2000: 9 completed, 2 in progress, 2 never finaled.
Of the 2 never-finaled permits, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
5 bathroom remodel permits: 5 completed. Typically 0 days from filing to permit and 224 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 6, 2024 | Completed final sign-off Nov 2024 | 567 14th Av | unit# 569 - remodel (1) bathroom w/ new toilet, tub, sink. remodel (1) kitchen. all work to be in unit #569. no structural work. no interior change to layout.Details
unit# 569 - remodel (1) bathroom w/ new toilet, tub, sink. remodel (1) kitchen. all work to be in unit #569. no structural work. no interior change to layout. | $45,000 |
| Nov 6, 2023 | Completed final sign-off Feb 2024 | 1250 Francisco St | 1 bathroom remodel: replace in-kind tub, otilet, sink in bathroom. replace tile around tub & floor. no strutcural, no layout changes, wall changes.Details
1 bathroom remodel: replace in-kind tub, otilet, sink in bathroom. replace tile around tub & floor. no strutcural, no layout changes, wall changes. | $12,000 |
| Sep 7, 2021 | Completed final sign-off Mar 2023 | 1211 39th Av | comply w/complaint #202179616 rearange rooms, stairs remodel kitchen & bath, add bath on 2nd & 3rd fl. add bedroom a full bathroom & study on 1st fl. relocate/replace door w/ aluminum and wood windows/door at front, replace windows/door w/vinyl at rear update plumbing and electricalDetails
comply w/complaint #202179616 rearange rooms, stairs remodel kitchen & bath, add bath on 2nd & 3rd fl. add bedroom a full bathroom & study on 1st fl. relocate/replace door w/ aluminum and wood windows/door at front, replace windows/door w/vinyl at rear update plumbing and electrical | $180,000 |
| Oct 8, 2019 | Completed final sign-off Feb 2020 | 738 Filbert St | remodel 1 ktichen & 1 bathroom with upgrade elecvtrical and plumbing., remodel with new lights. no structural work. no changes to wall layout.Details
remodel 1 ktichen & 1 bathroom with upgrade elecvtrical and plumbing., remodel with new lights. no structural work. no changes to wall layout. | $120,000 |
| May 17, 2019 | Completed final sign-off Dec 2019 | 6909 California St | remodel kitchen and bathroom, upgrade electrical, replace ceiling lights. kitchen 150 sq ft. bathroom 70sq ft. no change in layout, no structural work. no change to load bearing walls. (lighting, h.e per cec150k)Details
remodel kitchen and bathroom, upgrade electrical, replace ceiling lights. kitchen 150 sq ft. bathroom 70sq ft. no change in layout, no structural work. no change to load bearing walls. (lighting, h.e per cec150k) | $90,000 |