Back to bathroom remodel contractors
T N T Construction
- Based in
- San Francisco
- On San Francisco permits
- Feb 2007 to Aug 2019
- Last 24 months
- 0 permits filed
26 permits since 2000: 21 completed, 4 never finaled, 1 expired or cancelled.
Of the 4 never-finaled permits, 1 is 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
12 bathroom remodel permits: 11 completed, 1 never finaled. Typically 10 days from filing to permit and 196 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 5, 2019 | Completed final sign-off Nov 2019 | 37 West Clay St | kitchen remodel. bathroom floor replacementtile to wood. replace 1st flr window with insulated glass - not visibleDetails
kitchen remodel. bathroom floor replacementtile to wood. replace 1st flr window with insulated glass - not visible | $80,000 |
| Jan 15, 2019 | Completed final sign-off May 2019 | 572 04th Av | install full bathroom in ground floor level,in (e)conditioned space. install new bar sink,under counter refrigarator and cabinetry in existing ground floor music room.install new flooring in (e)ground floor music room, office and hallway.replace (e)concrete slab in area of bathroom.Details
install full bathroom in ground floor level,in (e)conditioned space. install new bar sink,under counter refrigarator and cabinetry in existing ground floor music room.install new flooring in (e)ground floor music room, office and hallway.replace (e)concrete slab in area of bathroom. | $30,000 |
| Jul 20, 2018 | Completed final sign-off Feb 2022 | 31 Carver St | vertical addition. new skylights in bath on ground floor. 2 shed roof dormers at 2nd level. addition of one new bathroom at 2nd level. new doors, window and skylights at upper level.Details
vertical addition. new skylights in bath on ground floor. 2 shed roof dormers at 2nd level. addition of one new bathroom at 2nd level. new doors, window and skylights at upper level. | $35,000 |
| Jun 8, 2018 | Completed final sign-off Jan 2019 | 547 Wisconsin St | interior remodel of (e) kitchen, hall bath, master bathroom, new fixtures & finishes; replacement of (e) sliding door, interior doors as noted in planDetails
interior remodel of (e) kitchen, hall bath, master bathroom, new fixtures & finishes; replacement of (e) sliding door, interior doors as noted in plan | $75,000 |
| Mar 11, 2016 | Completed final sign-off Sep 2016 | 156 06th Av | replace (e) electrical & plumbing fixts to second floor bathroom. no build-out, same footprint. new tile for floor & walls including shower walls.Details
replace (e) electrical & plumbing fixts to second floor bathroom. no build-out, same footprint. new tile for floor & walls including shower walls. | $37,000 |
| Nov 24, 2015 | Completed final sign-off Apr 2019 | 762 29th Av | interior remodel of 794 sq ft. remodel kitchen & bathroom. add lavatory sink to (e) water closet. convert 354 sq ft of garage space to living space. (n) bathroom. infill (e) non-shared lightwell on northside. infill (e) non-shared lightwell on southside.Details
interior remodel of 794 sq ft. remodel kitchen & bathroom. add lavatory sink to (e) water closet. convert 354 sq ft of garage space to living space. (n) bathroom. infill (e) non-shared lightwell on northside. infill (e) non-shared lightwell on southside. | $225,000 |
| Dec 28, 2012 | Completed final sign-off Mar 2014 | 320 Surrey St | remodel of (e) kitchen including 149 sq ft addition. remodel of (e) bath. remodel of (e) water closet at basement. (n) clad windows & door at north & east addition facades. (n) high efficiency furnace.Details
remodel of (e) kitchen including 149 sq ft addition. remodel of (e) bath. remodel of (e) water closet at basement. (n) clad windows & door at north & east addition facades. (n) high efficiency furnace. | $92,000 |
| Feb 3, 2012 | Completed final sign-off Jun 2012 | 3036 Market St | remodel existing bath, kitchen, and closets. 3 new wood clad windows at rear. replace existing exterior door with new clad wd unit. repalce existing wd sashes at 3 windows at rear, 1 sash per window only. new gas fired furnace with new distribution as requiredDetails
remodel existing bath, kitchen, and closets. 3 new wood clad windows at rear. replace existing exterior door with new clad wd unit. repalce existing wd sashes at 3 windows at rear, 1 sash per window only. new gas fired furnace with new distribution as required | $60,000 |
| Aug 4, 2011 | Never finaled issued Jan 2012, no final | 222 Montcalm St | general remodel, horizontal addition @ west side. add bathroom at lower level provide improved stair to downstairs, improve undeveloped habitable space on downstairs.Details
general remodel, horizontal addition @ west side. add bathroom at lower level provide improved stair to downstairs, improve undeveloped habitable space on downstairs. | $150,000 |
| Oct 15, 2010 | Completed final sign-off Mar 2011 | 2953 Pacific Av | remodel bathroom, new finishes, tile, paint fixtures, in same location, new paint on master bedroom, one bathroom remodel @ grnd floor, new lightingDetails
remodel bathroom, new finishes, tile, paint fixtures, in same location, new paint on master bedroom, one bathroom remodel @ grnd floor, new lighting | $65,000 |
| Apr 22, 2009 | Completed final sign-off Sep 2009 | 16 Richland Av | remodel (e) ktichen & bathroom, replace (e) windows with same size & location. reframe 1 window, add 1 skylight. replace all flooring, replace (e) furnace.Details
remodel (e) ktichen & bathroom, replace (e) windows with same size & location. reframe 1 window, add 1 skylight. replace all flooring, replace (e) furnace. | $50,000 |
| Mar 16, 2007 | Completed final sign-off Oct 2008 | 572 04th Av | addition to 1st & 2nd floors. new wood deck to rear of building. remodel kitchen. add 1/2 bath in (e) interior space, 2nd floor. remodel 3rd floor bath.Details
addition to 1st & 2nd floors. new wood deck to rear of building. remodel kitchen. add 1/2 bath in (e) interior space, 2nd floor. remodel 3rd floor bath. | $225,000 |