Back to kitchen remodel contractors
Tai Lam Mak
- Based in
- Millbrae
- On San Francisco permits
- May 2000 to May 2026
- Last 24 months
- 2 permits filed
68 permits since 2000: 55 completed, 1 in progress, 6 never finaled, 6 expired or cancelled.
Of the 6 never-finaled permits, 1 is 3 to 5 years old, 3 are 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
15 kitchen remodel permits: 13 completed, 2 never finaled. Typically 0 days from filing to permit and 214 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 28, 2024 | Completed final sign-off Jan 2025 | 1471 Silver Av | relocate kitchen. convert (e) kitchen area to a new bedroom. convert one bathroom to two bathrooms. add a media room. two bedrooms, a bathroom, a wetbar. relocate rear stair on the 1st floor.Details
relocate kitchen. convert (e) kitchen area to a new bedroom. convert one bathroom to two bathrooms. add a media room. two bedrooms, a bathroom, a wetbar. relocate rear stair on the 1st floor. | $100,000 |
| Sep 27, 2022 | Completed final sign-off Sep 2023 | 7 Hollywood Ct | relocate kitchen to dining room, convert kitchen area to play room at 2/f, add family room, media room, study, storage, & full bath on 1/f, remove light court stairsDetails
relocate kitchen to dining room, convert kitchen area to play room at 2/f, add family room, media room, study, storage, & full bath on 1/f, remove light court stairs | $70,000 |
| May 2, 2022 | Completed final sign-off Jan 2023 | 727 Chestnut St | unit 727 & 731a chestnut st only: remodel kitchens & bathrooms, pianting, refinish (e) wood floor. no structural changes. to comply with complaint 202290308.Details
unit 727 & 731a chestnut st only: remodel kitchens & bathrooms, pianting, refinish (e) wood floor. no structural changes. to comply with complaint 202290308. | $60,000 |
| Nov 16, 2020 | Completed final sign-off Jun 2022 | 1562 22nd Av | relocate kitchen and add an office on the 1/f. add a full bathroom on the 2/f.Details
relocate kitchen and add an office on the 1/f. add a full bathroom on the 2/f. | $30,000 |
| Feb 24, 2020 | Never finaled issued Jul 2020, no final | 1315 Jackson St | unit #4, 3rd fl - remodel/relocate (e) kitchen; remodel bathroom; modify (e) dining to new bedroom & bedroom to living; new bathDetails
unit #4, 3rd fl - remodel/relocate (e) kitchen; remodel bathroom; modify (e) dining to new bedroom & bedroom to living; new bath | $50,000 |
| Oct 4, 2012 | Completed final sign-off Jul 2013 | 717 Guerrero St | interior renovation. remodel (e) kitchen, open kitchen to dining room, remove pantry, create (n) bathroom from (e) closet and hallway, new shearwall and footing at first storyDetails
interior renovation. remodel (e) kitchen, open kitchen to dining room, remove pantry, create (n) bathroom from (e) closet and hallway, new shearwall and footing at first story | $25,000 |
| Apr 3, 2007 | Completed final sign-off Jun 2007 | 157 Berkeley Wy | remodel kitchen cabinet on 2nd floor. no lighting change.Details
remodel kitchen cabinet on 2nd floor. no lighting change. | $8,500 |
| Aug 22, 2005 | Completed final sign-off Mar 2006 | 170 Pacific Av | (e)kitchen & bathroom replacement.no structural work,provide fluorcesant light fixture.Details
(e)kitchen & bathroom replacement.no structural work,provide fluorcesant light fixture. | $12,500 |
| Nov 29, 2004 | Completed final sign-off Jul 2005 | 1586 17th Av | remodel kitchen (replace cabinets) @ 2nd floor.Details
remodel kitchen (replace cabinets) @ 2nd floor. | $6,000 |
| Sep 26, 2003 | Completed final sign-off Feb 2004 | 550 Stockton St | remodeling kitchen change cabinet & tile.Details
remodeling kitchen change cabinet & tile. | $4,000 |
| Apr 3, 2003 | Never finaled issued Apr 2003, no final | 423 Kirkham St | remodel kitchen, change cabinet,remodel bathrm, change bathtub toilet,vanity tile,same locationDetails
remodel kitchen, change cabinet,remodel bathrm, change bathtub toilet,vanity tile,same location | $9,000 |
| Oct 23, 2000 | Completed final sign-off Apr 2001 | 10 Dawnview Wy | remodel kitchen change cabinetsDetails
remodel kitchen change cabinets | $9,000 |
| Oct 3, 2000 | Completed final sign-off Mar 2001 | 714 16th Av | remove kitchen & replace existing window, in rear 2 bedroomsDetails
remove kitchen & replace existing window, in rear 2 bedrooms | $24,000 |
| Sep 11, 2000 | Completed final sign-off Dec 2000 | 3832 Moraga St | remodel kitchen & change cabinetsDetails
remodel kitchen & change cabinets | $8,000 |
| Aug 21, 2000 | Completed final sign-off Jan 2001 | 3194 San Jose Av | remodel kitchen & bathroom, replace cabinet, sink, bathtub,toilet, sheetrock,repalce 7 windows @bacDetails
remodel kitchen & bathroom, replace cabinet, sink, bathtub,toilet, sheetrock,repalce 7 windows @bac | $11,000 |