Back to kitchen remodel contractors
Taico Construction Co
- Based in
- San Francisco
- On San Francisco permits
- Sep 2006 to Aug 2016
- Last 24 months
- 0 permits filed
19 permits since 2000: 18 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
6 kitchen remodel permits: 6 completed. Typically 0 days from filing to permit and 80 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 22, 2016 | Completed final sign-off Oct 2016 | 41 Guerrero St | unit 41a - remodel exisitng 1 bathroom & 1 kitchen. in bathroom: replace existing tub, vanity, sink, & tile. sink, tub & vanity to remain in current locations. in kitchen: install new appliances in exisitng locations, new floor tile, sink, frig, & countertop. existing stove & hood to remain.Details
unit 41a - remodel exisitng 1 bathroom & 1 kitchen. in bathroom: replace existing tub, vanity, sink, & tile. sink, tub & vanity to remain in current locations. in kitchen: install new appliances in exisitng locations, new floor tile, sink, frig, & countertop. existing stove & hood to remain. | $20,000 |
| Dec 11, 2012 | Completed final sign-off Aug 2013 | 266 Ralston St | revision to pa#2010-0210-6334 to remove non-load bearing wall partitions. relocation of kitchen. correction of bath tub to (e) shower on 2nd fl.Details
revision to pa#2010-0210-6334 to remove non-load bearing wall partitions. relocation of kitchen. correction of bath tub to (e) shower on 2nd fl. | $2,500 |
| Sep 26, 2011 | Completed final sign-off Dec 2011 | 2776 36th Av | remodel (1) kitchen. no change on walls and opening.Details
remodel (1) kitchen. no change on walls and opening. | $6,000 |
| Apr 15, 2011 | Completed final sign-off Jun 2011 | 254 Pope St | remodel the kitchen. new electrical, plumbing for kitchen. new electrical service and panel. all (n) lighting must comply with cec 150(k).Details
remodel the kitchen. new electrical, plumbing for kitchen. new electrical service and panel. all (n) lighting must comply with cec 150(k). | $8,000 |
| Mar 23, 2011 | Completed final sign-off May 2011 | 1279 08th Av | #106- remodel kitchen, new electrical, plumbing and sheetrock for kitchenDetails
#106- remodel kitchen, new electrical, plumbing and sheetrock for kitchen | $10,000 |
| Jan 25, 2008 | Completed final sign-off Jun 2008 | 54 Surrey St | remodel kitchen, bathroom and laundry area. all work is on 2nd flr. no structural work under this permit. replace 1 (e) window in kitchen & 1 in bathroom.Details
remodel kitchen, bathroom and laundry area. all work is on 2nd flr. no structural work under this permit. replace 1 (e) window in kitchen & 1 in bathroom. | $20,000 |