Back to kitchen remodel contractors
Talmadge Maintenance & Repair
- Based in
- South San Francisco
- On San Francisco permits
- Aug 2006 to Oct 2016
- Last 24 months
- 0 permits filed
10 permits since 2000: 10 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
3 kitchen remodel permits: 3 completed. Typically 0 days from filing to permit and 105 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 18, 2016 | Completed final sign-off Feb 2017 | 1610 Lombard St | work in unit #104: remodel kitchen: remove/replace cabinets, sink, appliances and flooring. install electrical for microwave and dishwasher. bathroom: remove/replace toilet, vanity and shower controls. install outlet and fan.Details
work in unit #104: remodel kitchen: remove/replace cabinets, sink, appliances and flooring. install electrical for microwave and dishwasher. bathroom: remove/replace toilet, vanity and shower controls. install outlet and fan. | $17,000 |
| Jun 14, 2016 | Completed final sign-off Sep 2016 | 1610 Lombard St | apt# 102. remodel kitchen. n/a for maher.Details
apt# 102. remodel kitchen. n/a for maher. | $14,000 |
| Oct 3, 2013 | Completed final sign-off Dec 2013 | 1 Daniel Burnham Ct | #219- remodel kitchen:remove/replace kitchen cabinets & countertops,patch & paint after electrician,install back splash, disposal,faucet & install hot water dispenser,light fixture,re-route gfci elec outlets as needed. re-route dedicated outlets for appliances,install recessed light @ bathrm closet.Details
#219- remodel kitchen:remove/replace kitchen cabinets & countertops,patch & paint after electrician,install back splash, disposal,faucet & install hot water dispenser,light fixture,re-route gfci elec outlets as needed. re-route dedicated outlets for appliances,install recessed light @ bathrm closet. | $10,000 |