Permit GraphShortlistSan Francisco building permits since 2000

Block 0949, lot 011A

2880 Green St

City’s use
Single Family Residential
Built
1917
Stories
4
Units
1
Rooms
5 bedrooms, 5 bathrooms
Building
5,832 sq ft
Lot
3,680 sq ft
Zoning
RH1
Construction type
D

From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map

Permits filed here

4 permits filed for this property since 2000.

CompletedIn progressNever finaledExpired or cancelled
FiledOutcomeAddressContractorWork described on the permitDeclared cost
May 21, 2025Completed
final sign-off Jun 2026
2880 Green StCairn Constructionrevision to pa# 202406043691: 1/f-remove non structural interior walls at laundry room. revise electrical as needed. move (e) door and sidelights to enclose covered patio. 2/f-(n) outswing door. replace (e) cracked stucco in kind. remove/replace kitchen/dining room corner cabinetry and nonstructural
Details
Permit
202505216999
Permit issued
Jun 25, 2025
Final sign-off
Jun 26, 2026

revision to pa# 202406043691: 1/f-remove non structural interior walls at laundry room. revise electrical as needed. move (e) door and sidelights to enclose covered patio. 2/f-(n) outswing door. replace (e) cracked stucco in kind. remove/replace kitchen/dining room corner cabinetry and nonstructural

Open the permit page

$20,000
Jun 4, 2024Completed
final sign-off Jun 2026
2880 Green StCairn Construction2nd fl: add (n) bifold door system, (n) counter top & awning window. (n) bbq area, remove sunroom & trellis. replace deck railing. plumbing work includes (n) gas connection for bbq but no (n) plumbing fixtures
Details
Permit
202406043691
Permit issued
Aug 23, 2024
Final sign-off
Jun 26, 2026

2nd fl: add (n) bifold door system, (n) counter top & awning window. (n) bbq area, remove sunroom & trellis. replace deck railing. plumbing work includes (n) gas connection for bbq but no (n) plumbing fixtures

Open the permit page

$85,000
Oct 20, 2006Completed
final sign-off Jan 2008
2880 Green StT L Oliver Constructionrepair of an existing fountain & re coat roof membrane of (e) 442 sqft. roof deck. repair minor dryrot as neeeded. replace existing tile with same . no alteration of (e) structure. replace (e) dry rotted joist in kind.
Details
Permit
200610205619
Permit issued
Oct 20, 2006
Final sign-off
Jan 3, 2008

repair of an existing fountain & re coat roof membrane of (e) 442 sqft. roof deck. repair minor dryrot as neeeded. replace existing tile with same . no alteration of (e) structure. replace (e) dry rotted joist in kind.

Open the permit page

$60,000
Aug 11, 2005Completed
final sign-off Dec 2005
2880 Green Stinstall decorative metal screen around exposed chimney flues at roof
Details
Permit
200508110081
Permit issued
Aug 11, 2005
Final sign-off
Dec 8, 2005

install decorative metal screen around exposed chimney flues at roof

Open the permit page

$500

Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

Contractors
Cairn Construction (2), T L Oliver Construction
Architects
Steven Geiszler, Steven Geiszler

Find contractors for work like this

Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.