T N T Construction
- Based in
- San Francisco
- On San Francisco permits
- Feb 2007 to Aug 2019
- Last 24 months
- 0 permits filed
26 permits since 2000: 21 completed, 4 never finaled, 1 expired or cancelled.
Of the 4 never-finaled permits, 1 is 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
4 stairs permits: 1 completed, 3 never finaled. Typically 4 days from filing to permit and 32 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 6, 2018 | Never finaled issued Mar 2018, no final | 755 Anderson St | repair front stair: replace existing treads, risers, entry door, & handrail in-kind/ to match existing. repair in-kind less than 50%Details
repair front stair: replace existing treads, risers, entry door, & handrail in-kind/ to match existing. repair in-kind less than 50% | $10,000 |
| Jul 2, 2012 | Never finaled issued Jul 2012, no final | 222 Montcalm St | revision to appl #2011.08.04.1769 - addition will not be constructed, horizontal extension reduced to new stair landing.Details
revision to appl #2011.08.04.1769 - addition will not be constructed, horizontal extension reduced to new stair landing. | |
| Aug 4, 2011 | Never finaled issued Jan 2012, no final | 222 Montcalm St | general remodel, horizontal addition @ west side. add bathroom at lower level provide improved stair to downstairs, improve undeveloped habitable space on downstairs.Details
general remodel, horizontal addition @ west side. add bathroom at lower level provide improved stair to downstairs, improve undeveloped habitable space on downstairs. | $150,000 |
| Jul 26, 2010 | Completed final sign-off Aug 2010 | 478 Gates St | repair entry stairs front of building street level less than 50%; repair in kind, no structural changesDetails
repair entry stairs front of building street level less than 50%; repair in kind, no structural changes | $2,000 |