Back to bathroom remodel contractors
Takoma Carpentry & Remodeling
- Based in
- San Francisco
- On San Francisco permits
- Jan 2004 to Jul 2020
- Last 24 months
- 0 permits filed
49 permits since 2000: 44 completed, 2 never finaled, 3 expired or cancelled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
14 bathroom remodel permits: 13 completed, 1 expired or cancelled. Typically 0 days from filing to permit and 132 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 8, 2020 | Expired or cancelled expired Nov 2024 | 332 Gambier St | comply partial nov 2020032301 by remove temporary rear 4ft x 8 ft bathroom structure to comply with violation.Details
comply partial nov 2020032301 by remove temporary rear 4ft x 8 ft bathroom structure to comply with violation. | $500 |
| May 23, 2019 | Completed final sign-off Dec 2019 | 442 Los Palmos Dr | 2nd flr - kitchen remodel in-kind replacement same quality as (e) addition of half bath, replace (e) window header beamDetails
2nd flr - kitchen remodel in-kind replacement same quality as (e) addition of half bath, replace (e) window header beam | $15,000 |
| Oct 4, 2017 | Completed final sign-off Jul 2018 | 27 Los Palmos Dr | replace 4 front windows with aluminum-clad wood windows (2 french casement, 1 hopper, and 1 fixed); replace front door with wood door. replace 3 interior doors & update electrical to kitchen, bath & office. kitchen & bath remodel. replace all cabinets, counter, appliances & finishes in level 2Details
replace 4 front windows with aluminum-clad wood windows (2 french casement, 1 hopper, and 1 fixed); replace front door with wood door. replace 3 interior doors & update electrical to kitchen, bath & office. kitchen & bath remodel. replace all cabinets, counter, appliances & finishes in level 2 | $38,500 |
| Dec 21, 2015 | Completed final sign-off Dec 2016 | 3747 Divisadero St | full remodel to kitchen & (3) bathrooms, all fixtures, walls & appliances stay in (e) positions; replace hardwood flooring throughout home wiht 3/4" white oak. compliance with maher ordinance no 155-13 not required.Details
full remodel to kitchen & (3) bathrooms, all fixtures, walls & appliances stay in (e) positions; replace hardwood flooring throughout home wiht 3/4" white oak. compliance with maher ordinance no 155-13 not required. | $127,500 |
| Nov 23, 2015 | Completed final sign-off Jul 2016 | 931 Silver Av | revision to pa#201505206839 basement renovation, revision includes relocate (2) furnaces to (n) furnace closet, change bathroom layout & relocate closet location.Details
revision to pa#201505206839 basement renovation, revision includes relocate (2) furnaces to (n) furnace closet, change bathroom layout & relocate closet location. | $3,500 |
| Sep 8, 2015 | Completed final sign-off Oct 2015 | 565 Banks St | replace bathroom skylight (30"x30") & install new skylight in kitchen (20"x40"), openings remain the same.Details
replace bathroom skylight (30"x30") & install new skylight in kitchen (20"x40"), openings remain the same. | $3,200 |
| May 20, 2015 | Completed final sign-off Jul 2016 | 931 Silver Av | legalize existing unauthorized dwelling unit under ordance #43-14. relocate ground fl kitchen, bath and level the floors, upgrade electrical service & branch wiring, upgrade furnace, water heater & fire separations.Details
legalize existing unauthorized dwelling unit under ordance #43-14. relocate ground fl kitchen, bath and level the floors, upgrade electrical service & branch wiring, upgrade furnace, water heater & fire separations. | $100,000 |
| May 11, 2015 | Completed final sign-off Sep 2015 | 2080 03rd St | unit 6: remodel kitchen & bath. new 12"x12" stone floor tiles to foyer & bathro, & new shower pan & 3x6 subway tile wall surround in shower. in kitchen, r&r cabinets, tile, & counters - all fixture stay in (e) locations. isntall new 96"w x 24"d x 84"h pantry cab east wall kitchenDetails
unit 6: remodel kitchen & bath. new 12"x12" stone floor tiles to foyer & bathro, & new shower pan & 3x6 subway tile wall surround in shower. in kitchen, r&r cabinets, tile, & counters - all fixture stay in (e) locations. isntall new 96"w x 24"d x 84"h pantry cab east wall kitchen | $48,500 |
| Apr 14, 2014 | Completed final sign-off Jul 2014 | 630 Castro St | apt 3: bath remodel, r&r shower, toilet & sink/vanity with new, install new tile to floors & shower walls, lighting & control per cec 150(k)Details
apt 3: bath remodel, r&r shower, toilet & sink/vanity with new, install new tile to floors & shower walls, lighting & control per cec 150(k) | $8,800 |
| Mar 24, 2014 | Completed final sign-off Aug 2014 | 630 Castro St | comply with physical report cc 7494 and in apt 1 frame new interior staircase between levels 1 and 2. remodel level 2 bath and w/d area on level 1. new partition walls for den and bedroom, new interior base, door and window trim throughout, new heating system apt 1. unit 3 clothes dryer to beDetails
comply with physical report cc 7494 and in apt 1 frame new interior staircase between levels 1 and 2. remodel level 2 bath and w/d area on level 1. new partition walls for den and bedroom, new interior base, door and window trim throughout, new heating system apt 1. unit 3 clothes dryer to be | $42,800 |
| Dec 5, 2013 | Completed final sign-off Apr 2014 | 30 Molimo Dr | remodel kitchen, replace range hood, 2 bathrooms, 2 bath exhaust, leavin gall (e) locations as-is including (n) appliances, floor & wall tile, cabinets, counters, trim & fixtures. lower floor install (n) radian floor heating & (n) engineered maple hardwood flooring. led cans in kitchens/baths, &Details
remodel kitchen, replace range hood, 2 bathrooms, 2 bath exhaust, leavin gall (e) locations as-is including (n) appliances, floor & wall tile, cabinets, counters, trim & fixtures. lower floor install (n) radian floor heating & (n) engineered maple hardwood flooring. led cans in kitchens/baths, & | $29,000 |
| Aug 5, 2013 | Completed final sign-off Oct 2013 | 565 Banks St | remodel bath with new tub/shower, toilet, vanity, remodel kitchen, new cabinets,counter fixtures & appliances, install new hardwood floors throughout all 900 sq ft. 5'x6 "8" 11'0 x 9 "0"Details
remodel bath with new tub/shower, toilet, vanity, remodel kitchen, new cabinets,counter fixtures & appliances, install new hardwood floors throughout all 900 sq ft. 5'x6 "8" 11'0 x 9 "0" | $23,700 |
| Mar 1, 2013 | Completed final sign-off Jul 2013 | 3450 03rd St | #4b:build an approx. 40' 0" linear foot 2x4 partition wall along extg 6x6 support posts. move extg bath sink per proposed plan and install cabinets along bath wall. add electrical subpanel and elect. outlets to warehouse.Details
#4b:build an approx. 40' 0" linear foot 2x4 partition wall along extg 6x6 support posts. move extg bath sink per proposed plan and install cabinets along bath wall. add electrical subpanel and elect. outlets to warehouse. | $3,000 |
| Sep 20, 2012 | Completed final sign-off Nov 2012 | 850 Portola Dr | rewire lower floor & den. replace exterior garage side door, garage window & kitchen window, remodel lower bathroom - replace floor & wall tiles, fixtures, vanity, install fan. replace base & crown moulding, prep & paint lr, dr, kitchen, hall, stairway & den. window and door not visible from street.Details
rewire lower floor & den. replace exterior garage side door, garage window & kitchen window, remodel lower bathroom - replace floor & wall tiles, fixtures, vanity, install fan. replace base & crown moulding, prep & paint lr, dr, kitchen, hall, stairway & den. window and door not visible from street. | $10,850 |