Back to kitchen remodel contractors
Takoma Carpentry & Remodeling
- Based in
- San Francisco
- On San Francisco permits
- Jan 2004 to Jul 2020
- Last 24 months
- 0 permits filed
49 permits since 2000: 44 completed, 2 never finaled, 3 expired or cancelled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
24 kitchen remodel permits: 23 completed, 1 expired or cancelled. Typically 0 days from filing to permit and 167 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 13, 2019 | Completed final sign-off Feb 2020 | 4344 26th St | replace (2) upper level rear french exterior doors w/single stacking 3-panel 10-foot wide unit. remove non-structural wall & remodel kitchen with new cabinets, counters, appliances, plumbing & electrical fixtures.Details
replace (2) upper level rear french exterior doors w/single stacking 3-panel 10-foot wide unit. remove non-structural wall & remodel kitchen with new cabinets, counters, appliances, plumbing & electrical fixtures. | $24,500 |
| May 23, 2019 | Completed final sign-off Dec 2019 | 442 Los Palmos Dr | 2nd flr - kitchen remodel in-kind replacement same quality as (e) addition of half bath, replace (e) window header beamDetails
2nd flr - kitchen remodel in-kind replacement same quality as (e) addition of half bath, replace (e) window header beam | $15,000 |
| May 17, 2019 | Completed final sign-off Oct 2019 | 2923 23rd St | remodel kitchen in kind. new cabinets, counters and appliances.Details
remodel kitchen in kind. new cabinets, counters and appliances. | $18,500 |
| Apr 19, 2019 | Completed final sign-off Oct 2019 | 188 Alpine Tr | in kind kitchen remodel. new floor, cabinets, counters, appliances and fixturesDetails
in kind kitchen remodel. new floor, cabinets, counters, appliances and fixtures | $17,500 |
| Mar 11, 2019 | Completed final sign-off Sep 2019 | 244 Murray St | rev to pa# 201901241145; remove non structural wall between kitchen & dining roomDetails
rev to pa# 201901241145; remove non structural wall between kitchen & dining room | $1,800 |
| Mar 11, 2019 | Completed final sign-off Jul 2019 | 2801 Jackson St | kitchen remodel, remove and replace cabinets, counters, backsplash and appliances, no wall removal, all fixtures stay in e location in kind kitchen remodelDetails
kitchen remodel, remove and replace cabinets, counters, backsplash and appliances, no wall removal, all fixtures stay in e location in kind kitchen remodel | $25,000 |
| Jan 24, 2019 | Completed final sign-off Sep 2019 | 244 Murray St | kitchen remodel - cancel 3 windows at east side and relocate 3 windows at rear. demo non-structural interior walls. (n) cabinetry, relocate and replace sinkDetails
kitchen remodel - cancel 3 windows at east side and relocate 3 windows at rear. demo non-structural interior walls. (n) cabinetry, relocate and replace sink | $25,000 |
| Dec 6, 2018 | Completed final sign-off Sep 2019 | 650 Visitacion Av | kitchen remodel: replace cabinets, counters, and appliances in same as existing location. no walls moved, removed, added, or infilled. all existing layouts to remain unchanged.Details
kitchen remodel: replace cabinets, counters, and appliances in same as existing location. no walls moved, removed, added, or infilled. all existing layouts to remain unchanged. | $18,500 |
| Nov 29, 2018 | Completed final sign-off Jul 2019 | 823 27th Av | interior alteration in (e) wood frame sfd. kitchen & select windows replacement in kind not visible from streetDetails
interior alteration in (e) wood frame sfd. kitchen & select windows replacement in kind not visible from street | $20,000 |
| Sep 17, 2018 | Completed final sign-off Feb 2019 | 55 Los Palmos Dr | kitchen remodel in kind w/ all new fixts. 3 window replacement same size in-kind, not visible from street.Details
kitchen remodel in kind w/ all new fixts. 3 window replacement same size in-kind, not visible from street. | $24,000 |
| Jun 14, 2018 | Completed final sign-off Sep 2018 | 315 Scott St | kitchen remodel: repalce allcaibnets, counters, backsplash, appliances, flooring & hardware. all fixtures to remain in (e) locations.Details
kitchen remodel: repalce allcaibnets, counters, backsplash, appliances, flooring & hardware. all fixtures to remain in (e) locations. | $14,500 |
| Mar 20, 2018 | Completed final sign-off Jan 2019 | 45 Longview Ct | kitchen remodel: removal of separating wall between kitchen and living area. installation of new appliances, cabinets, counters and fixtures.Details
kitchen remodel: removal of separating wall between kitchen and living area. installation of new appliances, cabinets, counters and fixtures. | $22,000 |
| Oct 4, 2017 | Completed final sign-off Jul 2018 | 27 Los Palmos Dr | replace 4 front windows with aluminum-clad wood windows (2 french casement, 1 hopper, and 1 fixed); replace front door with wood door. replace 3 interior doors & update electrical to kitchen, bath & office. kitchen & bath remodel. replace all cabinets, counter, appliances & finishes in level 2Details
replace 4 front windows with aluminum-clad wood windows (2 french casement, 1 hopper, and 1 fixed); replace front door with wood door. replace 3 interior doors & update electrical to kitchen, bath & office. kitchen & bath remodel. replace all cabinets, counter, appliances & finishes in level 2 | $38,500 |
| Feb 23, 2016 | Expired or cancelled cancelled Nov 2016 | 74 Brady St | unit #5 replace stone counters in kitchen & replace ktchen backsplash tile with stone.Details
unit #5 replace stone counters in kitchen & replace ktchen backsplash tile with stone. | $3,600 |
| Dec 21, 2015 | Completed final sign-off Dec 2016 | 3747 Divisadero St | full remodel to kitchen & (3) bathrooms, all fixtures, walls & appliances stay in (e) positions; replace hardwood flooring throughout home wiht 3/4" white oak. compliance with maher ordinance no 155-13 not required.Details
full remodel to kitchen & (3) bathrooms, all fixtures, walls & appliances stay in (e) positions; replace hardwood flooring throughout home wiht 3/4" white oak. compliance with maher ordinance no 155-13 not required. | $127,500 |
| Sep 8, 2015 | Completed final sign-off Oct 2015 | 565 Banks St | replace bathroom skylight (30"x30") & install new skylight in kitchen (20"x40"), openings remain the same.Details
replace bathroom skylight (30"x30") & install new skylight in kitchen (20"x40"), openings remain the same. | $3,200 |
| May 20, 2015 | Completed final sign-off Jul 2016 | 931 Silver Av | legalize existing unauthorized dwelling unit under ordance #43-14. relocate ground fl kitchen, bath and level the floors, upgrade electrical service & branch wiring, upgrade furnace, water heater & fire separations.Details
legalize existing unauthorized dwelling unit under ordance #43-14. relocate ground fl kitchen, bath and level the floors, upgrade electrical service & branch wiring, upgrade furnace, water heater & fire separations. | $100,000 |
| May 11, 2015 | Completed final sign-off Sep 2015 | 2080 03rd St | unit 6: remodel kitchen & bath. new 12"x12" stone floor tiles to foyer & bathro, & new shower pan & 3x6 subway tile wall surround in shower. in kitchen, r&r cabinets, tile, & counters - all fixture stay in (e) locations. isntall new 96"w x 24"d x 84"h pantry cab east wall kitchenDetails
unit 6: remodel kitchen & bath. new 12"x12" stone floor tiles to foyer & bathro, & new shower pan & 3x6 subway tile wall surround in shower. in kitchen, r&r cabinets, tile, & counters - all fixture stay in (e) locations. isntall new 96"w x 24"d x 84"h pantry cab east wall kitchen | $48,500 |
| Mar 23, 2015 | Completed final sign-off Jun 2015 | 2336 North Point St | kitchen remodel - new cabinets, counter, tiles, trim, appliances and plumbing and electrical fixtures. n/a maher ord. # 155-13Details
kitchen remodel - new cabinets, counter, tiles, trim, appliances and plumbing and electrical fixtures. n/a maher ord. # 155-13 | $28,400 |
| Dec 5, 2013 | Completed final sign-off Apr 2014 | 30 Molimo Dr | remodel kitchen, replace range hood, 2 bathrooms, 2 bath exhaust, leavin gall (e) locations as-is including (n) appliances, floor & wall tile, cabinets, counters, trim & fixtures. lower floor install (n) radian floor heating & (n) engineered maple hardwood flooring. led cans in kitchens/baths, &Details
remodel kitchen, replace range hood, 2 bathrooms, 2 bath exhaust, leavin gall (e) locations as-is including (n) appliances, floor & wall tile, cabinets, counters, trim & fixtures. lower floor install (n) radian floor heating & (n) engineered maple hardwood flooring. led cans in kitchens/baths, & | $29,000 |
| Aug 5, 2013 | Completed final sign-off Oct 2013 | 565 Banks St | remodel bath with new tub/shower, toilet, vanity, remodel kitchen, new cabinets,counter fixtures & appliances, install new hardwood floors throughout all 900 sq ft. 5'x6 "8" 11'0 x 9 "0"Details
remodel bath with new tub/shower, toilet, vanity, remodel kitchen, new cabinets,counter fixtures & appliances, install new hardwood floors throughout all 900 sq ft. 5'x6 "8" 11'0 x 9 "0" | $23,700 |
| Dec 10, 2012 | Completed final sign-off Feb 2013 | 73 Littlefield Tr | kitchen remodel: remove 2x4 wall separating kitchen and dining area leaving structural post and beam as is. install new cabinets, appliances, counters, flooring and plumbing and electrical fixtures per plan. repair bamboo flooring to match (e). replace front kitchen window not visible from st.Details
kitchen remodel: remove 2x4 wall separating kitchen and dining area leaving structural post and beam as is. install new cabinets, appliances, counters, flooring and plumbing and electrical fixtures per plan. repair bamboo flooring to match (e). replace front kitchen window not visible from st. | $6,500 |
| Sep 20, 2012 | Completed final sign-off Nov 2012 | 850 Portola Dr | rewire lower floor & den. replace exterior garage side door, garage window & kitchen window, remodel lower bathroom - replace floor & wall tiles, fixtures, vanity, install fan. replace base & crown moulding, prep & paint lr, dr, kitchen, hall, stairway & den. window and door not visible from street.Details
rewire lower floor & den. replace exterior garage side door, garage window & kitchen window, remodel lower bathroom - replace floor & wall tiles, fixtures, vanity, install fan. replace base & crown moulding, prep & paint lr, dr, kitchen, hall, stairway & den. window and door not visible from street. | $10,850 |
| Aug 28, 2008 | Completed final sign-off Oct 2008 | 71 Whitney St | setup scaffold on front & back of home to allow for exterior painting & minor repair. on back replace 3 total windows & 1 door to match. 2 windows are wood marvin double hung & 1 kitchen windows is white vinyl 24" x 36" greenhouse type. replace 60% of back 1 x 10 lap siding & all rotting trim,Details
setup scaffold on front & back of home to allow for exterior painting & minor repair. on back replace 3 total windows & 1 door to match. 2 windows are wood marvin double hung & 1 kitchen windows is white vinyl 24" x 36" greenhouse type. replace 60% of back 1 x 10 lap siding & all rotting trim, | $15,000 |