T & L Construction
- Based in
- San Bruno
- On San Francisco permits
- Nov 2004 to Jul 2025
- Last 24 months
- 1 permit filed
11 permits since 2000: 8 completed, 3 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
3 kitchen remodel permits: 2 completed, 1 expired or cancelled. Typically 7 days from filing to permit and 110 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 24, 2025 | Completed final sign-off Sep 2025 | 2191 34th Av | to comply with nov# 2024-31086 and perform work previously approved by 2022-1227-9187: remodel 2nd floor kitchen/bathroom, replace damaged beam above living room, convert portion of ground floor garage area (260 sq ft) into a non-sleeping office and full bathroom.Details
to comply with nov# 2024-31086 and perform work previously approved by 2022-1227-9187: remodel 2nd floor kitchen/bathroom, replace damaged beam above living room, convert portion of ground floor garage area (260 sq ft) into a non-sleeping office and full bathroom. | $75,000 |
| Dec 27, 2022 | Expired or cancelled suspend Nov 2024 | 2191 34th Av | kitchen and bathroom remodel on 2nd flr; new bedroom & full bathroom on 1st flr, replace existing beam in living room area- either dry rot or inadequateDetails
kitchen and bathroom remodel on 2nd flr; new bedroom & full bathroom on 1st flr, replace existing beam in living room area- either dry rot or inadequate | $35,000 |
| Nov 15, 2004 | Completed final sign-off May 2005 | 111 Chestnut St | remodel existing kitchen add new cabinets. relocate sink.Details
remodel existing kitchen add new cabinets. relocate sink. | $28,000 |