T L Oliver Construction

Contractor license
648370
State license record
Based in
Castro Valley
On San Francisco permits
Oct 2006 to Oct 2006
Last 24 months
0 permits filed

1 permit since 2000: 1 completed.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywide

Each point is the quarter the permits were filed, for roof deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.

Roof deck permits

AllRoof deck 1

1 roof deck permit: 1 completed. Typically 0 days from filing to permit and 440 days from permit to final inspection.

FiledOutcomeAddressWork described on the permitDeclared cost
Oct 20, 2006Completed
final sign-off Jan 2008
2880 Green Strepair of an existing fountain & re coat roof membrane of (e) 442 sqft. roof deck. repair minor dryrot as neeeded. replace existing tile with same . no alteration of (e) structure. replace (e) dry rotted joist in kind.
Details
Permit
200610205619
Status
complete
Filed
Oct 20, 2006
Permit issued
Oct 20, 2006
Final sign-off
Jan 3, 2008
Declared cost
$60,000
Address
2880 Green St

repair of an existing fountain & re coat roof membrane of (e) 442 sqft. roof deck. repair minor dryrot as neeeded. replace existing tile with same . no alteration of (e) structure. replace (e) dry rotted joist in kind.

Open the permit page

$60,000