Taico Construction Co
- Based in
- San Francisco
- On San Francisco permits
- Sep 2006 to Aug 2016
- Last 24 months
- 0 permits filed
19 permits since 2000: 18 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 15, 2016 | Completed final sign-off Oct 2016 | 37 Guerrero St | address correction from 41 guerrero st. to 37a guerrero st. administrative permit only. amendment to bldng. applic. #201607223091.Details
address correction from 41 guerrero st. to 37a guerrero st. administrative permit only. amendment to bldng. applic. #201607223091. | |
| Jul 22, 2016 | Completed final sign-off Oct 2016 | 41 Guerrero St | unit 41a - remodel exisitng 1 bathroom & 1 kitchen. in bathroom: replace existing tub, vanity, sink, & tile. sink, tub & vanity to remain in current locations. in kitchen: install new appliances in exisitng locations, new floor tile, sink, frig, & countertop. existing stove & hood to remain.Details
unit 41a - remodel exisitng 1 bathroom & 1 kitchen. in bathroom: replace existing tub, vanity, sink, & tile. sink, tub & vanity to remain in current locations. in kitchen: install new appliances in exisitng locations, new floor tile, sink, frig, & countertop. existing stove & hood to remain. | $20,000 |
| Apr 3, 2013 | Never finaled issued Apr 2013, no final | 75 Waterloo St | erect security fence around (e) vacant lot. lot to include placement of temporary storage container for equipment, office trailor (mobile) with security lighting. weigh scale canopy & portable toiletDetails
erect security fence around (e) vacant lot. lot to include placement of temporary storage container for equipment, office trailor (mobile) with security lighting. weigh scale canopy & portable toilet | $16,000 |
| Feb 28, 2013 | Completed final sign-off Jan 2014 | 3519 Balboa St | provide barrier removal by unisex restroom, cashier counter & door opener. remove portion of wall for seating. provide lighting & heating. relocate prep sink & coffee marker, add water heater.Details
provide barrier removal by unisex restroom, cashier counter & door opener. remove portion of wall for seating. provide lighting & heating. relocate prep sink & coffee marker, add water heater. | $52,000 |
| Feb 26, 2013 | Completed final sign-off Jul 2013 | 2259 18th Av | add new deck at the back of existing house, add bathroom & rooms at ground floor as per plan.Details
add new deck at the back of existing house, add bathroom & rooms at ground floor as per plan. | $25,000 |
| Dec 11, 2012 | Completed final sign-off Aug 2013 | 266 Ralston St | revision to pa#2010-0210-6334 to remove non-load bearing wall partitions. relocation of kitchen. correction of bath tub to (e) shower on 2nd fl.Details
revision to pa#2010-0210-6334 to remove non-load bearing wall partitions. relocation of kitchen. correction of bath tub to (e) shower on 2nd fl. | $2,500 |
| Oct 11, 2012 | Completed final sign-off Sep 2013 | 1546 42nd Av | work @ ground floor - relocate existing half bathroom & add shower, change use of one room to bedroom, add one family room.Details
work @ ground floor - relocate existing half bathroom & add shower, change use of one room to bedroom, add one family room. | $10,000 |
| Sep 5, 2012 | Completed final sign-off Dec 2012 | 1979 32nd Av | revision to 201205251309. 2nd floor add half bath. gr floor remove all non warranted rooms. add bedroom, full bath, office and storage room. install sliding door in office and egress window in bedroom. replace furnce and water heater. install lighting, switches, receptacles in the new roomsDetails
revision to 201205251309. 2nd floor add half bath. gr floor remove all non warranted rooms. add bedroom, full bath, office and storage room. install sliding door in office and egress window in bedroom. replace furnce and water heater. install lighting, switches, receptacles in the new rooms | $15,000 |
| Mar 14, 2012 | Completed final sign-off Aug 2012 | 366 Pope St | to add rooms at the ground floor: 2 bedrooms, laundry rooms, storage room, and bath room.Details
to add rooms at the ground floor: 2 bedrooms, laundry rooms, storage room, and bath room. | $32,000 |
| Oct 24, 2011 | Completed final sign-off Dec 2011 | 1770 30th Av | change 6 windows @ rear, not visable from street, max u fcator 0.4Details
change 6 windows @ rear, not visable from street, max u fcator 0.4 | $800 |
| Sep 26, 2011 | Completed final sign-off Dec 2011 | 2776 36th Av | remodel (1) kitchen. no change on walls and opening.Details
remodel (1) kitchen. no change on walls and opening. | $6,000 |
| Jul 8, 2011 | Completed final sign-off Aug 2011 | 2 Brentwood Av | replacing (5) windows to be same size and location. replace aluminum windows w/ fiberglass windowsDetails
replacing (5) windows to be same size and location. replace aluminum windows w/ fiberglass windows | $4,500 |
| Apr 15, 2011 | Completed final sign-off Jun 2011 | 254 Pope St | remodel the kitchen. new electrical, plumbing for kitchen. new electrical service and panel. all (n) lighting must comply with cec 150(k).Details
remodel the kitchen. new electrical, plumbing for kitchen. new electrical service and panel. all (n) lighting must comply with cec 150(k). | $8,000 |
| Apr 7, 2011 | Completed final sign-off Apr 2011 | 877 Darien Wy | change one window, visible from the street. wood window to match photo. same size - u factor is 0.40 max.Details
change one window, visible from the street. wood window to match photo. same size - u factor is 0.40 max. | $800 |
| Mar 23, 2011 | Completed final sign-off May 2011 | 1279 08th Av | #106- remodel kitchen, new electrical, plumbing and sheetrock for kitchenDetails
#106- remodel kitchen, new electrical, plumbing and sheetrock for kitchen | $10,000 |
| Dec 14, 2010 | Completed final sign-off Nov 2011 | 2214 38th Av | remove interior stairs & add bath (#2) @ 2nd floor. add family room, bath (#3), bedroom & install new windows @ ground floor. replace furnace & upgrade all mechanical piping & ductwork. install lighting, switches, & receptacles in the new rooms.Details
remove interior stairs & add bath (#2) @ 2nd floor. add family room, bath (#3), bedroom & install new windows @ ground floor. replace furnace & upgrade all mechanical piping & ductwork. install lighting, switches, & receptacles in the new rooms. | $40,000 |
| Jan 25, 2008 | Completed final sign-off Jun 2008 | 54 Surrey St | remodel kitchen, bathroom and laundry area. all work is on 2nd flr. no structural work under this permit. replace 1 (e) window in kitchen & 1 in bathroom.Details
remodel kitchen, bathroom and laundry area. all work is on 2nd flr. no structural work under this permit. replace 1 (e) window in kitchen & 1 in bathroom. | $20,000 |
| Jun 26, 2007 | Completed final sign-off Oct 2007 | 5243 Mission St | remodel existing store to retail officeDetails
remodel existing store to retail office | $12,000 |
| Sep 12, 2006 | Completed final sign-off Aug 2007 | 432 Oxford St | add rooms at groundfloor, convert (e) closet to a (n) full bath and add a new closetDetails
add rooms at groundfloor, convert (e) closet to a (n) full bath and add a new closet | $25,000 |